Latest and live tenders published in united arab emirates. Click on any tender to view further details.
foam analysis/testing of aqueous film-forming foam afff and fluoroprotein foam concentrates as per applicable standard and other r equirements. quantity of eight samples to be tested by service provider with the following parameter and test method. parameter - t est method 1 appearance- visual 2 specific gravity @ 20 deg c - astm d 4052 3 ph @20 deg c- ph meter 4 sediments- astm d 2709 5 ki nematic viscosity- astm d 445 6 surface tension- astm d 971 7 25% drainage temp. 3% blend- volumetric 8 expansion ratio3% blen d- volumetric 9 fire extinguishment performance small scale test- msc circular 1312 result/report of the test should be submitt ed for reference purposes. sample to be collected by the service provider as per their procedure. after testing, residue of the sa
supply of preliminaries# # the contractor, lighting circuit layout and emergency evacuation plan with proper exit signs lights layout
supply of hose hydraulic hose id- 3/4, working pressure- 275 bar, temp.200 deg.c, hose material outside ss wire braided, inside synthetic rub ber, length - 780mm, both side ss 304 male fitting with end washer for whb rexroth hyd. system hose hydraulic hose id 1/2, work.press.:275 bar, temp.:200 deg. cel., outside ss wire braided, inside synthetic rubber, length:950mm, one end male 1/2npt, other end male 1/2bsp ss 304 with end washer for whb rexroth hydraulic system.; temp. 200 deg. cent. outsi de ss wire braded inside teflon length 950 mm, one end male 1/2npt, other end male 1/2bsp ss304 with end washer.;mmd-e hose hydraulic hose id 1/2, working pressure 275 bar temperature:200degree celcius, hose material synthetic rubber, length:850mm, w ith both side ss304 female fitting end washers.
supply of digital multimeter part number: fluke-101 manufacturer: fluke name: ethernet tester part number: tc-nt3 manufacturer: trendnet name: visual fault locator laser part number: fls-140 manufacturer: exfo name: optical attenuator -5 dbm 10pcs/pack part number: at-lcu-10p5 manufacturer: flypro name: optical attenuator -10 dbm 10pcs/pack part number: at-lcu-10p10 manufacturer: flypro
complete overhauling & testing of compressor of mushrif reservoir. make#fini# type#e.c. pulsar concept se 119-500-# code#683tm5a7220 1# sl. no#1060291491# capacity#695 l/min# volum flow#24.56 cfm# pressure#10 bar# power#5.5 kw / 7.375 hp# voltage#400# phase#3# freq uency#50 hz# current#12.7 amps# please contact mr. raj 04-3229440 for further clarifications. scope of work for fini air compres sor overhauling & testing the contractor shall perform the work as per details specified herein. required work detail is in fini ai r compressor overhauling & testing. the below list of technical requirements are to be completed. ##contractor to check the compress or and fully aware the scope of works to be carried out ##compressor unit to be collected from dewa premises and vice
supply of cal.of portable hydrogen meter s.n.7882
supply of hypo chlorination building inside area pipes coating warranty: 02 years
supply, installation & commissioning of ceiling suspended decorative split unit 5 ton 1qty and decorative split units 3 ton 2qty at k # stationsupply, installation and commissioning of ceiling suspended decorative split unit 5 ton 1qty and decorative split u nits 3 ton 2qty at k # station, emd new workshop and i & c workshop.a. required unit specification for 3 ton decorative split ac # 2 qtytype split a/c unit - decorativenominal capacity 3.0 tonrefrigerant ozone friendly refrigerant # r407 or r410make : any standa rd brandb. required unit specification for ton ceiling suspended decorative split ac 1 qtytype split a/c unit # ceiling suspende d decorativenominal capacity 5.0 tonrefrigerant ozone friendly refrigerant # r407 or r410make : any standard brandunits to be instal led at below location:location qtyk
outsourcing work l station phase i, jebel ali name of work: scope of work for hrsg 81/82/8 3/84 duct burner flame stabilizers replacement work. period of work: 5 days during shut down of each hrsg tentative date of shut do wn period from 01.10.2020 to 30.04.2021 replacement quantity: total 200 stabilizers 50 nos / hrsg in 4 hrsgs, material-ss-310 sc ope of work: . ·#the contractor shall visit the site and make himself fully familiar with the work scope, plant access, facilities, complexities, safety measures etc., before he submit his bid. ·#the shutdown period will be from 01.10.2020 to 30.04.2021. party wi ll get one unit at a time. therefore, party has to come to the site four times to execute the job. ·#to get a ptw, hwp contractor ha s to submit risk assessment forms and
supply of complete set for ansaldo make motor-type ctv 1000 y12, make: ansaldo, with accessoreis having following part num ber: emr191348, emr148396, emr103580, emr181069, emr102582, emr102291, emr162804 assembly motor fan-casing, make ansaldo: part no. emr252518 for phase 1 potable water pump motor assembly motor fan-casing, make ansaldo: part no. emr263947 for phase 2 distillate extraction pump motor