provision of geotechnical site investigation, soil testing & rig positioning services at offshore locations contractor shall provide contractor personnel, services, equipment, tools and each and every item of expense necessary for the provision of geotechnical site investigation, soil testing services and rig positioning services fit for the purpose of offshore jack-up drilling rigs installations at offshore site on call-off basis for a period of 5 years.
supply of generic pipeline valves and relief valves on long-term agreement basis for a period of five 05 years. supplier to perform supply of ball, gate, globe, butterfly, check, plug, needle & diaphragm valves, proprietary relief valves & specific branded valves up to 12-inch for various qatarenergy locations on as and when required basis.
supply for extension pipe and distribution networks for sfirat, minizla, jamalia, sliman al ghrab, burglia, arisha-hawija district-kirkuk governorate iraq
provision of electric wireline logging engineering and technical support services including the provision new technology and specialized software applications. provision of log data processing and interpretation services as may be required.
the scope of work includes eleven 11 electrical plant change requests in various plants in dukhan fields comprising of the following; a replacement of lv swgr/dg set in khatiyah main b replacement of mm5/fm5 relays & cmac unit in khatiyah main c upgradation of flare mcc substation in khatiyah north d installation of evacuation sirens in fahahil & khatiyah sector plants 3 replacement of ac ups in fahahil & khatiyah sector plants
qatarenergy intends to acquire the services of contractor on a call-off basis for the duration of five 5 calendar years to carry out pipeline in-line inspection ili and integrity services for the following operational areas: 1.offshore operations 2.dukhan operations 3.mesaieed operations 4.refinery and 5.idd el-shargi operations qatarenergy at its sole discretion may award the services of the five qatarenergy locations under five separate contracts to one or more contractors.
supply of industrial cleaners semi-skilled equipped with equipment and tools necessary to carry out the cleaning & related services at offshore locationson dedicated crew & call-off basis. contract duration : five 05 years
call-off contract for industrial cleaning/spent catalyst & chemical transport at qp refinery, mesaieed. the objective of this contract is to utilize the services of contractor on call off basis for a total duration of five 5 years starting from the effective date of the contract to undertake idustrial cleaning, hydro jetting services, spent catalyst & process chemicals transportation at the following locations at qp refinery, mesaieed on a call-off basis. a,, qp refinery. b,, chemical plant. c,, berth no. 6 & 4 mesaieed. d,, all pipelines, stations and other entities operating between, , the refinery to both abu-hamour and doha. e,, all pipeline from the refinery to berth no. 6 & 4 f,, all pipelines interconnections between the refinery and other, , entities operating in mesaieed industrial city.
qatar petroleum qp requires services of an experienced contractor to provide routine, preventive and corrective maintenance services to traffic and pedestrian signal lights and traffic preemption equipment at mic and rlic
the scope for implementation of ot cyber security in gds, ngls, tf & terminal shall include the provision of detailed design, engineering, procurement, modification, demolition, installation, construction, tie-in, configurations, pre-commissioning, commissioning, performance testing and handover for cyber security of operations technology ot in mesaieed operations that covers ngl areas, tank farm & terminal and gds that include: new systems, equipment hardware and software, structures, materials required for construction/ installation/ modifications/ reconfigurations of/ to the existing facilities/ systems/ packaged units and those to replacement of the existing, which derived from and/ or implied by the performance of the scope. in order to carry out the scope, the contractor shall make available all manpower, materials, equipment, tools, transportations, storage, consumables, specialized materials/ equipment/ tools and other required resources to complete the contract.