Latest and live tenders published in all country. Click on any tender to view further details.
scope of works of this project involves two tasks. the first task involves the internal refurbishment of the sanitary facilities in building g016 and the installation of a new demountable adjacent to building g016. the second task involves the installation of two eye wash facilities and the replacement of a staircase in q069.
project involves the following tasks: 1. task 0183-a033-1: demolish buildings a033 & a047 and rebuild 1 new building; 2. task 0183-d018-1: demolish building d018; 3. task q-10827t: demolish building h026 and rebuild a new 150m2 structure; 4. task 183-h038-1: kitchen wall tile replacement; 5. task 0183-h057-1: building h057 entry upgrade and roof sheeting replacement; 6. task 0183j007-1: demolish building j007; 7. task 0183j008-1: demolish building j008; and 8. task 0183j009-1: demolish building j009
scope of works will require the completion of investigations and fire compliance upgrade works at both garden island defence precinct gidp and the hmas kuttabul site to address p3 work items along with roof repair and painting works to various buildings.
supply of project involves the supply and installation of concrete barricade fencing, boom gates and signage to the lancelin training area.
project involves the construction of a bunded area at the maygar barracks compound. the works include construction of a concrete hardstand complete with concrete barrier kerbs, new stormwater drainage infrastructure, installation of an oil separator to manage any fuel spills in the bunded area, installation of a canopy structure to minimise storm water inflow into the separator and lighting/power to the area.
architectural refurbishment works including external and internal works and services upgrades including electrical, mechanical, fire and hydraulic works to buildings d059, d183 and gh004 at holsworthy barracks and moorebank.
scope of works of this project involves excavation and management of potentially contaminated waste materials, plumbing and drainage works, as well as environmental sampling and testing and updating of required documentation and records. 1. removal of underground storage tank ust048 at raaf base townsville 2. rerouting of building 246 greywater currently discharges to above tank in addition to removing ust, scope includes: • removal of all adjoining pipework; • reroute of greywater outlet from building 246 to a new sewer pit; and • reinstatement of surface site to existing.
focus of this project is remediating footpaths, car parks and line marking around raaf base point cook and raaf williams laverton. the scope also includes remediating the rainwater drainage on a building and the stormwater drain on the airfield at raaf base point cook.
roject involves internal and external refurbishment works to the building at the port wakefield proof range, including floor replacement, replacement of end of life electrical switchboards, supply and install additional air conditioning units, re-roofing, salt damp repairs, patch and paint, and other minor building works.
internal refurbishments, external repairs and asbestos remediation works to the corrosion control facility hangar, amenities building, workshop, plant room and toilet block at raaf richmond.