Latest and live tenders published in united arab emirates. Click on any tender to view further details.

1531 Asian Countries Tenders
GTN :14113386
Location :  Dubai - Dubai, United Arab Emirates
Tender Value : NA
Last date :  06 Sep, 2018

to carryout complete farication, supply and installation of dismantling type hand rails and toe plates, phase#2 rp discharge line tr enches of desalination units. idder shall e ensure supplied materials should e suitale for present harsh sea water environmental con dition. scope of work to carryout complete farication, supply and installation of dismantling type hand rails and toe plates, phase# 2 rp discharge line trenches of desalination units, actual volume of the work shall e checked and confirmed y the idder after site s urvey. further to the survey the idder shall provide detailed procedures with activity reakdown including method statement and risk assessment for the scope of work.# site visit can e made any working day from sunday to thursday, etween 07:30 and 14:30hours with prior appointment from concerned department manager of dewa. contact engineers details. mohammad rafi 0529740743/048044505 zaid hussain: 0505805854/048044505 a.#surface to e coated shall e thoroughly washed using clean w ater to remove all adherent salts, chemical fumes, dust, etc. prior to last cleaning. # .#moisture and oil separators shall e used y the contractor for lasting should e checked every 6 hourly and as and when needed for contamination. contaminated filters/separator s should e changed immediately. c.#surface should e free from sharp edges, chemicals, dust, solule salts, grease & oil or any other contamination prior to coating. d.#prepared surface shall meet the requirements of sa 2.5 as per iso 8501e.#any surface adjoini ng the existing coating, the coated surface shall e roughened to aout 25 mm for etter adhesion of newly applied coatings to existing coating. f.#last cleaned surface shall e coated with one complete application of primer as soon as practicale or efore any discolo ration occurs on the surface.# g.#any crevices, minor scratches shall e filled with coating manufacturer recommended fillers prior to applying the coatings. h.#coating application shall e y airless spray only i.#applied coat shall have minimum dry film thicknes s on each coat. during coating application wet film thickness, if applicale, shall e measured to confirm desired dft will e achieved . # j.#where coating is to e applied y rush or roller contractor to ensure smoothfinal appearance with negligile rush marks left i n the applied coating.# k.#any spots or repairs in application shall e completely coated efore the next coat is applied, within recoat interval time.# l.#corners and edges of the surface shall e rounded to a radius of 25mm y grinding prior to application of coa tings. m.#topcoat color should e as per the existing color code only and any changes will e notified to the contractor. n.#repairi ng and remedial works on identified defects shall e according to the touch up and repair recommendations of coating manufacturer onl y. # o.#environment condition shall e checked and recorded efore starting of work and every 2 hourly on same day till the completio n of work. general conditions forenvironment condition shall e as elow:-# i.#surface temperature shall e etween 10oc and 40oc ii.# relative humidity shall e less than 85%. iii.#surface temperature shall e more than 3oc with respect to the dew point temperature. i v.#there shall not e rain or strong wind that can affect cleanliness of the surfaces. specification material hand rails with toe plate ms pipe & ms plate post: schedule 40 ø19 to 50mm # @interval of minimum 1mtr top and ottom rail: schedule 40 ø19 to 50mm # distance etween top and ottom rail # minimum 400mm. ase plate: 10 mm thick plate with holes toe plate: mild steel, size 4 to 10mm thick 75 to 150mm width. fixings: m12 x 50mm 4 no#s per post coating system specification. surface preparation: hydro last cleaning, manual and mechanical cleaning. primer coat: surface tolerant epoxy coating. dft # 150 microns mid coat#: polyamide cured epox y coatings. dft # 125 microns top coat#: polyurethane coatings. dft # 50 microns color code for handrails: traffic yellow # ral 1023 # 325 microns. paint manufacturer: only gloally renowned coatings shall e used s uch as hepmel, jotun, sigma, akzanoel, etc

1532 Asian Countries Tenders
GTN :14115570
Location :  Dubai - Dubai, United Arab Emirates
Tender Value : NA
Last date :  06 Sep, 2018

restoration of ultraviolet resistant gel coating of grp piping inlending plant at #g# station ph-i lock-101.0 scope of workthe idde r shall familiarize himself of the plant and the requirementsefore he sumits his id. he may visit the plant and see the internalstru ctural parts of the plant to evaluate the clear scope, quantum ofwork and the intricacies of the jothe scope of work for restoration of ultraviolet coating of grp pipingwill include ut not limited to:1.1 all the work including supply, moilization of material, ere ctionof scaffolding, access platforms and all other consumales required toexecute the work under this contract is sole responsiility of thecontractor.1.2 thorough washing of external surfaces of the pipes with water toremove loose scales ofdamaged top coating, d ust, dirt, salt depositsand pollutants, etc.1.3 thorough cleaning of surfaces with acetone or other suitalecleaner approved y dewa. 1.4 to apply a high quality transparent isophthalic, uv resistant cleargel coat of polyester / vinyl ester resin on the external su rfaces ofthe pipes, flanges, reducers and other grp fitting within the pipelength.1.5 all uv resistant gel coat to e applied manual ly y hand rush /rollers. spray application to e avoided.1.6 restoration of flow markings on the piping after coating.1.7 if unavoi dale the grating and the stair treads can e removed forgetting access to surface preparation and gel coat the grp piping.efore this is to e done, dewa shall e notified and the area shall earricaded with ropes andreflective tapes. however, contractor shallensure t hat access to entire plant is availale through an alternatepath.1.8 at no time, the entire handrail, grating or all stair treads sh alle removed. contractor shall e responsile for accidents caused due tohis negligence.1.9 all the removed gratings, handrails, plat forms to e restored andinstalled ack after the works.for site visit please contact mr. nosir @ 056-6093676, restoration of ultraviolet resistant gel coating of grp piping inlending plant at #g# station ph-i lock-201.0 scope of workthe idde r shall familiarize himself of the plant and the requirementsefore he sumits his id. he may visit the plant and see the internalstru ctural parts of the plant to evaluate the clear scope, quantum ofwork and theintricacies of the jothe scope of work for restoration of ultraviolet coating of grp pipingwill include ut not limited to:1.1 all the work including supply, moilization of material, ere ctionof scaffolding, access platforms and all other consumales required toexecute the work under this contract is sole responsiility of thecontractor.1.2 thorough washing of external surfaces of the pipes with water toremove loose scales of damaged top coating, d ust, dirt, salt depositsand pollutants, etc.1.3 thorough cleaning of surfaces with acetone or other suitalecleaner approved y dewa. 1.4 to apply a high quality transparent isophthalic, uv resistant cleargel coat of polyester / vinyl ester resin on the external su rfaces ofthe pipes, flanges, reducers andother grp fitting within the pipelength.1.5 all uv resistant gel coat to e applied manual ly y hand rush /rollers. spray application to e avoided.1.6 restoration of flow markings on the piping after coating.1.7 if unavoi dale the grating and the stair treads can e removed forgetting access to surface preparation and gel coat the grp piping.efore this is to e done, dewa shall e notified and the area shall earricaded with ropes and reflective tapes. however, contractor shallensure t hat access to entire plant is availale through an alternatepath.1.8 at no time, the entire handrail, grating or all stair treads sh alle removed. contractor shall e responsile for accidents caused due tohis negligence.1.9 all the removed gratings, handrails, platforms to e restored andinstalled ack after the works

1533 Asian Countries Tenders
GTN :14115571
Location :  Dubai - Dubai, United Arab Emirates
Tender Value : NA
Last date :  06 Sep, 2018

caliration and certification of ultraproe. make: ue systems, model: up-9000sc sl nos- 940514 & 940515for more information or visit the site please contact mr. sajeevekumar velimattathil s. 0554328067

1534 Asian Countries Tenders
GTN :14115572
Location :  Dubai - Dubai, United Arab Emirates
Tender Value : NA
Last date :  06 Sep, 2018

scope of work: 1.#collect 250 kw, 11kv induction motor from jaal ali power station. 2. test run the motor and record the viration re adings. 3.#dismantle motor completely, inspect the stator windings and all other parts and prepare condition report. 4.#carry #out t he incoming electrical tests & records readings. 5.#steam wash, clean stator windings and dry in oven to required temperature. 6.#co mplete overhaul stator to class-f insulation using polyester class-h varnish and cure in ake in oven. 7.#carry- out the tests prior to varnishing: insulation resistance test, polarization index, and record readings. 8.#steam wash rotor of motor and dry in oven. 9. #check dimension of oth earing journals, earing housing and provide report. 10.#overhaul the coolers and repair anyroken cooler tue . 11.#check the trueness of rotor and dynamically alance rotor with all rotating parts and prepare report. 12.#re-assemle aove overh auled motor with new earings de 6228-c3 and nde 7322-e use only skf/fag earings. 13.#test run aove assemled motor at no-load in pres ence of emd k staff and provide report. 14.#repaint complete motor with similar color after cleaning motor ody in two coats a-heavy duty ase primer -with paint ral7004. 15.check the auxiliary terminal ox of space heater&rtd replace/repair if required. 16.#deliver to refurish motor to dewa site along with reports.for any technical clarifications please call mr mohamed adelaset 0551961095

1535 Asian Countries Tenders
GTN :14115575
Location :  Dubai - Dubai, United Arab Emirates
Tender Value : NA
Last date :  06 Sep, 2018

caliration and certification of time domain reflectometer, tdr. make: sea kmt, model: teleflex, sl no- 112741812for more information or visit the site please contact mr.sajeevekumar velimattathil s. 0554328067

1536 Asian Countries Tenders
GTN :14115577
Location :  Dubai - Dubai, United Arab Emirates
Tender Value : NA
Last date :  06 Sep, 2018

removal and re fixing of insulation and liner plate of whr hotspot rectification work # k station japs. period of work 04 days during unit shut down scope of work ·#moilize the laor, equipment, tools, etc. on 24 hrs. notice period ·#remove the liner plate i n the designated areas. ·#rethread the plate-fixing stud m12. ·#remove the existing insulation and clean the casing surface. ·#int imate dewa personnel in case of any anormalities / damages found in the oiler casing plate. ·#install the new insulation lankets. ·# contractor shall rectify any anormalities / deformation found in the liner plate. ·#in case of complete damage of the liner plate, d ewa will supply new liner plate and contractor shall faricate and fix the plate according to site conditions. ·#fixthe liner plate and ensure that flue gas will not enter to oiler casing. ·#fix the nut and washers ack and tack weld the nuts with stud. ·#housekeep the area and dispose scrap insulation as per dewa instruction. ·#jo completion acceptance is sujected to dewa personnel inspection and verification. ·#sumit work completion report with clear photos. dewa scope 1.#scaffolding 2.#electricity 3.#water 4.#insulatio n 5.#liner plate 4ft x 8ft 6.#m12 stud & nut additional requirements from contractor ·#after work completion, dewa will do the th ermographic inspection. contractor shall rectify any further hotspots oserved in the same area. ·#the contractor shall rectify any a normalities / damages of oiler casing due to hotspot oserved in a period of one yearfrom the date of jo completion. warranty ·#the minimum warranty period for the work shall e of one year from the date of completion of work accepted y dewa. ·#in case of any damag e/defect of the work carried out under this contract within this warranty period, the contractor shall attend and carry out the nece ssary repair work and rectify the defect within short period without affecting the production of electricity and water. general ter ms & conditions ·#the contractor shall visit the site and make himself fully familiar with the work scope, plant access, facilities, complexities, safety measures etc., efore he sumits his id. ·#contactor shall sumit method of statement and schedule upon receipt of po. ·#the contractor shall ensurehousekeeping on a daily asis and the contractor shall e responsile for all waste material dispo sals to designated places. ·#all dewa safety & environment policy, rules and regulation shall e followed at work site during the exe cution of the work. the contractor#s engineer should e familiar with safety regulations while working in a hazardous area. ·#scaffol ding if required shall e arranged y dewa. ·#crane if required shall e arranged y dewa. ·#all rigging and transporting equipment shou ld e arranged y the contractor. this equipment should e duly tested and certified y the 3rd party inspection agency and the certific ates should e produced on demand. qualified rigger, mechanics should e provided. ·#the work shall e executed under dewa supervisionand as per quality/schedule requirement. ·#contractor#s supervisor shall e availale at site throughout the period of work. ·#entry p ermits for the staff/workers should e applied with passport copies having valid visa. persons, whose names are not availale in the l ist, will not e allowed to enter the powerhouse. ·#entry permits for the vehicle should e applied with copies of vehicle registratio n. ·#dewa will arrange necessary ptw / lc / hwp from operation, chemical la / fire department clearances to carry out the scope of w ork under this contract. ·#the contractor upon receiving the work permit shall first ensure a safe working condition. ·#all the pers ons should wear all the required ppe while at work. ·#all material and tools rought in shall e declared at powerstation security ga te and the list of these items shall e signed y dewa security. the copies of these documents shall e lodged with dewa engineer in-ch arge on daily asis. this document will e the asis for the clearance gate pass to take them out on completion of the jo. ·#service air, electricity and water for work at dewa site. it is the responsiility of the contractor to have his own arrangement in extendin g the electricity and water utility to his places of work including lighting.

1537 Asian Countries Tenders
GTN :14107474
Location :  Dubai - Dubai, United Arab Emirates
Tender Value : NA
Last date :  05 Sep, 2018

supply of seat for dn300 ace utterfly valve. material: epdm food grade, p/n.3, dwg no. j1093, manufacturer: ace valve co., ltd. korea. for l - 2 lending plant, seat for dn80 ace utterfly valve, material: epdm food grade, p.n. 3, dwg no. j1068, manufacturer: ace valve co. ltd. korea. for l- 2 lending plant, seat for dn150 ace utterfly valve, material: epdm food grade, p.n. 3, dwg no. j1084, manufacturer: ace valve co. ltd. korea. for l-2 lending plant

1538 Asian Countries Tenders
GTN :14107487
Location :  Dubai - Dubai, United Arab Emirates
Tender Value : NA
Last date :  06 Sep, 2018

technical and general specification of outsourcing work m station, jeel ali power station title: dismantling, servicing, overhauling, installation and pressure testing of lock 20 & 30 dfo system plate type heat exchanger. no of phe: 04 nos. duration: 06-08 daysf or more clarification you may contact arvind prakash- +971553905432 a.#scope of work: ·#moilize men/equipment. ·#sumit the followi ng documents and get ptw permit to work and lc line clearance document from dewa. o#method statement o#risk assessment of the wo rk o#tool ox talk report. ·#conduct site survey and safety inspection to assess the working environment. ·#ensure area is correctly secured and safe to work on in all respects. ·#ensure positive line isolation and proper depressurizing of the lineefore start of w ork. ·#if the working environment safe, then proceed with the following steps. ·#dismantle the heat exchanger connections, foundatio n olts and install lind flanges on pipe connections. ·#remove the heat exchanger. dewa will supply crane ·#transport the phe from dewa jeel ali, m station to contractor workshop. ·#dismantle the heat exchanger using special tools. ·#carryout inspection on all pl ates 237 no#s. dewa representative will witness. ·#generate report on existing plate conditions. ·#carry chemical and hydro jet cleaning of all plates 237 no#s. ·#conduct crack detection of individual plates to identify leaks if any using light ray test meth od. excessive corrosion may have caused minute pinholes or cracks that are notvisile to naked eye. ·#if total quantity of damaged p lates are within 10% of installed quantity then it has to e removed / replaced dewa will advise after inspection dewa will supply the plates if required ·#if total quantity of damaged plates are more than 10% then it has to e replaced dewa will supply the pla tes. ·#replace the gaskets dewa will supply the gaskets. ·#carryout service and paint on end frames and accessories. ·#carryout s ervicing of nut & olts and tie rods. ·#assemle the plates according to plate placement pattern. ·#prepare and carry out hydro pressu re test on oth sides of the unit dewa representative will witness. ·#deliver the phe to dewa jeel ali, m station ·#assemle the phe, all accessories & pipe connections ·#sumit report on the activities carried out with all details & photos. ·#sumit the report of performance analysis. ·#handover and demoilize. ·#efore sumitting the id, the contractor shall visit the site and e fully familiar w ith the work scope, plant access, facilities, complexities, safety measures etc. .#warranty ·#the warranty period for the work sha ll e one year from the date of completion of work certified y dewa. ·#in case of any damage/defect of the work carried out under thi s contract within this warranty period, the contractor shall attend and carry out the necessary repair work and rectify the defect w ithin short period without affecting the production of electricity and water. c.#general terms & conditions ·#the contractor shallensure housekeeping on a daily asis and the contractor shall e responsile for all waste material disposals to designated places. ·# all dewa safety & environment policy, rules and regulation shall e followed at work site during the execution of the work. the contr actor#s engineer should e familiar with safety regulations while working in a hazardous area. ·#scaffolding if required shall e arra nged y dewa. ·#crane if required shall e arranged y dewa. ·#all rigging and transporting equipment should e arranged y the contracto r. these equipment should e duly tested and certified y the 3rd party inspection agency and the certificates should e produced on de mand. qualified rigger, mechanics should e provided. ·#the work shall e executed under dewa supervision and as perquality/schedule requirement. ·#contractor#s supervisor shall e availale at site throughout the period of work. ·#entry permits for the staff/workers should e applied with passport copies having valid visa. persons, whose names are not availale in the list, will not e allowed to e nter the powerhouse. ·#entry permits for the vehicle should e applied with copies of vehicle registration. ·#dewa will arrange neces sary ptw / lc / hwp from operation, chemical la / fire department clearances to carry out the scope of work under this contract. ·#t he contractor upon receiving the work permit shall first ensure a safe working condition. ·#all the persons should wear all the requ ired ppe while at work. ·#all material and tools rought in shall e declared at powerstation security gate and the list of these ite ms shall e signed y dewa security. the copies of these documents shall e lodged with dewa engineer in-charge on daily asis. this doc ument will e the asis for the clearance gate pass to take them out on completion of the jo. ·#service air, electricity and water f or work at dewa site. it is the responsiility of the contractor to have his own arrangement in extending the electricity and water utility to his places of work including lighting.

1539 Asian Countries Tenders
GTN :14107492
Location :  Dubai - Dubai, United Arab Emirates
Tender Value : NA
Last date :  05 Sep, 2018

supply of hioki humidity logger lr5001, hioki temperature logger lr5011, hioki communication adapter lr5091

1540 Asian Countries Tenders
GTN :14107500
Location :  Dubai - Dubai, United Arab Emirates
Tender Value : NA
Last date :  06 Sep, 2018

supply of circuit reaker first trip analyzer, capale to capture load contact timing measurement for main contacts, current & voltage profile o f closing and tripping coil. primary current measurement through ct. trigger recording should e on change in coil voltage. current c lamps with long nose, lower amplitude 2ma-1a - and high frequency. screen with clear resolution crocodile clamps, cales. licensed analysis software. hard carry case. low weight and easy portale. caliration for instrument and all its accessories valid for 1 year . warranty valid for 2 years. training on the usage for one full day at dewa site. recommended make: camlin power / megger or equiv alent reputed manufacturers from europe / us / japan.

Get United Arab Emirates Tender Alert...

651146