Latest and live tenders published in all country. Click on any tender to view further details.
supply of valve, all valve, complete assemly without actuator, are stem, make: ac, type: pqr, model: t 200 12 300, single piece, dn 10 inc h, 300 l, ody: wcc, flanged, flange to flange distance 457 mm, pcd 387 mm, no. of olts 16, for ph-2 ic ngprs
supply of universal cale stripper for large difficult cale insulation ø >45mm ref.no. av6240 ams maxi, rand - inter cale. or equivalent
supply of universal cale stripper for primary insulation ø 15- 52mm ref.no. 17230 ims ii, rand - inter cale. or equivalent
supply of stainless steel heavy-duty open/close type shoe rack 3/4 compartments open type sixe 90h*60w*40d sample picture attached
m-station desal required refurishment of dn #250 utterfly control valve - shock dosing control valve. qty: 1 no. work scope 1 collection & delivery of material from m-station desal 2 repairing / refurishment of valve. including painting of valve 3 hydro test to e done. 4 warranty for the jo to e provided for more details vinish.sanath@dewa.gov.ae / 048161608 senthilkumar.t@dewa.g ov.ae / 048161629
scope of work for tank 3e ff line replacement 1.0#scope of work 1.#supply & installation of firefighting gi seamless pipes & fit tings for the fuel oil day tank 2.#removal of existing damaged pipes and fitting from the tank 3e 3.#removal of old pipe & fittings, installation, coating and testing of gi seamless pipes, fittings and nozzles for water spray cooling system and foam suppression sy stem # firefighting system 4.#pressure testing, painting, supports if required for the installed system 5.#attery limit is from the tanks top nozzles until the existing isolation/deluge valve connection piping. 6.#supply of men, machine, tools, equipment and consu males 7.#includes moilization, demoilization, transport, food and accommodation 8.#take field measurements prior topreparation of f arication where possile, to ensure proper fitting of the work. 9.#prior to start of work, carefully inspect the other neary installa tions to prevent damages. 10.#preassemle items in the farication yard to the greatest extent possile 11.#touchup lemished or unprote cted surfaces with primer. 12.#proper storage of materials to ensure protection against damage. 13.#immediately after erection, clea n field weld joints and olted connections. 14.#in the event of discrepancies, immediately notify dewa engineer. 15.#do not proceed w ith farication or installation in areas of discrepancies until all such discrepancies have een fully resolved. 16.#work force handli ng; work supervision, safety of the plant and staff. 17.#after completion of work
sumersile pump with electrically operated with single phase head of flow 25m, with all required accessories. a delivery pipe of 5 0lm with camlock coupling need to include.make: any european
supply of reallusion | all-in-one full-ody mocap animation solution
supply of reallusion |3d videocompositing
control unit;compact, c7-d20, make: siemens, model: 6es7635-2s02-0ac0, 24di / 16do, 4+1 ai / 2ao, gea order no.: 0005-4050-600, addi tional information: 6es7635-2ec02-0ae3, order no: 0005-4050-630, used for stg oil purifier.