Latest and live tenders published in all country. Click on any tender to view further details.
call-off contract for industrial cleaning/spent catalyst & chemical transport at qp refinery, mesaieed. the objective of this contract is to utilize the services of contractor on call off basis for a total duration of five 5 years starting from the effective date of the contract to undertake idustrial cleaning, hydro jetting services, spent catalyst & process chemicals transportation at the following locations at qp refinery, mesaieed on a call-off basis. a,, qp refinery. b,, chemical plant. c,, berth no. 6 & 4 mesaieed. d,, all pipelines, stations and other entities operating between, , the refinery to both abu-hamour and doha. e,, all pipeline from the refinery to berth no. 6 & 4 f,, all pipelines interconnections between the refinery and other, , entities operating in mesaieed industrial city.
qatar petroleum qp requires services of an experienced contractor to provide routine, preventive and corrective maintenance services to traffic and pedestrian signal lights and traffic preemption equipment at mic and rlic
the scope for implementation of ot cyber security in gds, ngls, tf & terminal shall include the provision of detailed design, engineering, procurement, modification, demolition, installation, construction, tie-in, configurations, pre-commissioning, commissioning, performance testing and handover for cyber security of operations technology ot in mesaieed operations that covers ngl areas, tank farm & terminal and gds that include: new systems, equipment hardware and software, structures, materials required for construction/ installation/ modifications/ reconfigurations of/ to the existing facilities/ systems/ packaged units and those to replacement of the existing, which derived from and/ or implied by the performance of the scope. in order to carry out the scope, the contractor shall make available all manpower, materials, equipment, tools, transportations, storage, consumables, specialized materials/ equipment/ tools and other required resources to complete the contract.
provision of services to develop a detailed design for the creation of a green area in pavlodar 20 hectares
supply, installation, implementation, training and maintenance and support of a commercial off-the-shelf fire station management fsm system.
epic for modification and improvement works to the existing occupied buildings at ngl complex, mesaieed. required as per the recommendations of mic qra 2015 and sq technical note on mitigation measures for ngl complex occupied buildings: which shall include: conversion of buildings nos. 7 & 9 into a new ngl laboratory. installation of toxic and flammable gas detectors at all occupied buildings. modification of the buldings hvac systems to close the fresh air intakes on detection of gas. upgrading the builidings to meet current building and safety codes and regulations and to meet safe haven standard. preparing the requirements for the demolition by other contractor at a later date of the buildings and portacabins that are to be abandoned.
supply of electrical equipment to bashiqa
contractor shall provide a tanker berthing assistance tug and supply all equipment, tools, tackle, personnel, services, supervision, consumable materials and each and every item of expense necessary for the provision of tanker berthing assistance tug at offshore locations. contract duration shall be one hundred twenty two 122 calendar months i.e. 10 years and 2 monthsfrom the effective date
modification of existing chemical store, associated building services and external works at dukhan.
qp refinery insurance assessor made risk observations / safety recommendations to qp with regard to containment of pool fires in susceptible fire zones & existing bund wall heights. hence, qp refinery initiated a study lc17106700 to review the kerbing / drainage requirements in fire susceptible zones and to recommend new kerbing / drainage system wherever required. also, existing bunds around tanks were identified which donot comply with refinery design criteria. this project is being carried out to implement the recommendations of study lc17106700. objective of this contract is to design, procure, install and construct new kerbing with associated drainage system at qp refinery in accordance with the scope of work, drawings and specifications. the main activities include but not limited to: new kerbing with drainage system, , design of new kerbing / grade slab / sump / manhole / drainage system., , underground scanning., , construction works., , hydrocarbon protection coating. increase of existing bund wall heights, , adequacy / storage capacity checks., , design of new bund / dyke walls, associated works to carryout the enhancement / modifications, etc., , construction works., , hydrocarbon protection coating.