Latest and live tenders published in all country. Click on any tender to view further details.
works involve but are not limited to egress paths, remediation of handrails, doors, stairs and tactile indicators in eight buildings at gallipoli barracks
scope of works of this project involves the upgrade to the officers mess and accommodation including the installation of reverse cycle air conditioning and refurbishing the kitchen. the refurbishment of airman accommodation blocks including replacement of external timberwork, carpet, kitchenettes and repaint internally. upgrades to the swimming pool filtration plant including repointing to cracking of stucco finish, internal works including the rectification of rising damp as well as the replacement of the filtration equipment and safety shower.
project involves refurbishment and remediation works to various buildings including internal and external painting, repair or replacement of roofing, gutters, downpipes and fascia boards, replacement of existing carpets and vinyl floorings, refurbishment of ablution facilities and other minor building works.
project involves the following tasks: 1. task 0183-a033-1: demolish buildings a033 and a047 and rebuild 1 new building; 2. task 0183-d018-1: demolish building d018; 3. task q-10827t: demolish building h026 and rebuild a new 150m2 structure; 4. task 183-h038-1: kitchen wall tile replacement; 5. task 0183-h057-1: building h057 entry upgrade and roof sheeting replacement; 6. task 0183j007-1: demolish building j007; 7. task 0183j008-1: demolish building j008; and 8. task 0183j009-1: demolish building j009.
project involves the construction of a bunded area at the maygar barracks compound. the works include construction of a concrete hardstand complete with concrete barrier kerbs, new stormwater drainage infrastructure, installation of an oil separator to manage any fuel spills in the bunded area, installation of a canopy structure to minimise storm water inflow into the separator and lighting/power to the area.
focus of this project is remediating footpaths, car parks and line marking around raaf base point cook and raaf williams laverton. the scope also includes remediating the rainwater drainage on a building and the stormwater drain on the airfield at raaf base point cook.
project involves internal and external refurbishment works to the building at the port wakefield proof range, including floor replacement, replacement of end of life electrical switchboards, supply and install additional air conditioning units, re-roofing, salt damp repairs, patch and paint, and other minor building works.
project involves building refurbishment works to the puckapunyal military area including replacement of floor covering, paintings, roof and gutter works, minor structural repair and other building works.
internal refurbishments, external repairs and asbestos remediation works to the corrosion control facility hangar, amenities building, workshop, plant room and toilet block at raaf richmond.
project scope of works involves upgrading facility safety in various locations at hmas stirling. the upgrades include new hazardous storage containers, modifying existing eyewash stations to alarm remotely and physical security upgrades in a secure building. existing structures are to be demolished.