Latest and live tenders published in bangladesh. Click on any tender to view further details.
periodic maintenance of gasua-amanullah haque saheb bazar to amanullah up) from ch. 0+500 to 3+150km sandwip
periodic maintenance of charfession gc-dularhat gc, from ch: 00-1500m. [charfession]
periodic maintenance of gazaria-manika via dularhat, anjurhat road from ch: 4000-5550m [charfession]
periodic maintenance of raysree s) up office - khila bazar -bernaiya bazar road ch:0-2400m) shahrasti)
periodic maintenance of bagra bazar-farakkabad balia up) road ch. 00-2200m) chandpur-s)
re-construction of flexible pavement at 1st km, 2nd km 3rd km p), 6th km p) & 7th km p) of lebukhali-bauphal-golachipa-amragachia road under patuakhali road division during the year 2013- 2014.
construction of flexible pavement widening strengthening and surfacing including earth work & protective work at 17th km. p) & 18th km, rcc box culvert at 8th km 1x 3.50m x 5.00m) & 1x 4.00m x 5.00m at 10th km of chatmohor- handial- hamkuria road under road division, pabna during the year 2013-2014.
construction of road embankment, flexible pavement with surfacing including protective work by cc block at 6th km p) ,7th km p), 8th km p) 9th km p) & 10th km p) of chatmohor- handial- hamkuria road under road division, pabna during the year 2013-2014.
construction of flexible pavement widening strengthening and surfacing including earth work & protective work at 17th km . p) & 18th km, r c c box culvert 1x 3.50m x 5.00m) at 8th km & 1x 4.00m x 5.00m at 10th km of chatmohor- handial- hamkuria road under road division, pabna during the year 2013-2014
construction of 2 nos. double vent 2 x 6.00m clear) span & 6.00m clear) height at gap no. 4/1 ch: 3+745) & gap no. 11/1 ch: 10+520), 1 no. single vent 1 x 5.00m clear) span & 3.00m clear) height at gap no. 15/1 ch; 14+160), 1 no. single vent 1 x 6.00m clear) span & 6.00m clear) height at gap no. 15/2 ch: 14+880) rcc box culvert with u-type wing wall, earthwork and protective work at baburhat-matlab-pennai road.