Latest and live tenders published in bangladesh. Click on any tender to view further details.
repairing of road by seal coat & primer seal from ch. 21+000 to ch. 21+525 = 525.00m & ch. 21+875 to ch. 22+350 = 475.00m. toal = 1000.00 meter length of jhenaidah-kushtia-paksey ferry-dausrai road n-704) under road division, kushtia during the year 2013-2014.
existing pavement repair of potholes and seal coat at 6th km p), 7th km and 8th km p) trishal-balipara-nandail kanurampur) road.
de-launching bailey and filling the gap with sand filling, m.s pipe palisading,sand bag filling and providing of brick pavement in place of bailey bridges no. 11/1 and 12/2 of bariarhat-heanko-narayanhat-fatikchari road r-151) under chittagong road division during the year 2013-14
repairing different portion of damaged hbb pavement at 3rd p) km. ch.2+000m to 2+750m) of netrakona-bishiura-ishwarganj road under netrakona road division during the year 2013-2014.
supply of greasing & painting the hoisting system of different irrigation structure under pird project during the year 2013-14.
supplying miscellaneous mechanical/electrical spare parts & materials of bera pumping station under pabna mechanical o & m division during the year 2013-14.
cleaning water hyacinth from intake cannel & jangle from intake cannel slopes; cleaning 10 nos. trash rack of bera pumping station and cleaning & sweeping control room, pent house, toilet bera pumping station; making & maintaining flower garden in front of the pump house under pabna mechanical o & m division during the year 2013-14.
emergency repair of damaged pavement & potholes with seal coat and construction of soil earthen shoulder work at 9th km p) & 10th km p) of madanpur-modanganj-sayedpur road r-113) under narayanganj road division, during the year 2013-2014
repair the damaged road pavement of potholes by base type-ii, carpeting & seal coat work at 7th km p) of bhulta-rupgonj road under narayanganj road division, during the year 2013-2014.
emergency protective work of damaged embankment shoulder by construction of brick masonary toe-wall at 172nd p) chainage 171+518m to 171+538m) of bandarban-chimbuk-thanchi-alikadam-baishari- naikongchari-gundum road under bandarban road division during the year 2013-2014