Latest and live tenders published in all country. Click on any tender to view further details.
procurement is to replace the current in house incident management system used for search and rescue, maritime assistance, and ship sourced pollution response. due to the bespoke nature of the current system, amsa requires respondents to submit proposals to deliver the services over 2 phases, through separate contracts:
amsa wishes to engage a single service provider able to provide 2 oil recovery vessels in accordance with the statement of requirements. the rft is conducted through an open tender process, including: high level essential requirements, evaluation of tenders to a short list, amsa inspection or capability testing of all shortlisted types of vessels:
supply of credit assessment shadow shopping study the study will gather information about the experience of residential consumers when purchasing post-paid telecommunications services.
project will be managed by the armys project management unit, 19th chief engineer works 19 ce works who have the role of project manager or contract administrator for the duration of the project. 19 ce works and the successful contractor will work in conjunction with the client international policy division and user vpf/vmf. a summary of the scope of works is as follows: works package 1 - cook barracks port vila, efate: demolishing various existing buildings constructing the following new facilities 2 x double storey soldier living-in accommodation facilities magazine facility armoury officers mess soldiers mess and kitchen medical facility vehicle workshop vehicle shelter secure hardstand engineers workshop boat shed training facility chapel band house obstacle course 12 x married quarters relocating the base entrance including construction of a new guard house refurbishing 6 x existing married quarters refurbishing the fire station including construction of a new appliance bay generally refurbishing a number of other buildings undertaking below ground services upgrades including electrical and wastewater treatment undertaking a road network upgrade undertaking ict upgrades providing temporary facilities for vmf use during construction, works package 2 - tiroas barracks luganville, espuiritu santo: constructing a new magazine facility constructing a new armoury constructing a new medical facility concept site plans for cook and tiroas barracks are attached as an information document. these may be revised during the atm process and cannot be relied upon. commencement of works package 1 is expected in mid-2020. it is intended that works package 2 is delivered concurrently, with mobilisation to luganville shortly after commencement at port vila.
review, co-design and delivery of a pilot program for ses band 1 employees.
demolition of existing facilities and construction of new commercial centre to accomodate army and airforce canteen service aafcans facilities such as entry, dining, café and main serveries areas, administration office, defence bank and carparking at swartz barracks. establishment of temporary facilities for defence bank and aafcans will also be required at swartz barracks, so they can continue providing their services during construction of the new commercial centre.
provide advance notice of an upcoming approach to market atm, which is proposed to be conducted via an open invitation to register itr and limited request for quote rfq or request for tender rft or similar, with the itr scheduled for release by the commonwealth of australia represented by the department of defence defence by early 2020. itr request documentation will be made available on austender.
project will deliver a new hangar facility for the air force cadets. this will include a hangar, briefing room and an apron connecting the facility to the taxiway.
supply of department of the environment and energy’s, supervising scientist branch ssb is tasked with protecting the alligator rivers region arr of northern australia from the effects of uranium mining. at present, ranger uranium mine is the only operational mine in the arr and must cease operations in 2021. the mine must finish decommissioning and revegetation of the site by 2026.
geoscience australia is seeking expressions of interest from landowners to host new global navigation satellite system gnss ground station sites on their land. if your land is within the predetermined areas and meets the technical requirements, geoscience australia would like to discuss the opportunity to establish a new gnss ground station site on your property.