Latest and live tenders published in all country. Click on any tender to view further details.
construction of boundary wall around proposed director banglow.
construction of vertical extension of boundary wall.
construction of duplex director banglow.
repair and maintenance of s4r irrigation canal in between km. 0.000 to km. 5.500 4100 m and t1s4r irrigation canal in between km. 0.000 to km. 2.500 1500 m total 5600 m both dyke during the year 2020-2021
repair & maintanence of a rangpur irrigation canal both dyke inbetween km 0.700 to km 1.015 200.00 m b t1r irrigation canal both dyke inbetween km 0.800 to km 1.180 330.00 m both dyke c s1r irrigation canal inbetween km.0.800 tokm.1.800404.00 m both dyke total length934.00 m in under ndr budget of o&m division during the year 2020-2021.
repair & maintanence of s8t irrigation canal both dyke a in between km.8.40 to km. 9.501065.00 m b in between km.9.550 to km. 10.300621.00 m both dyke and cin between from km. 13.600 to km. 14.100400.00 m both dyke total length2086.00 m in upazila under ndr budget of o&m division during the year 2020-2021.
repair & maintanence of a s8t irrigation canal in between km.0.100 to km. 1.500 726.00 m rigth dyke b t1s8t irrigation canal in between both dyke of km. 0.200 to km. 0.650 427.00 m and c t2s8t irrigation canal in between both dyke of km. 0.250 to km. 0.800 490.00 m total length1643.00 m in upazila under o&m division during the year 2020-2021.
repair & maintanence both dyke of t9s8t irrigation canal in between km 0.000 to km 1.670 1200 m b construction of escape from km 1.670 to km 1.770 100m in upazila gangachara under o&m division during the year 2020-2021.
slushy earth removing for s8at irrigation canal in between km 0.000 to km 3.000 1000 meter repair & maintanence both dyke of s8at in between km 0.000 to km 2.500 1000 meter b slushy earth removing for s8bt irrigation canal in between km 0.000 to km 2.500 1000 meter repair & maintanence of t7s8t irrigation canal both dyke in between km 0.000 to km 2.000 1000 mc repair & maintanence of t8s8t irrigation canal both dyke in between km 0.000 to km 1.00 500m &d c.c linning work for t6as8t 5 meter in upazila during the year 2020-2021.
construction of additional class room at ekdala narayanpur rps including furniture supply electrification environmental work etc. under pedp4 upazila 3h f4