Latest and live tenders published in all country. Click on any tender to view further details.
replacement of defective dorma sliding doors at umm ramool chc, central storeal warsan. supply and fixing of electro mechanical lo cks for the existing sliding doors at tcc dcc buildings, warsan complex. for any query/site visit, please contact mr. reddy on 05 5-8234159 between 07:30hours to 14:30hours from sunday to thursday replacement of defective dorma sliding doors at hatta chc, ramoo l chc and central store, al warsan supply and installation of electro mechanical lock for the existing sliding doors at tcc&dcc buildings, warsan,
checking, calibration and certification on manually operated chain hoist - 3 ton checking, calibration and certification on gi sling with soft eye both side 1m x 13mm checking, calibration and certification on screw pin d shackle; 1/2 ; 2 ton checking, calibration and certification on screw pin d shackle; 3/4 ; 4.5 ton checking, calibration and certification on screw pin d shackle; 1 ; 8.5 ton
rewinding & overhauling of compressor 2 nos. 1. edg/bsdg leh, accu 2, compressor 4 2. swph, accu 2, compressor 3 compressor mod el: d8dj1-600x-bwm/d, 3 phase, 380v ac, 50 hz, 475 lra. unit model: skm, acux-5125 ym scope of work: 1.#contractor has to visit site for proper understanding the scope of work before submit quotation. 2.#contractor has to collect and deliver the compressor from ja ps l1 station, dewa, jabelali, dubai. 3.#removing and fixing of compressor from the unit. 4.#rewinding & overhauling of copeland dwm compressor. model: d8dj1-600x-bwm/d, voltage 380-420v, 3 ph, 475/544 lra. 5.#work includes rewinding of stator and complete overhau ling/servicing/ replacement of defective parts of the compressor. 6.#genuine parts shall be use for the overhauling. 7.#replace the
foam analysis/testing of aqueous film-forming foam afff and fluoroprotein foam concentrates as per applicable standard and other r equirements. quantity of eight samples to be tested by service provider with the following parameter and test method. parameter - t est method 1 appearance- visual 2 specific gravity @ 20 deg c - astm d 4052 3 ph @20 deg c- ph meter 4 sediments- astm d 2709 5 ki nematic viscosity- astm d 445 6 surface tension- astm d 971 7 25% drainage temp. 3% blend- volumetric 8 expansion ratio3% blen d- volumetric 9 fire extinguishment performance small scale test- msc circular 1312 result/report of the test should be submitt ed for reference purposes. sample to be collected by the service provider as per their procedure. after testing, residue of the sa
supply of preliminaries# # the contractor, lighting circuit layout and emergency evacuation plan with proper exit signs lights layout
supply of hose hydraulic hose id- 3/4, working pressure- 275 bar, temp.200 deg.c, hose material outside ss wire braided, inside synthetic rub ber, length - 780mm, both side ss 304 male fitting with end washer for whb rexroth hyd. system hose hydraulic hose id 1/2, work.press.:275 bar, temp.:200 deg. cel., outside ss wire braided, inside synthetic rubber, length:950mm, one end male 1/2npt, other end male 1/2bsp ss 304 with end washer for whb rexroth hydraulic system.; temp. 200 deg. cent. outsi de ss wire braded inside teflon length 950 mm, one end male 1/2npt, other end male 1/2bsp ss304 with end washer.;mmd-e hose hydraulic hose id 1/2, working pressure 275 bar temperature:200degree celcius, hose material synthetic rubber, length:850mm, w ith both side ss304 female fitting end washers.
supply of digital multimeter part number: fluke-101 manufacturer: fluke name: ethernet tester part number: tc-nt3 manufacturer: trendnet name: visual fault locator laser part number: fls-140 manufacturer: exfo name: optical attenuator -5 dbm 10pcs/pack part number: at-lcu-10p5 manufacturer: flypro name: optical attenuator -10 dbm 10pcs/pack part number: at-lcu-10p10 manufacturer: flypro
complete overhauling & testing of compressor of mushrif reservoir. make#fini# type#e.c. pulsar concept se 119-500-# code#683tm5a7220 1# sl. no#1060291491# capacity#695 l/min# volum flow#24.56 cfm# pressure#10 bar# power#5.5 kw / 7.375 hp# voltage#400# phase#3# freq uency#50 hz# current#12.7 amps# please contact mr. raj 04-3229440 for further clarifications. scope of work for fini air compres sor overhauling & testing the contractor shall perform the work as per details specified herein. required work detail is in fini ai r compressor overhauling & testing. the below list of technical requirements are to be completed. ##contractor to check the compress or and fully aware the scope of works to be carried out ##compressor unit to be collected from dewa premises and vice
supply of cal.of portable hydrogen meter s.n.7882
supply of hypo chlorination building inside area pipes coating warranty: 02 years