Latest and live tenders published in australia. Click on any tender to view further details.
project involves the hazardous area electrical equipment remediation of works at raaf base townsville. the works are to be undertaken in 12 assets.
upgrades and provision of new security system and air conditioning. provide electronic access control systems to buildings at irwin barracks, including ict equipment, new door hardware, new fibre hard lines and respective airconditioning in communicatons room. provide upgrade to building fabric to intruder resistant requirements.
project involves the refurbishment of the accommodation facility d026 at borneo barracks, cabarlah qld including bca and fire compliance and functionality to meet defence accommodation standards.
project involves civil remediation works to the causeway and perimeter fence repair, including damaged posts, damaged wires, new signs, new road base, new rock armour layer and other associated works.
project involves internal refurbishment works to an existing building at raaf base edinburgh, including patch, paint and replace to specified floor, wall, ceiling and joinery finishes.
project involves the end of life refurbishment including external and internal areas. includes roof works, civil works, ablutions, kitchenettes, security, hydraulic, heating and ventilation works.
various refurbishment works including supply and installation of storage, modifications to covered gym area, provision of awning to ground workshop and painting of buildings at holsworthy barracks. scope also includes replacement of timber decking at 311 high street penrith.
various refurbishment works including supply and installation of storage, modifications to covered gym area, provision of awning to ground workshop and painting of buildings at holsworthy barracks. scope also includes replacement of timber decking at 311 high street penrith.
construction of a new military training obstacle course comprising of eleven obstacles, new course lighting, water supply and drainage to allow one wet obstacle. includes demolition of the existing obstacles and upgrade of oval lighting.b
project involves upgrades to the access road within the training base to allow for safer access as well as improvements to cater for the new hx77 tactical truck, which are proposed to be used at the site.