Latest and live tenders published in australia. Click on any tender to view further details.
supply, installation and maintenance of floor covering in australian parliament house aph including laying of underlay, broadroom carpet, narrow loom carpet, carpet tiles, vinyl and rubber in office spaces and large general circulation areas within aph.
new marketplace will gradually replace and expand the existing mobile, ibncs and tsp panels
maintenance works including fire protection system, uninterrupted power supply ups and internal refurbishment works at russell.
flood control works including stormwater detention basin, excavation and installation of a new low level outlet, raising of pits and installation of weir control, installation of subsoil drainage, replacement of swale, replacement of asbestos containing pits, conduit works and landscaping works at simpson barracks.
scope includes compliance and maintenance upgrades to make the range compliant with current standards and maintain capability. the works include repairing the target trench, reparing the stop-butt structure, bullet catcher remediation, construction of new ballistic side walls, reconfiguration of the firing mount/shelter to be compliant with defence standards, lane marker remediation, sign remediation, installation of new signange and civil works.
project focuses on the building refurbishment and maintenance works at the air traffic control tower and approach control. these works consist of end of life refurbishment of the existing air traffic control tower with new finishes, fixtures and equipment. the scope also includes minor modification of the building is required to meet statutory requirements associated with refurbishment.
project involves the refurbishment and remediation works including internal and external finishes, kitchenette refurbishments, ablution refurbishments and compliance work to kapooka company headquarters. scope of works also includes the resurfacing of access road and car park areas at company headquarters.
scope consists of upgrading the cctv and man-down coverage of two range areas. the works also include an extension of a facility, repair and replacement of the roof of another facility and replacement of notification system in another area.
scope of works of this project involves bushfire mitigation works and road or fire trail remediation works for the canungra field training area cfta and kokoda barracks. install fire trail signage and upgrade fire trails rebuild of the washed out stand 12 track install security fence and pedestrian gate at killarney glen upgrade existing killarney glen fire trail to a light 4wd access track
project involves civil works to the mantlet and bullet catcher of the firing range at dutson training area, including topsoil replacement, hydroseeding, provision of new fill and other remediation works.