Latest and live tenders published in bangladesh. Click on any tender to view further details.
improvement of auchpara sakil saroni road and borno mala school road by bc. 2.d-5406construction of rcc drain beside auchpara sakil saroni road & borno mala school road.3.r-5602improvement of the road from arichpur nazor ali mosque to sheer-e bangla road via nuro nobi house by rcc.4.d-5601construction of r.c.c drain from arichpur nazor ali mosque to sheer-e bangla road via nuro nobi house by rcc.5.d-5602construction of r.c.c drain from three storied mosque to sheer-e bangla road via khair house.6.r-5603improvement of the road from three storied mosque to sheer-e bangla road via khair house by bc.7.r-5603improvement of arichpur fire service road by bc.8.d-5603construction of r.c.c drain beside arichpur fire service road.9.d-5604construction of r.c.c drain starting from to modumita road to sheer bangle road via beltola & naker bari.10r-5704 improvement of anarkoly road by b.c11d-5704 construction of r.c.c drain starting from arichpur mosque road to gafour house and hashems house.
land development and construction of water reservoir sailo pit and master drain at ilst gopalganj
installation of deep tubewell with no.6 hand pump 78 nos at mollahat upazila in district under project for safe water supply throughout the country pswsc fy-2020-2021
installation of deep tubewell with no.6 hand pump 104 nos at mollahat upazila in district under project for safe water supply throughout the country pswsc fy-2020-2021
installation of deep tubewell with no.6 hand pump 104 nos at fakirhat upazila in district under project for safe water supply throughout the country pswsc fy-2020-2021
installation of deep tubewell with no.6 hand pump 104 nos at fakirhat upazila in district under project for safe water supply throughout the country pswsc fy-2020-2021
installation of deep tubewell with no.6 hand pump 130 nos at sadar upazila in district under project for safe water supply throughout the country pswsc fy-2020-2021
vertical extension work of existing 5-storied dormitory building from 5th floor to 6th floor at permanent hajj camp ashkona
construction of multilevel car parking system at police headquarters compound. sub-head construction of foundation of 16-storied multilevel car parking including ancillary works at police headquarters compound fulbaria
construction of multilevel car parking system at police headquarters compound. sub-head construction installation testing and commissioning of multilevel car parking system from 9th level to 16th level grid- 5b for 16 nos. car parking space as part of the whole 3 grid 16 level car parking system for 30 nos. car space at police headquarters compound fulbaria