Latest and live tenders published in all country. Click on any tender to view further details.
horticultural services
railway-track construction materials
supply of australian communications and media authority is seeking responses to a request for expression of interest procurement for the establishment and management of a national self exclusion register for interactive wagering. details are described in the attached reoi document.
procurement is to replace the current in house incident management system used for search and rescue, maritime assistance, and ship sourced pollution response. due to the bespoke nature of the current system, amsa requires respondents to submit proposals to deliver the services over 2 phases, through separate contracts:, successfulrespondents if any will be engaged under contract 1 to perform the phase 1 services including developing a detailed design and potentially including the delivery of a proof of concept, of the respondent’s proposed solution., successfulrespondent if any will be engaged under contract 2 to perform the phase 2 services including delivering the respondent’s proposed solution
amsa is seeking a turn-key hardware and software solution for this project and intends to upgrade the aging and obsolete equipment and systems whilst not disrupting other aton functions or data streams at the sites.
amsa seeks a service provider to provide up to fifteen diesel hydraulic power packs to replace existing units. the power packs are to be portable and designed for operating hydraulic driven boom reels and blowers.
project will be managed by the armys project management unit, 19th chief engineer works 19 ce works who have the role of project manager or contract administrator for the duration of the project. 19 ce works and the successful contractor will work in conjunction with the client international policy division and user vpf/vmf. a summary of the scope of works is as follows: works package 1 - cook barracks port vila, efate: demolishing various existing buildings constructing the following new facilities 2 x double storey soldier living-in accommodation facilities magazine facility armoury officers mess soldiers mess and kitchen medical facility vehicle workshop vehicle shelter secure hardstand engineers workshop boat shed training facility chapel band house obstacle course 12 x married quarters relocating the base entrance including construction of a new guard house refurbishing 6 x existing married quarters refurbishing the fire station including construction of a new appliance bay generally refurbishing a number of other buildings undertaking below ground services upgrades including electrical and wastewater treatment undertaking a road network upgrade undertaking ict upgrades providing temporary facilities for vmf use during construction works package 2 - tiroas barracks luganville, espuiritu santo: constructing a new magazine facility constructing a new armoury constructing a new medical facility concept site plans for cook and tiroas barracks are attached as an information document. these may be revised during the atm process and cannot be relied upon. commencement of works package 1 is expected in mid-2020. it is intended that works package 2 is delivered concurrently, with mobilisation to luganville shortly after commencement at port vila.
provision for ongoing supply of pcas to meet the requirements in deploying 4 or more wurrung systems per year.
approach to market atm is for the establishment of a deed of standing offer for the provision of the following goods and services: a. design, fabricate, and deliver a transportable solar hybrid power system shps - suitable for deployment at remote sites across australia, without the need for an electrician to be present to complete the installation; b. design review of existing bom solar systems; and c. supply of spare parts for a. and legacy sites. the bureau of meteorology wishes to establish this deed of standing offer for three years, with options to extend for three additional periods of one year each at the sole discretion of the bom.
review, co-design and delivery of a pilot program for ses band 1 employees.