32Construction Of Four - Laning Of Neraluru-Thorapalli-Agraharam Section Of Nh-844 From 0.000 Km To 23.350 Km Design Chainage Package-I Of Hosur Dharmapuri Section In The States Of Karnataka
34Patil Construction And Infrastructure Has Undertaken Upgradation Of Ashtavinayak Road At Different Stretches In Pune District Of Maharashtra On Hybrid Annuity Mode Ham.
35Arss Infrastructure Projects Ltd To Widening And Upgradation To Two Lane With Paved Shoulder Configuration And Geometric Improvements From 298.00 Km To 339.00 Km Package-7 On Aizwal-Tuipang Section Of Nh-54 In Mizoram On Engineering, Procurement And Const
36Construction Of Four Lane Expressway From The Start Of Dsir Zone Of Ahmedabad District To Adhelai Village Of Bhavnagar District From Ch 71.00 To Ch 109.019 Section Of Ahmedabad Dholera Greenfield Alignment Nh-751 In Gujarat On Hybrid Annuity Mode Ham Unde
37Upgradation Of Four Laning With Paved Shoulder On Odisha Border-Parlakhemundi-Ramanagundam-Bissamcuttack-Maniguda-Bhabanipatna In Length Of 207 Km In Gajapati District Of Odisha.
38Connecting Kharghar To Amra Road Marg At Panvel And The Water Terminal At Nerul, Which Will Also Provide Access To The Proposed International Airport In Navi Mumbai Maharashtra.
40Construction Of Roadbed, Major And Minor Bridge, Etc Works In Connection With Doubling Between Azamgarh Excluding 43.50 Km And Shahganj Including 99.75 Km Total 56.25 Km In The Varanasi Division Uttar Pradesh