Latest and live tenders published in australia. Click on any tender to view further details.
supply of nrde equipment is used in a wide range of applications such as construction, mining, agriculture, marine and general industrial applications.
national capital authority nca is seeking to engage a suitably qualified and practical experienced service provider to conduct a nca wide security risk review, and report on pragmatic and practical risk-based mitigation options for improvements if required. this forms part of a periodic planned review which occurs approximately every five 5 years.
supply of geoscience australia is seeking expressions of interest from landowners to host new global navigation satellite system gnss ground station sites on their land. if your land is within the predetermined areas and meets the technical requirements, geoscience australia would like to discuss the opportunity to establish a new gnss ground station site on your property.
national capital authority nca is seeking to engage a suitably qualified and experienced contractor to undertake specialist inspection and reporting on specific bridge structure components the works entail provision of inspections services for bearings and movement joints and reporting.
supply of security and personal safety
supply of accc is seeking to establish a contract with a supplier for the provision of international crude oil and petroleum benchmark price data
service includes promoting the exhibition and signing on venues; contract negotiations with venues and lenders; stakeholder management; the management of freight transfers between venues; full exhibition installation and demount services; exhibition storage between venues if required and exhibition maintenance.
clean energy regulator cer is seeking submissions from suitably qualified and experienced organisations for the provision of greenhouse and energy audit services. the cer will establish a panel of suitably qualified and experienced organisations at the conclusion of this procurement process.
design, migration and support services for airservices australia’s odas database in a postgresql or postgis instance, moving the odas database to a geo-enabled rational database management system rdbms in a platform as a service paas solution.
works are identified and specified by reference to the ghd design documents in the request documents. the major elements of the fit out include: a architecture i. construction of data processing equipment rooms ii. construction of console rooms with flooded floor plenum iii. construct training rooms iv. construct a video conference room v. construct meeting rooms vi. construct open plan office workspace vii. construct testing workstations area viii. demolition works as shows on the drawings ix. construct partitioning to suit zone 2 and zone 3 security areas, including supply and installation of new hardware and access controls, including the addition of structural silicon to the internal face of existing glazing b electrical i. supply and installation of exposed services and cable trays ii. decommission, demolition, disposal off site of the redundant electrical and communications services as identified iii. the supply, installation, testing, commissioning, maintenance and warranty of the electrical and communications services as identified c mechanical i. decommission, demolition, disposal off site of the redundant mechanical services as identified ii. the supply, installation, testing, commissioning, maintenance and warranty of the mechanical services as identified d fire i. carry out hydraulic calculation to determine the maximum flow and pressure requirement of the sprinkler system within the project refurbishment area. ii. allow to upgrade fire sprinkler pumps and reconnect the existing pipes to the upgraded fire sprinkler pumps. the pump duty shall be based on the above hydraulic calculation. iii. reroute the existing supply main to the roof and reconnect to the existing sprinkler main. iv. replace the ex air-compressor with a new one for the pre-action sprinkler system. v. alter existing sprinkler system as shown on the drawings. vi. provide metal guard to ceiling space and underfloor space sprinklers in jssf racks, jssf & sps consoles and asts room. vii. new sprinklers and pipes in gas bottle storage room. viii. supply and install new monitored isolating valves to enable zone isolation. ix. supply and install drain valve to underfloor sprinkler pipes. the fit out works exclude: a provision and installation of new data processing equipment b provision and installation of the consoles, workstations and furniture items c communications cabling between the equipment rooms and the consoles and the testing workstations.