Latest and live tenders published in united arab emirates. Click on any tender to view further details.
supply of dn 900, pn25 non return valve, for hatta ph2 pumping station. slanted seat design with lever, weight and end stage hydraulic damper, pn 25, face to face in acc. to en558-1 series 14 din 3202 f4, body & disc in ductile iron, shaft in duplex stainless steel, body seat stainless steel weld overlay & micro finishing, disc retaining ring in stainless steel, sealing ring in epdm, fasteners in sta inless steel, protective coating is fusion bonded epoxy with 300 microns dft and color code ral5005
supply of jamf com-rp jamf pro ios - 2500-4999 jamf com-rp jamf pro macos - 2500-4999 jamf com-rp jamf pro tvos - 2500-4999 mdscare hardware macos - ent -501-1000 mdscare for enterprise ios/ipados -ent 1000+ mds one day technical expert onsite support macos - ent jamf 200 course
repairing of battery operated hydraulic crimping tool, make, cembre .model, b131l-c, serial: 07as01 contact person: siva 050 4585483
supply of model: - ultramat 6e serial: - n1-nn-0137 7mb2123-0xd20-1pe1-z analyzer status: - co source and detector faulty. spares required to repair. part number # description # qty # a5e00076341 #no detector cell #01 # c79451a3462b598 #co detector cell #01 # a 5e02326861 #ir source #02 # 2- model:- ultramat 6eaux boiler 52 serial: - n1-x8-819 7mb2123-0xd20-1pe1-z analyzer status: - co no source and detector faulty part number #description #qty # a5e00076341 #no detector cell #01 # c79451a3462b598 #co detector model: - ultramat 23 serial: - n1 nn 0266 / 7mb2335-2cq00-3aa1 analyzer status: - ir source and detector faulty spares required repair. part number #description #qty # c79451-a3468-b206 #ir source #01 # c79451-a3468-b526 #detector #01 # 2- model: - ultra
contactors scope of works lake 132kv substation: 1. replace all defective condensate drain pipes and fittings, as per site condition for 8numbers hvac package units with new upvc pipes and fittings of similar size, with proper slope towards the nearest roof drain 2. the entire condensate drain piping shall be properly supported, insulated and duly finished with canvas cloth wrapping and two coats of vapor barrier foster seal. 3. provide aluminum cladding thickness .6 mm around the foster seal for the entire cd piping len gth. 4. use good quality new materials of proper thickness/class/density for executing the job. 5. flushing test shall be done for t he condensate drain pan and piping for each package unit upon completing the installation to ensure proper flow of water towards the roof drain. 6. contractor shall scrap the defective materials to dewa scrap yard. notes: a. party shall visit the site in order to understand and assess the complete scope of works prior to quote and then quote lump sum accordingly. contact details for arrangin g the site visit are: mr. rashid 055-9419528/04-3221477 or mr. suresh 052-6413078/04-3221471 b. contractor shall obtain the entr y permit permit to work- ptw approval from dewa-tcm department in the prescribed format prior to start the work upon the award of po. c. all loading, unloading and shifting of materials shall be under contractors scope. d. contractor shall provide minimum of on e year warranty for newly supplied materials & workmanship. e. the delivery note, test report, warranty certificate, job completion report along with po copy shall be submitted to dewa after successful completion of the work.
testing & calibration of high voltage test set- 100 kv, make: t&r, model: kv 100-100, mfg. sl. no.: iteo 567 calibration and certifi cation should be traceable with uncertainty measurements as per iso/iec 17025 specification.
replacement and pac refurbishment scope of work : 1 removal of two 2 existin g complete condenser coils 1 x 2 2 of skm package ac, model: pacx - 5032 yro supply, installation, testing and commissioning o f new condenser coils with copper to copper and thermo-guard coating. the air-cooled condenser coils should be as old coils technical specifications. 2 all mechanical & electrical work included in the scope. a. cutting, grinding, brazing of re frigerant pipes, disconnection, reconnection, removal, reinstallation condenser cooling fans & motors and testing & commissioning of the ac unit shall be carried out by contractor. b. disconnection of control & power cables connections shifting of the control panels from the structure of the condensing units as required for completing the job. c. control panel enclos ure shall be replaced and replace the defective component inside the panel. 3 removed condenser coil to be shift to d-station scrap yard by the contractor. 4 compressor oil drier core to be replace after first run. all bolt and nuts should be s/s and proper support to be provided. 6 the bidders shall submit expected lifetime of tubes & fins of their proposed condenser coils to evaluate their offer. 7 pressure test with nitrogen gas shall be at 400 psig for 48 hrs. 8 it is the contractor responsibility to take act ual measurements of coils as per site requirements. 9 package unit shall be painted by using anti-corrosive paint. 10 replace the ackage unit mounting springs & compressor mounting springs. 11 anti-corrosive thermo guard coating guarantees up to 08 years from d ate of commissioning. 12 contractor shall provide a complete schedule indicating time required for delivery & installation for the complete units given in our enquiry. 13 if any workmanship defects noticed, the same shall be rectify within 3 working days with al the materials required to restore the unit. 14 contractor has to replace the complete coil during the warranty if, a. a ny material/ manufacturing defects noticed in the supplied coil. b. coil fail to meet the performance requirement. 15 per formance test of the refurbished coil shall be carryout at the peak summer above 42 degree centigrade 16 any other
servicing/inspection of diesel pump set jmbr 132kv substation sap order no: 520609691 scope of work: diesel engine: test run the diesel engine and check engine speed. 2. test fire pump performance and record the results. 3. service of diesel engine in jectors. 4. service and re-calibration of diesel engine fuel pump. 5. replace of fuel filters. 6. service of heat exchanger and do p ressure test. 7. flush engine water jacket for cleaning of close cooling loop. 8. replace of water coolant fluid. 9. drain engine lu be oil and replace engine oil. 10. replace diesel engine lube oil filter. 11. replace engine upper head gasket if required. re place engine air filter cleaner. 13. test the diesel engine and re-adjust the engine speed. warranty: one year scope of work:
replacement and pac refurbishment. scope of work : 1 removal of two no#s of existing complete condenser coils 1 x 2 2 of skm package ac, model: pacx - 5032 yro, supply, installation, testing and commissi oning of two no#s of new condenser coils with copper to copper and thermo-guard coating. the new air-cooled condenser coils should b e same as old coils technical specifications. 2 all mechanical & electrical work included in the scope. a. cutting, grinding, brazing of refrigerant pipes, disconnection, reconnection, removal, reinstallation of condenser cooling fans & motors and testing & commissioning of the ac unit shall be carried out by contractor. b. disconnection of control & power cables connections
supply and fixing of amex saniver joint 1200 mm dia with duplex steel one no and 1200 mm dia with 316 stainless s teel clamp based on complaint wb-2000687624 at m-90 japs area.for more info call mr. ala on 04-3220053. job service pr for supply and fixing of amex saniver joint 1200 mm dia with duplex steel one no and 1200 mm dia with 316 stainless s teel clamp based on complaint wb-2000687624 at m-90 japs area. job service pr for supply and fixing of amex saniver joint 1200 mm dia with duplex steel one no and 1200 mm dia with 316 stainless s teel clamp based on complaint wb-2000687624 at m-90 japs area. job service pr for supply and fixing of amex saniver joint 1200 mm dia with duplex steel one no and 1200 mm dia with 316 stainless s