Latest and live tenders published in qatar. Click on any tender to view further details.
qp refinery insurance assessor made risk observations / safety recommendations to qp with regard to containment of pool fires in susceptible fire zones & existing bund wall heights. hence, qp refinery initiated a study lc17106700 to review the kerbing / drainage requirements in fire susceptible zones and to recommend new kerbing / drainage system wherever required. also, existing bunds around tanks were identified which donot comply with refinery design criteria. this project is being carried out to implement the recommendations of study lc17106700. objective of this contract is to design, procure, install and construct new kerbing with associated drainage system at qp refinery in accordance with the scope of work, drawings and specifications. the main activities include but not limited to: new kerbing with drainage system, , design of new kerbing / grade slab / sump / manhole / drainage system., , underground scanning., , construction works., , hydrocarbon protection coating. increase of existing bund wall heights, , adequacy / storage capacity checks., , design of new bund / dyke walls, associated works to carryout the enhancement / modifications, etc., , construction works., , hydrocarbon protection coating.
modification of existing chemical store, associated building services and external works at dukhan.
contractor shall provide a tanker berthing assistance tug and supply all equipment, tools, tackle, personnel, services, supervision, consumable materials and each and every item of expense necessary for the provision of tanker berthing assistance tug at offshore locations. contract duration shall be one hundred twenty two 122 calendar months i.e. 10 years and 2 monthsfrom the effective date
epic for modification and improvement works to the existing occupied buildings at ngl complex, mesaieed. required as per the recommendations of mic qra 2015 and sq technical note on mitigation measures for ngl complex occupied buildings: which shall include: conversion of buildings nos. 7 & 9 into a new ngl laboratory. installation of toxic and flammable gas detectors at all occupied buildings. modification of the buldings hvac systems to close the fresh air intakes on detection of gas. upgrading the builidings to meet current building and safety codes and regulations and to meet safe haven standard. preparing the requirements for the demolition by other contractor at a later date of the buildings and portacabins that are to be abandoned.
property all risk par insurance for energy and non energy and general liability insurance third party liability insurance for woqod and its subsidiaries for a period of one year or three years
supply of manpower bunkering operator, loading fillers om and l, loading fillers bitumen and bunkering helper for logistic, distribution and operation
dry docking of sidra al khor
repair of car parking shed covers for ne ldo building
support services for hp service desk system 9.41 for a period of one year
supply of sidre branded mineral water for woqod retail sidra stores on call off basis for 3 years