You have searched for road-construction in Projects. Click on any project to view further details.

31 Balance Construction Work Of Four - Laning Of Bareilly-Sitapur Section Of Nh-24 From 262.000 Km To 413.200 Km In The State Of Uttar Pradesh.
Project No # 24150 |  Bareilly - Uttar Pradesh
Project Cost :   Rs 780.7 Crore
Posted Date :   13 Mar, 2019
balance construction work of four - laning of bareilly-sitapur section of nh-24 from 262.000 km to 413.200 km in the state of uttar pradesh.
32 Construction Of Four - Laning Of Neraluru-Thorapalli-Agraharam Section Of Nh-844 From 0.000 Km To 23.350 Km Design Chainage Package-I Of Hosur Dharmapuri Section In The States Of Karnataka
33 Construction Of Four Laning Of Arawali-Kante Section And Cement Concretisation From 241.30 Km To 281.30 Km On Nh-66 Erstwhile-17 In Maharashtra.
Project No # 24134 |  Multi Location - Maharashtra
Project Cost :   Rs 594.33 Crore
Posted Date :   08 Mar, 2019
construction of four laning of arawali-kante section and cement concretisation from 241.30 km to 281.30 km on nh-66 erstwhile-17 in maharashtra.
34 Patil Construction And Infrastructure Has Undertaken Upgradation Of Ashtavinayak Road At Different Stretches In Pune District Of Maharashtra On Hybrid Annuity Mode Ham.
35 Arss Infrastructure Projects Ltd To Widening And Upgradation To Two Lane With Paved Shoulder Configuration And Geometric Improvements From 298.00 Km To 339.00 Km Package-7 On Aizwal-Tuipang Section Of Nh-54 In Mizoram On Engineering, Procurement And Const
36 Construction Of Four Lane Expressway From The Start Of Dsir Zone Of Ahmedabad District To Adhelai Village Of Bhavnagar District From Ch 71.00 To Ch 109.019 Section Of Ahmedabad Dholera Greenfield Alignment Nh-751 In Gujarat On Hybrid Annuity Mode Ham Unde
37 Upgradation Of Four Laning With Paved Shoulder On Odisha Border-Parlakhemundi-Ramanagundam-Bissamcuttack-Maniguda-Bhabanipatna In Length Of 207 Km In Gajapati District Of Odisha.
38 Connecting Kharghar To Amra Road Marg At Panvel And The Water Terminal At Nerul, Which Will Also Provide Access To The Proposed International Airport In Navi Mumbai Maharashtra.
39 Construction Of Metro Rail Depot Structures, Site Development Works, Internal Roads And Drainage Works In The Depot Area At Hebbagodi Karnataka
40 Construction Of Roadbed, Major And Minor Bridge, Etc Works In Connection With Doubling Between Azamgarh Excluding 43.50 Km And Shahganj Including 99.75 Km Total 56.25 Km In The Varanasi Division Uttar Pradesh

Set Upcoming Road Construction Project Alert...

577569

Advertisment