motor details: type: 3057.180-0021, 1.5kw, 3 phase, 50hz, 400v, connection: star, 3.6a, rpm: 2865, make: flygt. rewinding/repairing of motor and assemling the complete pump set. all required measurements to e recorded after repair jo. any other activity seems nece ssary for the proper operation of the motor should e executed. detailed repair report to e sumitted after the repair work containing all recorded parameters. warranty of one year to e provided for the repair and rewinding work.contact mohamed salem: 04-32-27856/ 0 561485396
scope of work include rectification, reset and testing pressure switch on site. pressure s witch to e rectified and tested. cylinder to e refilled if required. qty: 1 no. cylinder model: ig 100 make: lpg, spain for site co ordination and ptw, contact eng. sherief 0529219010 other enquiries, contact eng. reem, 04-8892156, 050-2272767
supply & install hq nets nylon/polypropylene with supports completely to the satisfaction of dewa engineer. in addition, to cover the roof for protection of lamps, pipes situated and around sound system, ehind footall cages, dead zones which are inaccessile and also at places where ullets can reach. contact yasir 050 4611 230
shoring and dewatering works for 1200 mm dia pipe line works @ measiemexcavation up to 8.00m from gl total perimeter 24 m are inc ludes all required material, manpower, pump, diesel etc, complete
dewatering works for 1200 mm dia pipe line works @ al sofouh 5excavation up to 8.00m from gl total perimeter 24 m are includes all required material, manpower, pump, dieseletc, complete.
replacement of existing faulty and osolete ups at najma pumping station phase-3 with modular redundant 3x20 kva 2x20+1x20 kva - n+1 configuration ups and modular attery for 30 minutes autonomy at 32kw load as per attached specifications.
supply of load testing and certi. of chain lock ; 1 ton
fire fighting pump house -k station remove existing paint from wall/concrete surface, prepare, clean and apply primer, followed y texture as required plus two coats of epoxy paint to match with the existing paint externally. includes scaffolding etc complete. the system used shall e from jotun or equivalent to the approval engineer in charge. with five years guarantee for the works.
main switch gear uilding 40ua - k station remove existing paint from wall/concrete surface, prepare, clean and apply primer, fol lowed y texture as required plus two coats of epoxy paint to match with the existing paint externally. includes scaffolding etc co mplete. the system used shall e from jotun or equivalent to the approval engineer in charge. with five years guarantee for the works
electrical room aux oiler 51-52-k station remove peeled off paint from steel surface, clean and apply two coats epoxy paint system followed y a top coat of approved polyurethane paint.. includes scaffolding etc complete to the approval engineer in charge. with five years guarantee for the works