Latest and live tenders published in united arab emirates. Click on any tender to view further details.
supply and replacement of corroded instrument & service air line at hypo plant. pipe details : application : compressed air temperat ure : 60 oc pressure : 11 ar material : astm a53 hot dip galvanized class : tgd-9 contact person: dipesh kumar chauhan 0522456862 d ipesh.chauhan@dewa.gov.ae
repair of all valve 10 inch face-to-face 568mm tag no53ekg10aa100 ody a216 wc stem 182f316 all a216 wc enp seat rptfe dom 2007.09 cl ass api 300 manufacturer new entec co ltd serial numer n708003, made in korea. total qty. 2 valves. work should include the followi ng:- 1- inspection & testing of valves efore reparing 2- repairing of valves with all require spare parts 3- testing and provided t certificate.
supply of furniture for sq staff quarters at japs supply & install heavy-duty single/unker ed along with mattress, pillow & lanket c ompletely ed: single ed full steel leaf type heavy ase mattress: single medical mattress 90x190x10 pillow: good quality soft pillow lanket: good quality doule ply soft ed sheet: single ed sheet with pillow cover.
replacement contact kit for ge make contactor type: cr305co**d
expansion ellow, size: dn 300, model: sse, type: standard spool for cep suction 85/86 lca11/12/13as001
supply of lvac ac cover with on/off push utton for mechanical operation.make:ge mpact plus 2000 a ac, type:ms41w20
supply of avl451102 m cycle 2 wheeler h.d. 250 cc
overspeed controller; ft3100-e01 complete with 19 rack, make alstom, part no.: c1000510, jaquet part .no.377z-04908 - used for stg control system.motheroard shall e configured as per dewa requirement
supply of grease high temperature chesterton - 615 615, one year minimum shelf life; 18 kg pail
envelope commissioning and air quality testing +g+m+4 as per the enclosed specification and drawings. for any query/site visit, p lease contact ms. aysha al remeithi on 04-3220993 or email: aysha.alremeithi@dewa.gov.ae payment terms as follows: advance payment: 20% preliminary assessment report/sumission of cx and air testing plan : 10% pe rform envelope commissioning: 30% perform air testing: 25% approval of final com missioning & air testing report: 15% perform uilding envelope systems tests air infiltrations test water ingress/penetration tes t exhaust re-entrainment test uilding performance test uilding envelope pressure uilding envelope air leakage