Latest and live tenders published in all country. Click on any tender to view further details.
re-excavation of karotoa river from km.0.000 to km. 7.480 at vill-medinipur up-simanto upazilla-jibannagar under the project of small river khal & water bodies in 64 phase-1 1st revised during the fy 2020-21.
procurement of cast steel gate valves 3 4 6 8 10 & 12 inch.
1. improvement of mirpur gudara ghat-hajikeramat high school by bc road at ch. 00-440.00m under gazaria upazilla 2. improvement of soanair kandi bc bashgaon pacca road at ch. 00-1010.00m under gazaria upazilla 3. improvement of rasulpur gc kalipura by bc road via imam pur & baghaikandi road at ch.3800 -4450m under gazaria upazilla 4. improvement of sonali market-fuldi tangerchar up road by bc at ch. 3300-3630.00m under gazaria upazilla
a. improvement dhamdo-lalsir-tongibari uzr kari saheber bari near of mosque-dhamado gps road dhamdo-mamasar-tongibari uzr kari shahed mosque to uzr bridge via dhamado gps road at ch. 00-540m under sadar upazila road id 359564072. fixed cost recovered salvage amount tk. 71883.00 b. improvement of baralia gccr vanga-tongibari uzr road to salina member bari-mosque road baralia gccr road-h/o salina member via mosque road at ch. 00-1000m under sadar upazila road id 359564053. fixed cost recovered salvage amount tk. 492195.00
construction of 05 storied 152 beded girls hostel building with 5-storied foundation at & sub-level at govt. seikh fazilatunnessa mohila college sadar pile foundation
construction of academic building to selected non-government colleges at1.elisha islamia model college 2.somvupur sahe alom model college tazumuddin 3.collectorate school
marble stone fitting in front side of lift core including miscellaneous works from ground floor to fifth floor at 2nd academic building of bangladesh police academy sardah
construction of 4-storied academic building with 4-storied foundation in/c sanitarywater supply & electrification works at baitush sharaf jabbariya aa.ra.madrasha under langadu upzilla
construction of 4-storied academic building with 4-storied foundation in/c sanitarywater supply & electrification works at al-amin islamia fazil madrasha under sadar upzilla
construction of rigid pavement at ch. 24900 to 25000 km of madhupur kakraid-garobazar-sagordhigi-sokhipur road z-4014 under road division during the year 2020-2021.