Latest and live tenders published in bangladesh. Click on any tender to view further details.
construction of roads side l shape pucca drain at 12th p) k.m ch-11+085m to11+175m) out let step drain at 12th p) k.m r/s and 17thk.m p) & u shape drain ch-16+925m to16+950mr/s)of keranihat-bandarban road under bandarban road division during the year-2013-2014
construction of 2 two) nos. rcc box culvert 1.00mx1.50m) at 3rd p) and 6 th p) km. ch. 2+401m and ch-5+250m to 5+251m) of ramu-naikhongchari road under bandarban road division during the year 2013-2014.
repairing the damaged wooden decking by providing size wood of bailey bridge no.166/1, and 171/1 at 166 p) & 171 p) km bandarban-chimbuk-thanchi-alikadam-baishari-naikhongchari-gundum naikhongchari-gundum portion)road under bandarban road diision during the year 2013-2014
supplying of wire rope & unclamp for ferry & pontoon at patgati ferryghat under gopalgonj road division during the year 2013-14
maintenance work by providing carpeting and seal coat at 3rd p) km of chuadanga-darsana-jibonnagar-kotchandpur-kaligonj road r.748) under roads division, chuadanga during the financial year 2013-14
repair of bank protective work at the left bank of gumti river at jaforgonj from km 31.655 to km 31.695 under gumti o&m division bwdb comilla.during the year 2013-14.
river bank protective work at gumti left bank from km 39.650 to km 39.770=120m at upzilla debidwar in c/w "rehabilitation and strengthening of embankment on both side of gumti river" under gumti o&m division, bwdb, comilla during the year 2013-14.
bank protective work at gumti right bank at laksmipur from km 38.250 to km 38.350=100m at upazilla debidwar at upzilla debidwar in c/w "rehabilitation and strengthening of embankment on both side of gumti river" under gumti o&m division, bwdb, comilla during the year 2013-14.
bank protective work at gumti right bank at shibnagar from km 42.900 to km 42.960=60m at upazilla debidwar in c/w "rehabilitation and strengthening of embankment on both side of gumti river" under gumti o&m division, bwdb, comilla during the year 2013-14.
loop-cut and adjacent closure at km 47.500 gumti left embankment) in c/w rehabilitation and strengthening of both bank gumti embankment in rahimpur mouza of muradnagaor upazilla, dist. comilla under gumti o&m division during 2013-14.