Latest and live tenders published in bangladesh. Click on any tender to view further details.
construction of medical centre vertical extension 1st floor at bibiyana south residential area at perkul nabigonj hobigonj.
servicing & rewinding of damaged/burn-out submersible pump motor & other building pump motor for bangladesh national parliament employe building 448nos flat complex building no.a-3 d-type & c-1 at agargaon s.b. nagar
replacement of damaged/ unserviceable avr and very old service line of existing lifts of main building annex building and unclaus building of ministry of foreign affairs segunbagicha
major maintenance/renovation of existing wash room & installation of 2nos hand wash basins & 4 nos ro filter at primary teachers training institute ptti and renovation of toilet of urc at shibganj upazila of under primary education development programme-4 during fy 2020-2021.
construction of attached toilet hand wash basin and sanitary works at pti and dpeo office of under primary education development programme-4 during fy 2020-2021.
rehabilitation of ahmedabad & uttarbazar road by r.c.c & b.c from 1 mafis miah residence to madrasha 2 in front of mosque 2 from r&h road to nizam titi residence 1 ch 0131m to 0240m 2 ch 0111m to 0180m 3 ch 0120m under kulaura pourashava
construction of national board of revenue building 1st revised 12- storied building with 2 basement floors at sher-e-bangla nagar sub head remaining work for supply installation testing & commissioning of fire detection & protection system in/c sprinkler & gas suppression system
construction of national board of revenue building 1st revised 12- storied building with 2 basement floors sub head remaining work for supply installation testing & commissioning of 3 nos 1250kva electrical substation equipment with ht & lt cable 1 nos 1000 kva electrical substation equipment with ht and lt cable substation & ht cable for rmu & avr lt cable distribution with control panels
repair of damaged pavement by aggregate base type-i including premixed bituminous carpeting & seal coat work at ch 46.450 km. to 47.000 km. of mirpur - srimongal - - sherpur under road division during the year 2020-2021
emergency hbb work at 2nd part 4th part 10th part 11th part 13th part & 17th part km of rajnagar - sylhet balaganj road under road division during the year 2020-2021