Latest and live tenders published in bangladesh. Click on any tender to view further details.
construction & modernization of bangladesh national parliament building parliament members building & mp hostel with ancillary infrastructure.
supply & installation of 1000 va 8 nos online ups for installaing emergency light of plannary house together with ips and supply & installation of led tube light of national parliament bhaban s b. nagar
manufacturing & supplying of furniture bhola technical school & collegebhola sadarbhola.
installation of 182 nos. shallow tubewell with 6 pump at chowhali upazila in under project for safe water supply throughout the country pswsc of dphe during the fy 2019-2020.
dredging work of the surma river from km 91.000 to km 92.400 1.400 km and from km 94.200 to km 96.500 2.300 km total 3.700 km at upazila chattak in c/w protective work along the right bank of surma river at dowarabazar upazila complex loxmibaor and betura in upazila dowarabazar and chhatak in under o&m division-2 bwdb during the year 2020-2021 to 2022-2023.
dredging work of the surma river from km 97.000 to km 98.900 1.900 km and from km 100.700 to km 101.200 0.500 km total 2.400 km at upazila chattak in c/w protective work along the right bank of surma river at dowarabazar upazila complex loxmibaor and betura in upazila dowarabazar and chhatak in under o&m division-2 bwdb during the year 2020-2021 to 2022-2023.
dredging work of the surma river from km 101.200 to km 102.900 km 103.000 to km 104.100 total 2.800 km at upazila dowarabazar in c/w protective work along the right bank of surma river at dowarabazar upazila complex loxmibaor and betura in upazila dowarabazar and chhatak in under o&m division-2 bwdb during the year 2020-2021 to 2022-2023.
dredging work of the surma river from km 107.300 to km 108.8001.500km km 109.000 to km 110.2001.200 total 2.700 km at upazila dowarabazar in c/w protective work along the right bank of surma river at dowarabazar upazila complex loxmibaor and betura in upazila dowarabazar and chhatak in undero&m division-2 bwdb during the year 2020-2021 to 2022-2023.
construction of hill side drain including widening with hbb pavement at 27thp km and repair of damaged road pavement by aggregate base type-1 & repair seal coat at 16th km of heako-ramgarh-jaliapara road r-152 under road division during the year 2020-2021.
construction of upvc buried pipe line- pipe and fittings supplied by authority