List of latest m-r-i Tenders in Indian Tenders. Click on any m-r-i Tenders to view BOQ, NIT and Tender Documents. Get GeM Registration and Bidding Support, Vendor Registration for m-r-i Tenders.
Tender for ward no.10 ared-selected">mar shaheed baba red-selected">motirared-selected">m red-selected">mehra red-selected">mc park iron fence boundary wall and footpath work
Tender for construction of 7.00red-selected">mt flexible pavered-selected">ment of interred-selected">mediate lan width in 45 red-selected">mt t.p road of t.p. schered-selected">me no - 48 kholvad frored-selected">m block no- 67/p to 409/p
Tender for rered-selected">mediation work of legacy waste by supply, installation and cored-selected">mred-selected">missioning of fully autored-selected">mated segregation trored-selected">mred-selected">mel of red-selected">minired-selected">mured-selected">m 200 tonnes per day (tdp) capacity for processing and bio-red-selected">movered-selected">ment of wast/fresh wast, also providing required red-selected">machineries and vehicles forred-selected">movered-selected">ment of waste and recycled red-selected">material such as but not lired-selected">mited to jcb, dured-selected">mper, hyva, pocklain, bailing, fatka, shredder, etc. including providing as required site in-charge, supervisor, operator and labour and oandred-selected">m of plant and red-selected">machineries for (legacy waste/fresh waste) procesasing facility at rapar forrapar nagar palika, rapar with procurered-selected">ment of necessary all red-selected">machinery/ equipred-selected">ments along with erection, testing and cored-selected">mred-selected">missioning of waste process facility, construcion of basic infrastructure, civil and structural work with labours, operators etc. required for waste processing partial systered-selected">m for segregation and conditioning, necessary plot developred-selected">ment, inert to be disposed off at designated place of chred-selected">m area within 2.00kred-selected">m radius along with the operation and red-selected">maintenance for 01 year. (the tripping fees will be considered and provided on the basis of weight of produced red-selected">materials frored-selected">m processed red-selected">municipal solid waste). (i.e. output quantity is equal to input quantity - untreated quantity).