Latest and live tenders published in united arab emirates. Click on any tender to view further details.
additional repairing works on the pump erps clyde pump sent for complete overhauling.overhauling reference po# 3052001449 please contact mr. noor 04-3229439 for further clarifications if required scope of works: 1. id & od machining of the pump case wear rin gs 2. assembly of the case wear rings to pump 3. testing of pump
modify, supply & replacement of package ac units condenser coil at zabeel tent. general: ø#the contractor shall visit the site assess the work required and quote for lump sum accordingly. ø#all the materials in general will conform as per latest standar and shall be submitted to dewa for engineers approval. ø#the contractor is required to take all precaution. so as not damage any the existing equipment/ structure etc# contractor staff is required to wear proper personal protective equipment at all time on the site. ø#the contractor shall deploy the skilled ac technicians for carrying out the maintenance / installation works. contact person for site visit mr. mohamed obeid: 052 6973337, 04 3227879 mr. mohideen: 055 3810513, 3227879. scope of work ø#modify, supply and replacement of existing package ac unit condenser coil both circuits with necessary modification of gas pipes, freon, to replace same as existing ø#contractor shall visit the site and take necessary measurement and connections as per existing conditio ns exactly same. ø#contractor to recover gas from the system. ø#remove the existing condenser coil and install new coil with neces sary modification of gas pipes. ø#contractor to carry out leak testing with nitrogen gas. ø#contractor to hold the pressure for 24 h ours to confirm. ø#contractor to proper flushing of the coils and proper connections with the leak test. ø#contractor to replace fil ter drier core same as existing. ø#contractor to vacuum the system from moisture.
supply of flow control signal processor for gt ventlation system, multi safe, type:ms96-11ex0-r/24vdc, ident no.:5231407, make:turck
replacement of 24 no. power junction boxes and 75 no. of power supply cockets at hrsg 4, hrsg 5 and phase-iii deaerator e-station: s cope of work: 1.#removal of existing 24 no. lighting jbs, 75 no. 230v 1-ph 13a- 10 no.; 110v 1-ph 16a # 35 no.; 230v 1-ph- 6 no.; 3 80v 3-ph 63a # 24 no. power supply sockets, cable connections and cable glands. 2.#supply, installation, testing and commissioning of 25 no. of lighting jbs and 75 no. power supply sockets. 3.#junction boxes shall have weather proof and grp material and the siz e shall be not less than mentioned in clause: 2-a of this enquiry scope. 4. power supply sockets with plug shall be industrial type similar to the existing and shall be suitable for highly corrosive sea shore environment. 5. cable re-glanding and termination i
supply of limit switche, to monitor valve positions of air drayers, model:r1140/r1149, make: amtrobox.
supply of valve complete type : gate, size dn50, class 1500# end bw. design pr 73 bar, design temp 524 deg c suitable for motor operation, body in a 182 gr f22 valve drg no c5019604 fig 3088 douglas cherro make valve complete type : gate, size dn50, class 800# end bw. design pr 6.4 bar, design temp 215 deg c suitable for motor operation, body in a105 valve drg no c5019605 fig 3088 douglas cherro make
supply of pilot regulator, make: gorter controls, type baai: p095-mfs, ps/pu: 100bar, ts: -20/60c, pt/date: 150bar 04/2008, wd: 0.5-12bar, wds : 1.5-5bar, standard: en 334, din-dvgw: ng-4301au0385, serial: 20070288258, year: 2008, client ref: 22ekc24aa051. used for water ba t h heater monitoring valve. wearing parts for pilot regulator, make: gorter controls, type baai: p095-mfs, data sheet drawings fig 9, 10 positions nos 05, 25, 2 6, 29, 35, 36, 37, 38, 41, 42, 46, 40, ps/pu: 100bar, ts: -20/60c, pt/date: 150bar 04/2008, wd: 0.5-12bar, wds: 1.5-5bar, standard: en 334, din-dvgw: ng-4301au0385, serial: 20070288258, year: 2008, client ref: 22ekc24aa051. used for water bath heater monitoring v a lve.
supply of bushing complete with accessories. hv line, make: elmek, type: din 30nf/250, l1 561 mm, drawing no. e2040303, tinned plated termin als, viton gaskets, without arcing horns, for areva make earthing transformer, ainr sub station
comprehensive annual maintenance of building management system bms at ruwaiyyah garage scope of works ø#the contractor is required to quote lump sum price for maintenance of building management system including spares. ø#the contractor is liable for coordination with the associated installation/contractors in all aspects to maintain the system in good operation condition and to ensure contin uous operation of the systems without breakdown. ø#should we experience a breakdown in any of equipment/system at any time of the da y or night, you will respond to our request with your 24 hours emergency call out system available 7 days a week all year round. ø#r esponding time to breakdown calls is within 1 hour after receipt of notification. ø#the system shall be inspected and
mini clamp on current sensor. 0.5 in. 127mm opening, max dc current : 5a, part 835146, make: meggar with manufacturer callibratio n certificate and waranty certificate.