Latest and live tenders published in bangladesh. Click on any tender to view further details.
slope protection of embankment from km. 0.430 to km. 0.930 = 0.500 km. in polder no. 30 under rehabilitation of bwdb infrastructures damaged by cyclone aila in coastal area south-western zone) project during the year 2013-2014 package no. e-t/08/khu2/p-30 sp)/otm/2013-14).
construction of drainage pipe outlet 1-vent 0.900m dia) silemanpur , km. 45.100 in polder no. 16 under rehabilitation of bwdb infrastructure damaged by cyclone aila in coastal area south-western zone) during the year 2013-2014 package no. e-t/07/khu2
construction of pipe outlet 1v-900mm dia) at km. 1.500 in amirpur-bhanderkot-baliadanga project under rehabilitation of bwdb infrastructures damaged by cyclone aila in coastal area south-western zone) project during the year 2013-2014 package no. e-t/06/khu2/abbp do)/otm/2013-14)
providing sanitary fixture installation work
providing joinery work
providing refurbishment work
providing ventilation and air-conditioning installation work
providing painting work
construction of boys hostel and administrative cum academic cum workshop building 04 storied building with 06 storied foundation) in/c internal sanitary & water supply arrangement and internal electrification works under the project of establishment of 4 textile institutes one at rangpur during the year 2013-2014.
construction of pagla thana bhaban including internal sanitary, water supply, electrification & ancillary works.