Latest and live tenders published in all country. Click on any tender to view further details.
contract for valve stop
supply of richter spares
supply of hull paints for mr2 vessel silver
supply of battery; sealed agm 12v; 200ah; suitable for diesel geneator water distilled water for battery1 jar 20l. battery acid 5 gallon jar
supply of cylindrical roller bearing nu 2038e, make:skf/fag for ph2 desal brp motors bearing; ball; designation 16038-c3; make: skf / fag only
supply of kit, spare parts, 65 series, part no: 20014-01, eri pressure exchanger, model no: px-180, part no: 40009-01
supply of reinforced rubber hose, colour-yellow, size-1x50 mtrs.
supply of motor details: induction motor; squirrel-cage 3-m type 160 l l4.330; cpn 42930610; 15kw; 20hp; 400v; 5 0hz; 28a; 1460 rpm; 0.87pf; ip56; class f; s2, bearing de/nde: per actual motor bearings, tefc. ce certified and marked; top mount er terminal box; with lifting eyelet; with pulley per actual at site; make: ircr manufacturing unicov location: hatta pumping stati on phase 2 service line item no. 1: existing old motor full overhauling; de/ nde bearing replacements, rotor shaft balancing and co rrections, stator winding test, all electrical test, power terminal insulator-terminal lead wire/ bolts & nuts replacement, bearing sensor, thermistor sensor; thermistor terminal replacement, overhauling of motor, site removal from motor platform base, pick-up/ d eliver back to site of motor, site
rectification of piping, cladding and ahus defects @ gren 400 kv location : gren 400 kv scope of works: -#defective gate valves, 3 way motorized valves in the air handling units, drvs in the chiller side, defective siphons, pressure gauges, air vents to be repl aced in the chilled water circuit. -#leak testing to be done after the accessories replacement. -#defects cladding to be replaced. - #valves and accessories shall be of same make and origin. ahu no. 2 & 2a 2 nos. ahu no. 3 & 3a 2 nos. supply & installation of g ate valve 1 no. each ahu, 3-way motorized valve 1 no. each ahu, drv 1 no. each ahu, 2-way motorized valve 1 no., strainer 1 no., siphons 1 no., pressure gauges 2 nos., air vents 1 no., rubber insulation, foster, piping cladding & flexible rubber f lange. carry out leak test. replacement of ahu duct cladding ahu no. 1 & 1a 2 nos. 1. supply & installation of gate valve 1 no. each ahu, 3-way motorized valve 1 no. each ahu, drv no. each ahu, 2-way motorized valve 1 no., strainer 1 no., siphons 1 no ., pressure gauges 2 nos., air vents 1 no., rubber insulation, foster, piping cladding & flexible rubber flange. 2. carry out l eak test. 3. replacement of ahu duct cladding damaged top side area only. note: gate valve, drv brand is motorized brands and mak e shall be as per site condition. notes:- a#party to visit the site, to assess the entire work to be carried out and then quote f or lump sum accordingly. contact details for arranging the site visit are: mr. rashid kallery mob: 052-5507585/04-3221477 or mr. s uresh 050-4611816/04-3221471 b contractor to submit method statement to dewa-tcm and to obtain approval prior to start the work. c all loading, unloading and shifting of compressors and other materials are under scope of the contractor. d upon issue of po, entry permit approval ptw in prescribed format shall be obtained by contractor prior to start the work in the substation. e con tractor shall provide minimum 2 year warranty for the newly supplied materials and workmanship from the date of acceptance of the co mpleted work. f the delivery note for newly supplied materials, testing report, warranty certificate, work completion report along with po copy shall be submitted to dewa-tam after successful completion of the work. contact person for documents submission: mr. a zeem ph: 04-3221689/ 055-7728480. mr. nizar mohammed koya ph: 04-3221476/mob: 055-9726046 or g the place of work shall be ke pt clean at all times before, during and after the work. spillage and splashes shall be avoided; and if spilled, then it shall be cl eaned immediately. h contractor#s staff shall wear necessary ppes like uniform, safety shoes and helmet while on work and should abide by the dewa safety procedure, rules & regulations for the safe completion of job. -------------------------end---------------- -----------------
contract for krohne, opticheck calibration opticheck details: make: krohne, p/a: 014052728, sn:005447439, ac: 4003269601.