Latest and live tenders published in ireland. Click on any tender to view further details.
construction of 13 residential units with a ber rating of a2 and associated site works at athgarvan road, liffey terrace, liffey view, newbridge, co. kildare.
framework agreement for energy efficiency retrofitting works to laois county councils dwellings. installation of all or some of the following energy improvement works: cavity fill insulation, associated ventilation and lagging to pipes and water storage tanks in the attic. contractors should take note that most, if not all of the properties involved, will be occupied at the time the works will be carried out
river dargle flood defense scheme construction management service provider
framework agreement for energy efficiency retrofitting works to kerry county council dwellings. installation of all or some of the following energy improvement works: cavity fill insulation; attic insulation;associated ventilation and lagging to pipes and water storage tanks in the attic. contarctors should take note that most, if not all properties involved, will be occupied at the tim ethe works will be carried out
present a requirement exists for master fisherman services see section 4 – service specification. applicants deemed qualified will be placed on a panel that the marine institute will draw from over the next two years to provide such services
flow cytometric analysis is a vital tool for any laboratory working in the area of in vitro cell culture and microbiology. this flow cytometer will be used to characterise the properties and functions of numerous cell types. this will include the characterisation of primary cells derived from mesocolic mesentery and the characterisation of bacterial strains isolated from cystic fibrosis patients. through this work, the analyser will permit the generation and validation of diagnostic, predictive and prognostic biomarkers across all clinical specialities.
framework agreement for energy efficiency retrofitting works to dublin city council dwellings. installation of all or some of the following energy improvement works: cacity fill installation; attic insulation; associated ventilation and lagging to pipes and water storage tanks in the attic. contractors should take note that most, if not all of the properties involved, will be occupied at the time the works will be carried out.
research and development services and related consultancy services
supply of exhibition equipment
supply of exhibition equipment