re-excavation of 6.760 km. 1 kutir khal from km 0.000 to km. 1.300 1.300 km 2 jadukhali khal from km 0.000 to km. 1.270 1.270 km 3 kochatoli khal from km 0.000 to km. 2.720 2.720 km 4 beroil polita khal from km 0.000 to km. 0.810 0.810 km & 5 digholkandi khal from km 0.000 to km. 0.660 0.660 km in c/w south-west area water resources planning and management project swaiwrpmp phase-2 under bamonkhali-bornali sub project under magura o&m division bwdb during the year-2020-21.
construction of 02 nos. surface drainage pipe outlet 1.050m dia at anandonagor km. 3.300 & at shabri km.10.000 over kalidaskhali-arpara flood control embankment upazilla shalikha dist- magura in c/w kalidaskhali-arpara sub-project under south-west area integrated water resources planning and management project swaiwrpmp phase-2 under o&m division bwdb during the year 2020-21.
construction of additional class room bodiazzaman gps under pedp4 at noakhali sadar upazila.
protective work on the left bank of the river ghagot from km. 0.000 to km. 0.400400m at monmontho kutirpara in upazila mithapukur under rangpur o&m divisionbwdb
protective work on the right bank of the river ghagot from km. 0.000 to km. 0.190190m at dakkhin birabari km. 0.000 to km. 0.130130m at uttar birabari & km. 0.000 to km. 0.280280m at birabari bridge total 600 m in upazila rangpur sadar under o&m divisionbwdb
emergency supplying of 1st class bricks local sand f.m.0.50 coarse sand f.m2.50 sylhet sand & 20mm down well graded stone chips at rhd stackyard for maintenance work of different km of different road under shariatpur road division during the year-2020-2021.
supply of skilled semi-skilled and un-skilled labour for jungle cutting repair of potholes depression undulation by carpeting method repair of earthen shoulder and routine maintenance work at different roads of road sub-division-1 under road division during the year 2020-2021.
repair with seal coat work at ch 18650m to ch 19550m total working length 900.00m of dacope-baroaria-magurkhali-tala road z-7615 under road division during the year 2020-2021.
supply of unnotamaner mashur dal mota to potuakhali for the period of october/2020 to september/2021.
supply of unnotamaner cholar dal to jail for the period of october/2020 to september/2021.