Latest and live tenders published in australia. Click on any tender to view further details.
supply, installation and maintenance of floor covering in australian parliament house aph including laying of underlay, broadroom carpet, narrow loom carpet, carpet tiles, vinyl and rubber in office spaces and large general circulation areas within aph.
supply of new marketplace will gradually replace and expand the existing mobile, ibncs and tsp panels
maintenance works including fire protection system, uninterrupted power supply ups and internal refurbishment works at russell.
flood control works including stormwater detention basin, excavation and installation of a new low level outlet, raising of pits and installation of weir control, installation of subsoil drainage, replacement of swale, replacement of asbestos containing pits, conduit works and landscaping works at simpson barracks.
project focuses on the building refurbishment and maintenance works at the air traffic control tower and approach control. these works consist of end of life refurbishment of the existing air traffic control tower with new finishes, fixtures and equipment. the scope also includes minor modification of the building is required to meet statutory requirements associated with refurbishment.
project comprises of the refurbishment of four ablution blocks involving internal demolition of existing facilities, repair of concrete cancer, tiling or resurfacing of interiors, new fixtures or fittings, new hot water infrastructure and the segregation of showers.
scope consists of upgrading the cctv and man-down coverage of two range areas. the works also include an extension of a facility, repair and replacement of the roof of another facility and replacement of notification system in another area.
scope of works of this project involves bushfire mitigation works and road/fire trail remediation works for the canungra field training area cfta and kokoda barracks. - install fire trail signage and upgrade fire trails - rebuild of the washed out stand 12 track - install security fence and pedestrian gate at killarney glen - upgrade existing killarney glen fire trail to a light 4wd access track
project involves civil works to the mantlet and bullet catcher of the firing range at dutson training area, including topsoil replacement, hydroseeding, provision of new fill and other remediation works.
sewer works including installation of additional sewer pumps, construction of a new water main in front of the base to replace the exisiting water main, repair damaged sewer lines, supply and installation of isolation valves and associated works at raaf base edinburgh.