Latest and live tenders published in bangladesh. Click on any tender to view further details.
rehabilitation of baruipara up-jogoti gc via tatibandth rhd road ch:3355-3830m) mirpur)
construction of r.c.c. railing, post culvert no.-2/3, 4/1) & earth filling, repair of flexible pavement with carpeting seal coat work at 2nd p), 4th p), 6th p) & 10th p) k.m. of mariamnagar-ranirhat road z-1617) under chittagong road division during the year 2013-2014.
repair seal coats work in between ch. lrp 231+830 to lrp 231+970 k.m. of dhaka-chittagong national highway n-1) alangkar moor towards city gate) under chittagong road division during the year 2013-2014.
repair/maintenance and breach closing of ml2 canal dyke from km 0.300 to 0.450, km 0.500 to 0.700 and ml2l1 canal dyke from km 0.000 to 0.120 and km 2.000 to 2.200 jungle cutting and removal of water hyacinth of ml2 canal from km 0.000 to 1.000 of manu mukh canal system in c/w manu river project under moulvibazar o&m division during the year 2013-14.
repair and maintenance of i3s19 irrigation canal right dyke from km. 8.200 to km. 8.800 & km. 9.000 to km. 9.650 total working length km. 1.250) in upazila- santhia, dist. pabna under pabna o&m division, bwdb, pabna. during the year 2013-14.
re-construction of flexible pavement, repair of potholes, strengthening by aggregate base type-i, surfacing of existing road pavement by dbs wearing course, surface drain,toe wall etc at lrp006+1160m -lrp008+259m lrp008+1059m -lrp008+1659m, lrp008+3059m -lrp012+270m, lrp012+2630m -lrp012+3520m, lrp021+4500m -lrp033+223m, lrp058+1080m –lrp079+334m, lrp079+934m -lrp089+405m, lrps -lrps+3500m of hathazari-fatikchari-manikchari-matiranga-khagrachari road r-160).
repairing and seal coat at 1st km & 2nd km of brahmanbaria town portion road n-103) road under road division brahmanbaria duting the year 2013-2014.
re-construction of flexible pavement, repairing by repair of potholes, strengthening by aggregate base type-i, surfacing of existing road pavement by dbs wearing course, protective work by rcc palasiding under dohazari road division during the year 2013-2014.
re-sectioning at both dyke of s-12a irrigation canal from km.0.500 to km. 0.900 in g.k. irrigation project under magura o&m division, bwdb, magura during the year 2013-2014.
supplying of stone chips, pea-gravel’s & fire wood for repairing the road surface & flanks at different road under road division, comilla during the year 2013-2014.