Latest and live tenders published in all country. Click on any tender to view further details.
repairing of 24v dc converter module for stg-30 converter modules details: edn group make, code: ahf185-02, vin: 190-320vdc, 230va c 16a, 1ph 50-60 hz, v out: 24-36vdc/120a, 3000w, ip20 s/n:lu1145234161. note: * faulty converter module shall e collected from de wa jeel ali power m-station, m & e workshop emd office and delivered ack to the same. * workshop test reports shall e sumitted al ong with delivery of repaired modules. * warranty of 1 year shall e provided for the repaired module. for any clarification, pleas e contact mr. sumankanth, asst. engr. emd-m 0529081236
sap order no: 520417931 diesel engine fire pump controller # replacement at dx 132kv sustation make: tornatech model: gpd series - v isitouch version 2 enclosure type: nema 4 type: wall mounted input/output: 240 volts / 24 volts - dual attery charger add-ons: over speed alarm / low oil pressure / failure to start ac failure / low water / extra common alarm scope of work: removal of damaged con troller panel contacts installation of new controller panel set re-wiring of controller connection to the diesel engine re-wiring of controller connection to the diesel engine connection of ms provision five contacts. connection of ms provision five contacts. connection of sensing line pipes. configuration, test, and commissioning of controller panel warranty: one year forsite visit and ptw, contact mr. hari 04-3229325, 055-9425174
rectification of diesel engine controller at cmps 132kv sustation make: tornatech sap order no: 520413592 scope of work: visit site and check the controller replace of i/o oard upgrade 2viz004 to 2viz016. replace of vizitouch display upgrade 2viz004 to 2viz016 . replace of circuit reaker upgrade 2viz004 to 2viz016. normalize the controller warranty : one year for site visit and ptw, con tact mr. rajagopalan 04-3221182, 050-8789396
modification & rearrangement of existing racks including provision of additional shelves 48 nos. heavy duty cross eams 2400mm gi pan els size: 300x900mm. final measurements to e taken y the supplier at site in warsan admin uilding. scope: dismantling, re-arrangem ents of existing racks and provision of additional shelves in each rack.
supply of valve, all valve, complete assemly without actuator, are stem, make: ac, type: pqr, model: t 200 12 300, single piece, dn 10 inc h, 300 l, ody: wcc, flanged, flange to flange distance 457 mm, pcd 387 mm, no. of olts 16, for ph-2 ic ngprs
supply of universal cale stripper for large difficult cale insulation ø >45mm ref.no. av6240 ams maxi, rand - inter cale. or equivalent
supply of universal cale stripper for primary insulation ø 15- 52mm ref.no. 17230 ims ii, rand - inter cale. or equivalent
supply of stainless steel heavy-duty open/close type shoe rack 3/4 compartments open type sixe 90h*60w*40d sample picture attached
m-station desal required refurishment of dn #250 utterfly control valve - shock dosing control valve. qty: 1 no. work scope 1 collection & delivery of material from m-station desal 2 repairing / refurishment of valve. including painting of valve 3 hydro test to e done. 4 warranty for the jo to e provided for more details vinish.sanath@dewa.gov.ae / 048161608 senthilkumar.t@dewa.g ov.ae / 048161629
scope of work for tank 3e ff line replacement 1.0#scope of work 1.#supply & installation of firefighting gi seamless pipes & fit tings for the fuel oil day tank 2.#removal of existing damaged pipes and fitting from the tank 3e 3.#removal of old pipe & fittings, installation, coating and testing of gi seamless pipes, fittings and nozzles for water spray cooling system and foam suppression sy stem # firefighting system 4.#pressure testing, painting, supports if required for the installed system 5.#attery limit is from the tanks top nozzles until the existing isolation/deluge valve connection piping. 6.#supply of men, machine, tools, equipment and consu males 7.#includes moilization, demoilization, transport, food and accommodation 8.#take field measurements prior topreparation of f arication where possile, to ensure proper fitting of the work. 9.#prior to start of work, carefully inspect the other neary installa tions to prevent damages. 10.#preassemle items in the farication yard to the greatest extent possile 11.#touchup lemished or unprote cted surfaces with primer. 12.#proper storage of materials to ensure protection against damage. 13.#immediately after erection, clea n field weld joints and olted connections. 14.#in the event of discrepancies, immediately notify dewa engineer. 15.#do not proceed w ith farication or installation in areas of discrepancies until all such discrepancies have een fully resolved. 16.#work force handli ng; work supervision, safety of the plant and staff. 17.#after completion of work