Latest and live tenders published in united arab emirates. Click on any tender to view further details.
supply of set of hex socket setscrew;pn-904;set comprises of 24x904.01, 9x904.02, 12x904.03, 04x904.04;for condensate extraction pump;ks-make;mo del -wkta 250/3;p-nr. 2-g12-0286241/2; e station ph-iii, o-ring seal set p/n. 412 seal set p/n. 412 for main condensate pump manf: ks ty: wkta 250/3 s.no. 2-g12-028624/1-2
supply of valve; ronze gate valve, size : 2, 150 ls; with oth end screwed, make: peglar / pex. uk. or equivalent, valve; gate; 1-1/4; rass; screwed
supply of jumo nissen fel tip paint marker white fpwhj-09001; size: 5/16 inches, jumo nissen feltip paint marker red fprej-09003; size: 5/16 inches, jumo nissen feltip paint marker lack fpkj-09004; size: 5/16 inches, jumo nissen feltip paint marker lue fpuj-09005; size: 5/16 inches
supply of kit repair servo valve actuator rhv 3000/140 for s.w.rec stop-check v/v gdp70aa002
supply of mechanical seal, elastomer ellow seal mg1 - rmg 12, urgmann, shaft dia 35mm, hot water application 120 oc seal type mg1/35- g606, m aterial code- q1vgg
supply of valve, gloe valve, hard face straight pattern, type : zxs - ut weld end. size : dn 50, pn 40 . material : 1.0460, nori - 40. make : ks - germany.
supply and farication of switchgear parts 1- twenty pieces of isolator on/off extension rode along with. gear 2- twenty pieces of ra ck in and rack out mechanism
supply of gtc-oda-p-t4 rx24015010 # on demand application, professional services # man days, implementation cost
caliration and certification of ultraproe. make: ue systems, model: up-9000sc sl nos- 940514 & 940515for more information or visit the site please contact mr. sajeevekumar velimattathil s. 0554328067
restoration of ultraviolet resistant gel coating of grp piping inlending plant at #g# station ph-i lock-101.0 scope of workthe idde r shall familiarize himself of the plant and the requirementsefore he sumits his id. he may visit the plant and see the internalstru ctural parts of the plant to evaluate the clear scope, quantum ofwork and the intricacies of the jothe scope of work for restoration of ultraviolet coating of grp pipingwill include ut not limited to:1.1 all the work including supply, moilization of material, ere ctionof scaffolding, access platforms and all other consumales required toexecute the work under this contract is sole responsiility of thecontractor.1.2 thorough washing of external surfaces of the pipes with water toremove loose scales ofdamaged top coating, d ust, dirt, salt depositsand pollutants, etc.1.3 thorough cleaning of surfaces with acetone or other suitalecleaner approved y dewa. 1.4 to apply a high quality transparent isophthalic, uv resistant cleargel coat of polyester / vinyl ester resin on the external su rfaces ofthe pipes, flanges, reducers and other grp fitting within the pipelength.1.5 all uv resistant gel coat to e applied manual ly y hand rush /rollers. spray application to e avoided.1.6 restoration of flow markings on the piping after coating.1.7 if unavoi dale the grating and the stair treads can e removed forgetting access to surface preparation and gel coat the grp piping.efore this is to e done, dewa shall e notified and the area shall earricaded with ropes andreflective tapes. however, contractor shallensure t hat access to entire plant is availale through an alternatepath.1.8 at no time, the entire handrail, grating or all stair treads sh alle removed. contractor shall e responsile for accidents caused due tohis negligence.1.9 all the removed gratings, handrails, plat forms to e restored andinstalled ack after the works.for site visit please contact mr. nosir @ 056-6093676, restoration of ultraviolet resistant gel coating of grp piping inlending plant at #g# station ph-i lock-201.0 scope of workthe idde r shall familiarize himself of the plant and the requirementsefore he sumits his id. he may visit the plant and see the internalstru ctural parts of the plant to evaluate the clear scope, quantum ofwork and theintricacies of the jothe scope of work for restoration of ultraviolet coating of grp pipingwill include ut not limited to:1.1 all the work including supply, moilization of material, ere ctionof scaffolding, access platforms and all other consumales required toexecute the work under this contract is sole responsiility of thecontractor.1.2 thorough washing of external surfaces of the pipes with water toremove loose scales of damaged top coating, d ust, dirt, salt depositsand pollutants, etc.1.3 thorough cleaning of surfaces with acetone or other suitalecleaner approved y dewa. 1.4 to apply a high quality transparent isophthalic, uv resistant cleargel coat of polyester / vinyl ester resin on the external su rfaces ofthe pipes, flanges, reducers andother grp fitting within the pipelength.1.5 all uv resistant gel coat to e applied manual ly y hand rush /rollers. spray application to e avoided.1.6 restoration of flow markings on the piping after coating.1.7 if unavoi dale the grating and the stair treads can e removed forgetting access to surface preparation and gel coat the grp piping.efore this is to e done, dewa shall e notified and the area shall earricaded with ropes and reflective tapes. however, contractor shallensure t hat access to entire plant is availale through an alternatepath.1.8 at no time, the entire handrail, grating or all stair treads sh alle removed. contractor shall e responsile for accidents caused due tohis negligence.1.9 all the removed gratings, handrails, platforms to e restored andinstalled ack after the works