Latest and live tenders published in bangladesh. Click on any tender to view further details.
construction of 4 nos. 1 x 6.00m x 6.00m rcc box culvert at 38th km gap no.38/1) 41st km gap no.41/1 & 41/2) 43rd km gap no.43/1) and 1 no. 3 x 6.00m x 6.00m rcc box culvert at 42nd km gap no.42/1) of madanpur – dirai-sulla road z-2807) under sunamganj road division of sylhet road circle during the year 2012-2013.
providing of as per lot 1 to 42.
construction of n2, dhaka katchpur)- bhairab- jagadishpur-shaistagonj –sylhet-tamabil-jaflong road, lrp-002+73.50 ch.74.642) -lrp 090+680 ch.90+145)=15.503km ch.74.642 to ch. 90.145=15.503 km
construction of single vent 1 ?3.00 m clear) length & 4.00m clear) height r.c.c. box culvert with u-type wing wall at vadughar, lrp-69a ch. = 69km +643m) of comilla mainamoti)-brahmanbaria sarail) road n-102) under road division, brahmanbaria during the year 2012-2013.
construction of remaining work of incomplete 75.05 metre long 3 ? 24.40m) rcc girder bridge katapari bridge) at 16th km. of akatabazar-paharchanda-mognamaghat z-1125) road under coxs bazar road division during the year-2012-2013.
change of damaged 11kv lines rabit cable with 0.4kv lines repair & maintenance and shifting of 11/0.4 kv line lot 2.
construction of remaining work of 62.50m long rcc bridge at 10th km. of of salna razendrapur)-kapasia-toke-motkhola road under road division gazipur of rhd road circle, dhaka during the year 2012-2013
change of damaged 11kv lines rabit cable with 0.4kv lines repair & maintenance and shifting of 11/0.4 kv line lot 2.
change of damaged 11kv lines rabit cable with 0.4kv lines repair & maintenance and shifting of 11/0.4 kv line lot 2.
painting the electric post in median divider and installing honey comb reflecting sheet at 1st k.m . p) to 6th k.m. p) of banani-tongi-joydebpur road under dhaka road division, dhaka during 2012-2013.