Latest and live tenders published in all country. Click on any tender to view further details.
scope of work for structure hand rails replacement work at e- station in jebel ali power station fabrication & replacement of exis ting structure hand rails due to external corrosion in waste heat boilers and auxiliary boilers, ph-i in e station. this is one to one replacement of existing hand rails with gi coated pipes including material, fabrication, surface preparation & painting and ins tallation. hand rail details are as follows# plain round hollow pipe with galvanized surface hand rail pipe size od:1.1/4inch or od :42.6mm, schedule 40 height of hand rail top from plateform:1200mm. center to center distance between 02 hand rail posts:1200mm. han d rails bolted with m16 gi bolts or welded with structures. distance between top & bottom hand rails:470mm. toe guard details
servicing/inspection of fire pump set at diwl 132kv substation sap order number :520607735 scope of work: diesel engine: 1. test run the diesel engine and check engine speed. 2. test fire pump performance and record the results. 3. service of diesel engine fuel injectors. 4. service and re-calibration of diesel engine fuel pump. 5. replace of fuel filters. 6. service of heat exchanger and d o pressure test. 7. flush engine water jacket for cleaning of close cooling loop. 8. replace of water coolant fluid. 9. drain engine lube oil and replace engine oil. 10. replace diesel engine lube oil filter. 11. replace engine upper head gasket if required. 12. replace engine air filter cleaner. 13. test run the diesel engine and re-adjust the engine speed. warranty: one year scope of work : fire pumps electric and diesel: 1. replace
calibrate equipment as per international standard and provide calibration certificate calibrate equipment as per international standard and provide calibration certificate calibrate equipment as per international standard and provide calibration certificate calibrate equipment as per international standard and provide calibration certificate calibrate equipment as per international standard and provide calibration certificate calibrate equipment as per international standard and provide calibration certificate calibrate equipment as per international standard and provide calibration certificate calibrate equipment as per international
calibration & certification of gas detector, type: mqg0100 make: drager model: x-am 5600. the party should be iso 9001:2000 certifie d. next due date of calibration should be mentioned both in the calibration certificate as well as on the label of the instruments. all measurements should be traceable back to international standards.
supply of h2 pulse air compressor-h3 n2 air compressor fan motor repairing scope of work: ·#replacement of the motor bearing de and n.d.e with another same type and number skf or fag manufacture. ·#re-sleeve on de bearing housing ·#repair any other defect, if any and confirm the motors are running without any problem ·#service and test report must provide after repairing along with one-year warran ty. ·#total qty are three motors each motor description is: three phase ac motor, 230/400v;d/y;50 hz ;0.48kw; 1390/min;field no:e1113 99 za- 155;mk106-4dk.14.u;80 c;ip:54;thcl:f;make:siemens
supply, install, test and commissioning of led parking lights @ dewa head office building 1.#scope of work the c ontractor shall design supply, install, test and commission 185 nos led light as per following detail specification. v#the parties s hould visit the sites and check the requirement and to quote accordingly. v#the contractor shall supply, install, test and commissio n a waterproof, dust proof and corrosion proof with high quality and durable smart led light fittings as below mentioned light descr iptions. the design concept shall consider the followings but not limited to. §#high-impact and corrosion-resistant §#light grey, i njection moulded §#polycarbonate body §#frosted prismatic polycarbonate cover §#body and cover fire-retardant §#smooth
make: sorensen brand: sgx 100/300 d 1d sbr isolated analog control included technical specification: dc power supply 100v/300a
refilling of empty mixture gas calibration cylinders, used in calibration of continuous emission monitoring system cems. product details cylinder size/volume#: 10l al valve outlet###: cga 330 pressure/wt####: 150 bar content#####: 1.59 m3 analysis details gas component#####required composition# sulphur dioxide#####152.00ppm# nitric oxide#####232.00ppm# carbon dioxide#####16.18%# carbon mon oxide#####163.00ppm# nitrogen######balance#
jamf com-rp jamf pro ios - 2500-4999for details you may contact: shereen abdelrazaq mustafa al-ali shereen.alali@dewa.gov.ae> jamf com-rp jamf pro macos - 2500-4999 jamf com-rp jamf pro tvos - 2500-4999 mdscare hardware macos - ent -501-1000 mdscare for enterprise ios/ipados -ent 1000+ mds one day technical expert onsite support macos - ent jamf 200 course
supply of armed guards for osmc fleet at hra