Latest and live tenders published in australia. Click on any tender to view further details.
anao’s purpose is to support accountability and transparency in the australian government sector through independent reporting to the parliament, and thereby contribute to improved public sector performance. the anao delivers its purpose under the auditor-general’s mandate in accordance with the auditor-general act 1997, the public governance, performance and accountability act 2013 and the public service act 1999.
australian war memorial is issuing this rft to identify the tenderer or tenderers best qualified for the provision of a collection management solution cms including collection management and digital asset management applications for the australian war memorial.
provision of a construction contractor to construct the extension to the poppy’s café carpark based on a fully designed “approved for tender” documentation set issued at tender. the project includes the construction of a carpark extension to the existing underground carpark park underneath poppy’s café and the eastern precinct. the new single storey underground carpark will provide additional 123 carparks parking for staff and memorial visitors to the east of the exiting carpark. the upper deck of the permanent carpark will provide a further 115 carparks temporary parking onsite for the redevelopment project.
airservices is seeking to engage an independent consultant to conduct a review of airservices air traffic controller attraction, recruitment, initial and cross training process to assess current performance, identify issues and, or causal factors and to make recommendations to improve performance. the review will consider airservices practices against industry benchmarked best practice.
airservices australia is seeking to enter into a contract with a suitably qualified and experienced organisation for the provision of maintenance services at the waste water treatment plant at the aviation rescue fire fighting services training school in melbourne. the key objectives of the rft process include: a soliciting responses and commercial pricing for the required services; b evaluating responses and pricing capacity and capability to determine if the respondents have met the requirements of the rft; and c nominating a preferred respondent to enter into contract negotiations for delivery of the services from 29 november 2019.
project requires replacement of the existing charging unit, which has now reached the end of its serviceable life. the works will endeavour to deliver a solution that provides the navy full charging capability when a submarine is in dock at garden island. the project will require a full direct current charging system that replaces the siemens system that is no longer serviceable.
project involves the modification of three 3 existing facilities within compound 804 at raaf base amberley to support base operations. each facility is an explosive ordnance eo facility that handles and stores ammunition and explosives. this project includes alterations and additions to the existing buildings and associated services. the scope of works of this project generally involves the following: replacement of internal lighting and power; replacement of existing manual roller doors with electric; replacement of electrical switchboards; construction of new external walls and footings; modification to existing communication and security services; provision of anti-static flooring; builders works including painting, concrete repair and new signage; provision of restricted electrical area dossiers; demolition of internal services and structures, and the removal from site of construction waste.
project involves end of life major refurbishment to heritage listed asset. includes external wall concrete cancer repair, fire and electrical compliance throughout building, police security school training building located at raaf base amberley, brisbane.
project comprises of the refurbishment of four ablution blocks involving internal demolition of existing facilities, repair of concrete cancer, tiling resurfacing of interiors, new fixtures fittings, new hot water infrastructure and the segregation of showers.
scope of works of this project involves bushfire mitigation works and road fire trail remediation works for the canungra field training area cfta and kokoda barracks., install fire trail signage and upgrade fire trails, rebuild of the washed out stand 12 track, install security fence and pedestrian gate at killarney glen upgrade existing killarney glen fire trail to a light 4wd access track