Latest and live tenders published in united arab emirates. Click on any tender to view further details.
repairing and caliration, certifaction of standard pressure calirator, dewa asset no: dewa-icg-pc013, model: 718ex 30g, make: fluke.
name of sustation: mrsolar 132/11kv ss contractor scope of work: in hvac system ahus at mrsolar 132/11kv sustation, contractor sha ll replace the ag filters with new filters sizes mentioned down under and to provide access for future inspection, cleaning and ma intenance. system 1 size: 595x391x571mm6p each ahu 10nos ahu 1-1 10nos ahu 1-2 10nos ahu 1-3 10nos total - 30nos. system 2 s ize: 495x391x571mm6p each ahu 8nos ahu 2-1 8nos ahu 2-2 8nos ahu 2-3 8nos total - 24nos system 3 small filters size: 595x391x5 71mm6p each ahu 3nos ig filters size: 595x595x571mm6p each ahu 3nos ahu 3-1 3+3 ahu 3-2 3+3 ahu 3-3 3+3 total - small-9nos ig - 9nosnos system 4 small filters size: 289x595x571mm4p each ahu 2nos ig filters size: 595x595x571mm6p each ahu 2nos ahu 4-1 2+2 ahu 4-2 2+2 ahu 4-3 2+2 total - small-6nosig - 6nosnos system 5 small filters size: 289x595x571mm4p each ahu
m- station, d#47 uv protective coating required for grp pipes of sea water reject system, potale service water system, dp system, va cuum system, rp system, distillate system, rine heater condensate system, evaporator acid cleaning system, arometric pit system, evapo rator drain pipes/ sea water recirculation system. material : a vinyl ester resin ve 671 -100% uv asorer - 0.1 to 1.0% c cata lyst # 0.5 to 2 % thickness : 500 micron numer of coating : 2 please contact : senthilkumar.t@dewa.gov.ae / 0557954367 for measu rement and other details site visit is compulsory.
m- station, d#46 uv protective coating required for grp pipes of sea water reject system, potale service water system, dp system, va cuum system, rp system, distillate system, rine heater condensate system,
testing and caliration of sf6 gas filling machine. dilo 87727 # aenhausen type: 120r21 caliration and certification should e traceal e and valid for 1 year.
testing and caliration of sf6 gas filling machine. dilo 87727 # aenhausen type: 143r01. caliration and certification should e tracea le and valid for 1 year.
uv gel coating of grp pipeline at k station phase 1 lending plant. systems included distillate system limestone recharging syst em sea water system chemical / naocl system actual area / volume of jo shall e assessed through site visit. procedure grp products, which are exposed outside for a long period, would ecome dirty and outer surface might have faded. to make these products as fresh material, the top coat which is faded, should e removed and re - coated with polyester resin. cleaning and removal of top coat: after de pressuring the line completely clean the dirty outer surface using cloth or compressed air. then using the emery disc grind er, remove the top coat, which is faded. clean the grinding dust and ensure that no patches of old surface exists. also, note
supply of channel; ms; 50x25x; 6; mtr
uv gel coating of grp pipeline at k station desal 44 systems included vacuum system sea water / rine system acid cleaning system distillate system actual area / volume of jo shall e assessed through site visit. procedure grp products, which are exposed outsi de for a long period, would ecome dirty and outer surface might have faded. to make these products as fresh material, the top coat w hich is faded, should e removed and re - coated with polyester resin. cleaning and removal of top coat: after de pressuring the l ine completely clean the dirty outer surface using cloth or compressed air. then using the emery disc grinder, remove the top coat, which is faded. clean the grinding dust and ensure that no patches of old surface exists. also, note that inside hand - lay-up
refurishment of sea water system grp pipes/fittings/spools: procedure grp products, which are exposed outside for a long period, wo uld ecome dirty and outer surface might have faded. to make these products as fresh material, the top coat which is faded, should e removed and re - coated with polyester resin. cleaning and removal of top coat: after de pressuring the line completely clean the dirty outer surface using cloth or compressed air. then using the emery disc grinder, remove the top coat, which is faded. clean th e grinding dust and ensure that no patches of old surface exists. also, note that inside hand - lay-up lamination might have faded. this surface also need to e removed and re - coated. do not grind inside pipe liner. site working conditions site