Latest and live tenders published in australia. Click on any tender to view further details.
process of developing an approach to market or request for tender for the salvage and disposal of up to 79 containers
provision of children and technology facilitated abuse in domestic violence research as detailed in the attach approach to market docuement
provision of modular containerised facility
project consists of building refurbishment to several offices and to bellman hangars along with fire compliance works. the scope also includes civil works to remediate drainage issues around several bellman hangars and the demolition of two small heritage buildings at raaf base point cook
upgrades to five buildings at fleet base east including architectural, structural, mechanical, electrical, hydraulic, fire protection and building code compliance works. scope consists of 24 packages which cover bathroom, toilet and shower upgrades, refurbishment of amenities in various areas, roofing repairs, window remediation, air conditioning maintenance, flooring works, handrail upgrades, painting, fire compliance upgrades, provision of external meal room and assocated connections and services
provision of print management services under a panel arrangement. panel members must have appropriate, relevant experience in the delivery of print management services. panel members must have the capacity to deliver the services, including: processes for delivery of the services, including end to end management of internal and external supply arrangements; systems, including information and communications technology, and capability to interface, integrate, or transfer data with systems of agencies and suppliers; quality assurance and continuous improvement processes; business continuity and risk management processes; and governance, official order management, relationship management and performance management processes.agencies have varying requirements for print management services to meet their individual business needs. these may include in-house or other external commercial arrangements for some of the services.
provision of regular maintenance, reactive maintenance and delivery of capital works projects for civil and structural elements
having previously explored outsourcing, the australian bureau of statistics abs has decided to conduct its paper data capture activities for the 2021 census in-house, within existing abs premises. the purpose of this rfi is to enable the abs to better understand the maturity of the market and ascertain capability and the experience of providers who may be suitable in providing a single paper data capture service as outlined in this rfi. alternatively, the abs would also like to understand further where a single provider is not practicably possible, pinpoint specific functionality outlined in this rfi where experienced providers are able to provide parts of a solution
atm for the establishment of a standing offer panel arrangement for the provision of expert consultancy work for the following nine service categories: services required for competition and consumer protection matters, services required for infrastructure regulation, engineering & technical services, services required for establishing allowed rates of return for regulated infrastructure, retail and wholesale energy market services, services related to behavioral economics/insights, data and analytical services, digital technology services, digital forensic services.
supply of provide a range of cardboard polling equipment items and related services in support of the aec’s delivery of electoral events. the cardboard polling equipment is required to support the facilitation of the voting process at polling places everywhere that australian citizens may vote. the equipment must be fit for purpose and built to agreed specifications. the related services may include but are not limited to design, manufacture, packing and storage of the equipment, the provision of other miscellaneous equipment, potential delivery services and additional associated or ad-hoc services. the aec will also require the development and implementation of a manufacturing plan and a risk management plan incorporating a business continuity plan.