Latest and live tenders published in australia. Click on any tender to view further details.
provision of internal audit services, further details of the requirement are set out in schedule 1 statement of requirement.
supply and delivery of: unprinted plastic dual frequency proximity cards proximity cards; and blank plastic pvc cards pvc cards
provision of logistics and letter services under a panel arrangement. the services are separated into 3 categories: general warehousing and distribution of publications and forms; personalisation and mailing of letters; bulk distribution of digital communication.
provision of printing and production services under a panel arrangement. the services are separated into 16 different categories: print on demand; digital black and colour printing and finishing – small format up to a3; digital black and colour printing and finishing – large format above a3; sheet offset black and colour printing and finishing <1, 000 units; sheet offset black and colour printing and finishing >1, 000 units; heatset web / coldset web black and colour printing and finishing; form printing and finishing; envelope printing and finishing; file cover printing and finishing; security documents printing and finishing; corporate merchandise; specialised printing services; custom finishing services; duplication services; braille and specialist services; and customised plastic products.
scope of works will require the completion of investigations and fire compliance upgrade works at both garden island defence precinct gidp and the hmas kuttabul site to address p3 work items along with roof repair and painting works to various buildings.
project involves the decommissioning and removal of twenty-eight redundant underground storage tanks and associated remediation works across multiple locations of the nsw defence estate.
project involves internal and external refurbishment works to the building at the port wakefield proof range, including floor replacement, replacement of end of life electrical switchboards, supply and install additional air conditioning units, re-roofing, salt damp repairs, patch and paint, and other minor building works.
compliance upgrade works including stair balustrade upgrade, fire hose reel relocation, fire services and equipment upgrade, signage, fire door upgrades, emergency lighting and all other associated works at pymble mud.
scope includes demolition of existing pan cleaning facility and construction of a new integrated sanitary structure consisting of four single storey buildings and provision of new storage facility roof shed type structure at singleton military area.
project involves building and parade ground maintenance works at sunshine depot building, including drainage, heating and cooling system, carpet replacement, floor boards, patch and paint and other minor building works.