Latest and live tenders published in all country. Click on any tender to view further details.
supply of temp, t/c, weston p/n 01128tc022w, spec rev:w, ref s/n ca124556, ge p/n 362a1102p017 / 362a1102p022, exhaust t/c, k type with studs, used in gtg., temp, trans, laarge inc, 7-21187-24, cale, exhaust thermo couple gtg. ge p/n 361a2327p024. mli 0623
supply of additional cost added to po 3051801265 for oil purifier overhauling in unit 74 in l stn phase 1 overhauling of oil purifier for ps t overhauling will includes: removal of owl, replacement of spares and checking of all electrical, mechanical and i&c plc system overhauling must e carry out y the oem agent kindly please get the quotation from safe technical supply co. llc as the jo is carr ying y them currently
supply of level switch conductivity, make: kleev, type: multi proes socket, model:ksh-23, process connection: 1 1/2 sp, proe socket materia l : 1.4571, housing: aluminum cast, insulation of socket: pfa, medium temperature: max. +200oc, pressure max.: max.1.6 mpa, electri c al connection : m20x1.5 cale gland, used for seawage system., pe coated proe for level switch conductivity make: kleev, model:ksh-23 length:2 m, used for seawage system, pe coated proe for level switch conductivity make: kleev, model:ksh-23 length:1.5 m, used for seawage system, controller panel mounted for level switch conductivity, make: kleev, type: kcls-ea-5, power supplyun:24..240v ac/dc, power consump tion: max. 2 va /w, proe voltage; 3.5 v ac, proe current: max. 0.2 ma, sensitivity adjustale: 5 kohm #.100 kohm, output: 1x spdt 250v 8a, ac1 24vdc min. 500 mw, electrical connection: terminal lock, max. 2.5 mm2 with insulation 1.5 mm2, electrical protection : c lass ii, mechanical connection: din en 60715 rail used for seawage system, flange for level switch, make: kleev. size: 8 inch 150 used for seawage
jo service pr for supply of non-standard end 300 mm dia 90 degree in gre according to the site requirement. contact mr. piramuthu ka thiravan tel: 04-32-2044, jo service pr for supply of non-standard flanged spigot adopter in 450 mm dia in gre according to the site requirement., jo service pr for supply of non-standard 1200 mm x 150mm /f gre tee with one side dsp and other side sp according to the site requir ement.
supply of com gas, monitor, general monitors, gas detector long cale p/n: 11159-2l with sintlered stainless steel dust guard p/n: 10266-1080, com gas, monitor, general monitors, gas detector short cale p/n: 11159-2 with sintlered stainless steel dust guard p/n: 10266-1080
supply of f.f. kidde, det. heat proe type, make:kidde, model:12e-27121-000-04, detection temperature:87.7 deg c, operating voltage:17-28vdc, expl osion proof, used in fire fighting system, f.f.kidde, xp 95 mini switch monitor unit, type: xp 95 addressale, make:apollo, part no. 55000-833, surface mount, used in fire fightin g system,
supply of pump; lending sea water pump, capacity 80 cu. meter 1/hr. and 30 meter of discharge head, model: r80-315 sl no: d078 make: rouschi i taly including motor assemly for d station ph.2 lending plant.
overhauling, pressure testing and commissioning of eu type horizontal heat exchangers 52a & 52 in k station dewa, japs 1.#remove all the insulation and cladding sheet from vessel surface gas side ody, water side ody and convex ottoms up to the nozzle flanges. 2.#unolt the gas side and water side flanges, gas inlet and gas outlet flanges without damaging any of the neary equipment / pipeli ne. 3.#remove the gas side ody from the original position y unolting the supports. 4.#clean and remove any particle sedimentation in side the gas side ody, clean the gasket surface area. 5.#dewa engineer will inspect the gas side ody and gasket surface for any defe cts. 6.#any defects found in the gas side ody / gasket surface shall e rectified y the contractor. 7.#remove the gasket andclean th e water side ody surface. 8.#clean the tue internals y hydra jetting at specified water pressure. 9.#after hydra jetting, put the ne w gasket and test ring. 10.#lind the water side ody with lind flanges and provide pressure gauge. 11.#pressurize and hold the vessel at specified pressure and inspect the tue sheet. 12.#any leak / damage found shall e rectified y the contractor as instructed y dew a engineer. 13.#drain the waterside ody, install new gaskets contractor scope and ox up the unit with all connections. 14.#clean t he pressure vessel surface and paint the entire surface including supports. 15.#after the completion of painting, new insulation and cladding sheet shall e provided y the contractor. 16.#sumit the overhaul andhydro test report along with photos. work period 4 d ays for two units contractor scope ·#tools, tackles and equipment to carry out the jo. ·#welding consumales. ·#water side and gas side tue sheet gaskets including for hydro test. ·#test ring for hydro testing ·#lind flanges, pressure gauge and gaskets to carry o ut hydro test. dewa scope ·#scaffolding ·#power ·#water ·#paint ·#insulation and cladding sheet additional requirements from contrac tor 1.#all the lifting activities shall e manual. crane / forklifts are not allowed to enter the premises. 2.#all the lifting and ri gging tools shall e inspected and certified y third party. 3.#all the lifting / rigging tools along with third party inspection cert ificates shall e produced to dewa one-dayadvance in order to verify the items. 4.#dewa will not e responsile for any loss, in case of any incident / damage due to failure of rigging / lifting tools. any such condition / damage shall e repaired / rectified y the c ontractor in their own cost. warranty ·#the warranty period for the work shall e one year from the date of completion of work cert ified y dewa. ·#in case of any damage/defect of the work carried out under this contract within this warranty period, the contractor shall attend and carry out the necessary repair work and rectify the defect within short period without affecting the production of electricity and water. general terms & conditions ·#the contractor shall visit the site and make himself fully familiar with the work scope, plant access, facilitiescomplexities, safety measures etc., efore he sumits his id. ·#contactor shall sumit method of statement and schedule upon receipt of po. ·#the contractor shall ensure housekeeping on a daily asis and the contractor shall e res ponsile for all waste material disposals to designated places. ·#all dewa safety & environment policy, rules and regulation shall e followed at work site during the execution of the work. the contractor#s engineer should e familiar with safety regulations while wo rking in a hazardous area. ·#scaffolding if required shall e arranged y dewa. ·#crane if required shall e arranged y dewa. ·#all rig ging and transporting equipment should e arranged y the contractor. this equipment should e duly tested and certified y the 3rd party inspection agency and the certificates should e produced on demand. qualified rigger, mechanics should e provided. ·#the work shal l e executed under dewa supervision and as per quality/schedule requirement. ·#contractor#s supervisor shall e availale at site thro ughout the period of work. ·#entry permits for the staff/workers should e applied with passport copies having valid visa. persons, w hose names are not availale in the list, will not e allowed to enter the powerhouse. ·#entry permits for the vehicle should e applie d with copies of vehicle registration. ·#dewa will arrange necessary ptw / lc / hwp from operation, chemical la / fire department cl earances to carry out the scope of work under this contract. ·#the contractor upon receiving the work permit shall firstensure a sa fe working condition. ·#all the persons should wear all the required ppe while at work. ·#all material and tools rought in shall e d eclared at power station security gate and the list of these items shall e signed y dewa security. the copies of these documents sha ll e lodged with dewa engineer in-charge on daily asis. this document will e the asis for the clearance gate pass to take them out on completion of the jo. ·#service air, electricity and water for work at dewa site. it is the responsiility of the contractor to have his own arrangement in extending the electricity and water utility to his places of work including lighting, overhauling, pressure testing and commissioning of eu type horizontal heat exchangers 53a & 53 in k station dewa, japs1.#remove all the insulation and cladding sheet from vessel surface gas side ody, water side ody and convex ottoms up to the nozzle flanges. 2.#unolt the gas side and water side flanges, gas inlet and gas outlet flanges without damaging any of the neary equipment / pipeli ne. 3.#remove the gas side ody from the original position y unolting the supports. 4.#clean and remove any particle sedimentation in side the gas side ody, clean the gasket surface area. 5.#dewa engineer will inspect the gas side ody and gasket surface for any defe cts. 6.#any defects found in the gas side ody / gasket surface shall e rectified y the contractor. 7.#remove the gasket and clean th e water side ody surface. 8.#clean the tue internals y hydra jetting at specifiedwater pressure. 9.#after hydra jetting, put the ne w gasket and test ring. 10.#lind the water side ody with lind flanges and provide pressure gauge. 11.#pressurize and hold the vessel at specified pressure and inspect the tue sheet. 12.#any leak / damage found shall e rectified y the contractor as instructed y dew a engineer. 13.#drain the waterside ody, install new gaskets contractor scope and ox up the unit with all connections. 14.#clean t he pressure vessel surface and paint the entire surface including supports. 15.#after the completion of painting, new insulation and cladding sheet shall e provided y the contractor. 16.#sumit the overhaul and hydro test report along with photos. work period 4 d ays for two units contractor scope#tools, tackles and equipment to carry out the jo. ·#welding consumales. ·#water side and gas s ide tue sheet gaskets including for hydro test. ·#test ring for hydro testing ·#lind flanges, pressure gauge and gaskets to carry ou t hydro test. dewa scope ·#scaffolding ·#power ·#water ·#paint ·#insulation and cladding sheet additional requirements from contract or 1.#all the lifting activities shall e manual. crane / forklifts are not allowed to enter the premises. 2.#all the lifting and rig ging tools shall e inspected and certified y third party. 3.#all the lifting / rigging tools along with third party inspection certi ficates shall e produced to dewa one-day advance in order to verify the items. 4.#dewa will not e responsile for any loss, in case of any incident / damage due to failure of rigging / lifting tools. any such condition / damage shall e repaired / rectified y the co ntractor in their own cost. warranty ·#the warranty period for the work shall e one year from the date of completion of work certi fied y dewa. ·#in case of any damage/defect of the work carried out under this contract within this warranty period, the contractor shall attend and carry out the necessary repair work and rectify the defect within short period without affecting the production of electricity and water. general terms & conditions ·#the contractor shall visit the site and make himself fully familiar with the w ork scope, plant access, facilities, complexities, safety measures etc., efore he sumits his id. ·#contactor shall sumit method of statement and schedule upon receipt of po. ·#the contractor shall ensure housekeeping on a daily asis and the contractor shall e resp onsile for all waste material disposals to designated places. ·#all dewa safety & environment policy, rules and regulation shall e f ollowed at work site during the execution of the work. the contractor#s engineer should e familiar with safety regulations while wor king in a hazardous area. ·#scaffolding if required shall e arranged y dewa. ·#crane if required shall e arranged y dewa. ·#all rigg ing and transporting equipment should e arranged y the contractor. this equipment should e duly tested and certified y the 3rd party inspection agency and the certificates should e produced on demand. qualified rigger, mechanics should e provided. ·#thework shall e executed under dewa supervision and as per quality/schedule requirement. ·#contractor#s supervisor shall e availale at site throu ghout the period of work. ·#entry permits for the staff/workers should e applied with passport copies having valid visa. persons, wh ose names are not availale in the list, will not e allowed to enter the powerhouse. ·#entry permits for the vehicle should e applied with copies of vehicle registration. ·#dewa will arrange necessary ptw / lc / hwp from operation, chemical la / fire department cle arances to carry out the scope of work under this contract. ·#the contractor upon receiving the work permit shall first ensure a saf e working condition. ·#all the persons should wear all the required ppe while atwork. ·#all material and tools rought in shall e de clared at power station security gate and the list of these items shall e signed y dewa security. the copies of these documents shal l e lodged with dewa engineer in-charge on daily asis. this document will e the asis for the clearance gate pass to take them out on completion of the jo. ·#service air, electricity and water for work at dewa site. it is the responsiility of the contractor to h ave his own arrangement in extending the electricity and water utility to his places of work including lighting.
supply of industrial fier optic switch, model:sfc800m-scm2, fier connector : sc connector, fier distance:2km, fier wave length:1310nm, power in put : dc12~48v, make: soltech, dcs hmi and accessories, duplex multimode fier adapter converter, type: sc female to lc male fier adapter, make: tripp-lite, model: n458-001- 62, caling: utilize existing sc caling with new lc type switches; duplex multimode 62.5/125 fier adapter lc-sc m/f 0.3m 1-ft., specification: cale type: multimode; connector-a: lc duplex male; connector-: sc duplex female, used for anet switches at lan4 cainet
supply of diff.press.transmitter, 3051cd1a02a1asjm5q4a9258q8, cal range: -62 to 62mar, rosemount make