provision of new master key system with all mechanical components comprising of security construction equipment committee scec endorsed products. scope also includes upgrade of existing access doors with the new electronic access control system eacs, electronic key cabinets, door lock cylinders and locks replacement with new master key system to multiple buildings at the rmc duntroon and adfa.
flood control works including stormwater detention basin, excavation and installation of a new low level outlet, raising of pits and installation of weir control, installation of subsoil drainage, replacement of swale, replacement of asbestos containing pits, conduit works and landscaping works at simpson barracks.
scope includes compliance and maintenance upgrades to make the range compliant with current standards and maintain capability. the works include repairing the target trench, reparing the stop-butt structure, bullet catcher remediation, construction of new ballistic side walls, reconfiguration of the firing mount or shelter to be compliant with defence standards, lane marker remediation, sign remediation, installation of new signange and civil works.
project focuses on the building refurbishment and maintenance works at the air traffic control tower and approach control. these works consist of end of life refurbishment of the existing air traffic control tower with new finishes, fixtures and equipment. the scope also includes minor modification of the building is required to meet statutory requirements associated with refurbishment.
project involves the refurbishment and remediation works including internal and external finishes, kitchenette refurbishments, ablution refurbishments and compliance work to kapooka company headquarters. scope of works also includes the resurfacing of access road and car park areas at company headquarters.
project involves the refurbishment of the accommodation facility d026 at borneo barracks, cabarlah qld including bca and fire compliance and functionality to meet defence accommodation standards.
sewer works including installation of additional sewer pumps, construction of a new water main in front of the base to replace the exisiting water main, repair damaged sewer lines, supply and installation of isolation valves and associated works at raaf base edinburgh.
project involves the end of life refurbishment including external and internal areas. includes roof works, civil works, ablutions, kitchenettes, security, hydraulic, heating and ventilation works.
project involves refurbishment and remediation works to various buildings including internal and external painting, repair or replacement of roofing, gutters, downpipes and fascia boards, replacement of existing carpets and vinyl floorings, refurbishment of ablution facilities and other minor building works.
various refurbishment works including supply and installation of storage, modifications to covered gym area, provision of awning to ground workshop and painting of buildings at holsworthy barracks. scope also includes replacement of timber decking at 311 high street penrith.