You have searched for road-construction in Projects. Click on any project to view further details.

11 Upgrading Kowali To Dumaria Road In Length Of 32.80 Km In Purbi Singhbhum District Of Jharkhand.
Project No # 24270 |  Singhbhum - Jharkhand
Project Cost :   Rs 64.50 Crore
Posted Date :   03 May, 2019
upgrading kowali to dumaria road in length of 32.80 km in purbi singhbhum district of jharkhand.
12 Widening And Strengthening Of 24.99 Km Stretch In The State. The Work Will Be Carried Out On Gura Musabani-Dumaria-Asthi-Koima Road-Jiyan-Dhalbhumgarh National Highway Nh-33 Road In Length Of 24.99 Km.
13 Widening Of Midc Road From Taloja Midc Road-Ambernath-Katai Naka Road In Thane District Of Maharashtra.
Project No # 24245 |  Thane - Maharashtra
Project Cost :   Rs 90.93 Crore
Posted Date :   20 Apr, 2019
widening of midc road from taloja midc road-ambernath-katai naka road in thane district of maharashtra.
14 Upgrading Four Lane Road From Naya Chowk Chitarpur Nh-320-Sandi On Mdr-95 And Sandi-Rajrappa Road Mdr-95 In Total Length Of 10.13 Km Along With Construction Of A Bridge In Hazaribagh District Jharkhand.
15 Widening Of Kheda-Dholka Road From 36.600 Km To 53.200 Km Widening Up To Four - Lane Strengthening Work, Hard Side Shoulder, Cross Drainage Work & Miscellaneous Work In Gujarat.
16 Strengthen Reconstruct Mahuda-Sindri Jamadoba Road Length, 22.94 Km Alongwith Construction Of Two High-Level Bridges In Dhanbad District Of Jharkhand Under Plan Head For The Year 2018-19.
17 Upgrading A 36.97 Km Stretch Road In Latehar District Of Jharkhand.
Project No # 24218 |  Latehar - Jharkhand
Project Cost :   Rs 90.62 Crore
Posted Date :   09 Apr, 2019
upgrading a 36.97 km stretch road in latehar district of jharkhand.
18 Raj Process Equipments & Systems, A Concessionaire, Is Upgrading Ashtavinayak Road Part-I At Various Stretches In Maharashtra On Hybrid Annuity Basis Ham
19 Construction Of Two-Laning With Paved Shoulder Of Imphal-Jiribam Section Of Nh-37 Nh-53 In Manipur.
Project No # 24216 |  Imphal - Manipur
Project Cost :   Rs 2, 388 Crore.
Posted Date :   09 Apr, 2019
construction of two-laning with paved shoulder of imphal-jiribam section of nh-37 nh-53 in manipur.
20 Hg Infra Engineering Has Incorporated A New Special Purpose Vehicle Spv For Construction Of The Proposed Narnaul Bypass Road In The State Of Haryana.

Set Upcoming Road Construction Project Alert...

349423

Advertisment