Latest and live tenders published in united arab emirates. Click on any tender to view further details.
refilling of cylinder with helium-ultra high purity-pure gas, purity: 99.999%, cylinder pressure: 120 ar, cylinder size: 40 ltr, tes t report or certificate should e provided y vendor, collect the cylinder from c g-station, jeel ali&i.used for gas chromatograph of i&c g-station. contact person: mr. jameel tel 04-8044739 mo 055 5914274 or mr. saif tel 04-8044703 mo 055-5619815
rectification of patterson make 8 x 6 yr model electric motor griven fire pump at gdvy 132kv sustation. pump sl. no. fp-c051713-002 scope of work contains; repair of electric motor driven pump along with supply of all necessary spares. warranty to e provided for 6 months. work to e completed within 2 weeks from issue of po. current issue at site: non-drive end earing overheating site visit c an e arranged on only one day for all interested vendors. for site coordination and ptw, contact engr. sherief, 0529219010 other en quiries, contact mr. rajeesh, 04-3221325, 050-8650216
overhaul of vent valve with actuator of pst-15/25 description of work: overhaul of vent valve with actuator scope of work: 1. moi lization of people, material, tools and consumales 2. risk assessment and work method statement to e sumitted. 3. tool ox talk to e given to the contractor people on daily asis. 4. complete dismantling the actuator and valve, for dismantling the actuator and valve if it requires to dismantle the neary parts or assemly it will e in vendors# scope. 5. inspection of every and each parts of actuat or and valve 6. inspection with ndt 7. repair and rectification if necessary, if any small machining work required it will e in vend or#s scope. 8. reassemly the actuator and valve including other parts or assemly opened during dismantling and complete the work inall respect 9. leak test of the valve and functional test of the actuator 10. all the lifting tackles and tools required for the wor k to e rought y vendor and it shall e with valid certificate. lifting work will e in vendors scope 11. if need to take outside dewa then it will e in vendors# scope 12. sumission of details report of work done 13. paint similar color as existing. 14. work will e carried out as per dewa work schedule. 15. dewa health, safety and environment policy will e followed 16. work to e completed in all respect contact: for technical clarification please contact ezaz-0503493353/0555090835, emailmd. e@dewa.gov.ae, tariq-0555597553 scope of dewa: 1. all i&c and electrical instruments shall e disconnected y dewa 2. air supply as availale at one point 3. powersupply in one point 4. crane as availale 5. it is the responsiility of the contractor to have his own arrangement in extending the e lectricity and water utility to his places of work. for any ulk storage of water, contractor should make his own arrangement for sto rage tanks, etc. 6. the contractor, however, is required to furnish in advance his requirement of power and air with full justificat ion. contractor shall not waste or misuse the facilities provided y dewa. 7. isolations and permit to work of the designated equipme nt in line with dewa ptw procedure. 8. necessary entry permits for contractor personnel, equipment and vehicles as per dewa procedur e. warranty: 1. the warranty period for the works shall e one year from the date of commissioning 2. in case of anydamage/defect o f the work carried out under this contract within this warranty period, the contractor shall attend and carry out the necessary repa ir / replacement work and make good the defect within shortest period. the contractor will provide 24-hour emergency numer and will endeavor to e onsite within 24 hours of return request y dewa. 3. on eing given a notice of defect y dewa, the contractor shall arra nge to carry out the repair work within the prescried time limit as set out y dewa and all such contingencies shall e deemed to have een covered in the offer. payment: payment will e done as per actual work md ezazul haque khan sr engineer, g mst, japs, dewa, overhaul of vent valve with actuator of pst-15/25 description of work: overhaul ofvent valve with actuator scope of work: 1. moi lization of people, material, tools and consumales 2. risk assessment and work method statement to e sumitted. 3. tool ox talk to e given to the contractor people on daily asis. 4. complete dismantling the actuator and valve, for dismantling the actuator and valve if it requires to dismantle the neary parts or assemly it will e in vendors# scope. 5. inspection of every and each parts of actuat or and valve 6. inspection with ndt 7. repair and rectification if necessary, if any small machining work required it will e in vend or#s scope. 8. reassemly the actuator and valve including other parts or assemly opened during dismantling and complete the work in all respect 9. leak test of the valve and functional test of the actuator 10. all thelifting tackles and tools required for the wor k to e rought y vendor and it shall e with valid certificate. lifting work will e in vendors scope 11. if need to take outside dewa then it will e in vendors# scope 12. sumission of details report of work done 13. paint similar color as existing. 14. work will e carried out as per dewa work schedule. 15. dewa health, safety and environment policy will e followed 16. work to e completed in all respect contact: for technical clarification please contact ezaz-0503493353/0555090835, emailmd. e@dewa.gov.ae, tariq-0555597553 scope of dewa: 1. all i&c and electrical instruments shall e disconnected y dewa 2. air supply as availale at one point 3. power supply in one point 4. crane as availale 5. it is the responsiility of the contractor tohave his own arrangement in extending the e lectricity and water utility to his places of work. for any ulk storage of water, contractor should make his own arrangement for sto rage tanks, etc. 6. the contractor, however, is required to furnish in advance his requirement of power and air with full justificat ion. contractor shall not waste or misuse the facilities provided y dewa. 7. isolations and permit to work of the designated equipme nt in line with dewa ptw procedure. 8. necessary entry permits for contractor personnel, equipment and vehicles as per dewa procedur e. warranty: 1. the warranty period for the works shall e one year from the date of commissioning 2. in case of any damage/defect o f the work carried out under thiscontract within this warranty period, the contractor shall attend and carry out the necessary repa ir / replacement work and make good the defect within shortest period. the contractor will provide 24-hour emergency numer and will endeavor to e onsite within 24 hours of return request y dewa. 3. on eing given a notice of defect y dewa, the contractor shall arra nge to carry out the repair work within the prescried time limit as set out y dewa and all such contingencies shall e deemed to have een covered in the offer. payment: payment will e done as per actual work md ezazul haque khan sr engineer, g mst, japs, dewa.
overhauling of 40 hp copeland discus compressor. model: d6dj5 - 4000 awm / d, 380-420v, 3 ph275 / 304 lra. 2.#this includes, comp lete overhauling/servicing/ replacement of defective parts of the compressor. 3.#genuine parts shall e used for the overhauling. 4.# six months# warranty shall e provided for the overhauled compressor for the work/jo carried out y the contractor 5.#in the event of any defects noticed during guarantee period, contractor shall have to rectify the same as per instruction of concerned engineer wi thout any extra cost. 6.#the contractor shall visit the site to do the inspection of the compressor efore he sumits his id. plant / site visit and correspondence shall e communicated y email to mr. hesham mohamed,
farication of metal air filter as per sample. 1-filter frame will e gi material. 2-filter mesh will e t-304 standard stainless. 3-f ilter size 25x5x76 cm. the vendor shall provide 12 months warranty and the warranty period will start from the date of delivery of filters. collect the sample once get po and deliver the material to dewa, japs, l1-station, emd -dept., jael ali, duai.
gym annual maintenance works at al warsan every month free visit and additional free visit on call if required.for more information and visit the site please contact mr. syed aslam hussain04-32-23326
farication & supply of 2 nos. of 350 x 250 mm safety sign display oard as specified elow, which are olted on oth sides, facing oppos ite, to a mild steel pipe support welded with 250 x 250 mm aseplate, where it is anchored to the 300 x 300 x 150 mm concrete foundat ion casted on the top of chamer finished cover level with 10 years warrantykindly find the attached online files for more info cont ac mr. jithin 04-3220541
correction of alarm of sts at hatta pumping station phase-3. make: socomec model: statys sl.no: 13200378196001 alarm: a069 - st61 2 pc fault
supply of hydrogen cylinder refilling, purity 99.999%, pressure 200 ar, 64kg, volume 10m3, cylinders to e collected from l2 i&c workshop and r eturned ack again after reffiling. contact person saravanan 0552605069.
g station ph i whr diverter damper auma gear ox servicing work. gear ox details # drive shaft gear ox; make auma, gsh500l, and mod el.no. gsh500/l360, s.o.no 9206496, serial no 064960601, torque # 184400 ft/l, out put ratio: 52:1, lu: epo 2, tag no a 4516, for ph i dd drive contractor scope 1 contractor will provide competent experienced engineer to carry out all jos under his supervis ion.he must have experience in auma actuator and gear ox. 2 method of statment and risk assessment to e sumitted y contractor . 3 commissioning of dd unit in hot and cold condition after completion of gear ox work. 4 work completion report complete acti vity. 5 all work should e carried out as per dewa safety rules and regulations 6 complete responsiility of jo. 7 repair kit for auma actuator gear ox. dewa scope of work. 1 remove of existing gear ox from its position. 2 remove all hydraulic connection s and fix ack after servicing 3 remove old grease clean properly and replace grease. 4 carry out servicing work of gear ox. 5 ins tallation of gear ox at position. 6 dewa will provide spares, grease, new gear ox if required /avaliale, lifting tools, crane, skilled staff. for site visit contact # 1# a arad 0504611635 # hausahea@dewa.gov.ae. 2#adul rehman #055 8863330-adulrahman.alsa idi@dewa.gov.ae, g station ph i whr diverter damper auma gear ox servicing work. gear ox details # drive shaft gear ox; make auma, gsh500l, and mo del.no. gsh500/l360, s.o.no 9206496, serial no 064960601, torque # 184400 ft/l, out put ratio: 52:1, lu: epo 2, tag no a 4516, for ph i dd drive contractor scope 1 contractor will provide competent experienced engineer to carry out all jos under his supervi sion.he must have experience in auma actuator and gear ox. 2 method of statment and risk assessment to e sumitted y contracto r. 3 commissioning of dd unit in hot and cold condition after completion of gear ox work. 4 work completion report complete act ivity. 5 all work should e carried out as per dewa safety rules and regulations 6 complete responsiility of jo. 7 repair kit f or auma actuator gear ox. dewa scope of work. 1 remove of existing gear ox from its position. 2 remove all hydraulic connectio ns and fix ack after servicing 3 remove old grease clean properly and replace grease. 4 carry out servicing work of gear ox. 5 installation of gear ox at position. 6 dewa will provide spares, grease, new gear ox if required /avaliale, lifting tools, crane, skilled staff. for site visit contact # 1# a arad 0504611635 # hausahea@dewa.gov.ae. 2#adul rehman #055 8863330-adulrahman.als aidi@dewa.gov.ae.