301 Widening, Improvements and Improvements to Riding Quality to Government Roads including construction of Storm water Drain and Retaining wall and Upkeeping for a period of 60 months in Rasipuram (H) C&M Sub Division (Package-44) The Following works are involved in this package 1) Widening from Two Lane to Three Lane and Improvements of Rasipuram - Attur road at km 3/0 - 3/650 including Construction of Storm Water Drain (MD402) including upkeeping for a period of 60 months (01-CRIDP-19-20-M-1329) 2) Improvements of Attaiyampatti - Masakkalipatti road at km 3/2 - 5/4 (MD46) including upkeeping for a period of 60 months (01-CRIDP-19-20-M-1331) 3) Improvements of Attaiyampatti - Masakkalipatti road at km 11/6 - 12/8 (MD46) including upkeeping for a period of 60 months (01-CRIDP-19-20-M-1337) 4) Construction of Retaining wall at km 0/4, 0/6 and 1/10 of Km 9/4 of Attayampatti - Masakalipatti road to Olaipatti road (via) Palanthinnipatti (01-CRIDP-19-20-O-2680) 5) Improvements to Riding Quality at km 5/4-7/300 of Rasipuram Byepass road (MD) including upkeeping for a period of 60 months (01-CRIDP-19-20-I-4565) 6) Improvements to Riding Quality at km 4/0-7/6 of Seerapalli - Singalantha puram road (Using plastic waste) including upkeeping for a period of 60 months (01-CRIDP-19-20-I-4578) 7) Improvements to Riding Quality at km 0/0 - 1/2 of Rasipuram - Attur road to Oilpatti road including upkeeping for a period of 60 months (01-CRIDP-19-20-I-4592) "
TRN : 733478 |  Salem - Tamil Nadu
Contract Value : 5.57 Crore | Agency Name : Highway Department
Tender award for widening, improvements and improvements to riding quality to government roads including construction of storm water drain and retaining wall and upkeeping for a period of 60 months in rasipuram (h) c&m sub division (package-44) the following works are involved in this package 1) widening from two lane to three lane and improvements of rasipuram - attur road at km 3/0 - 3/650 including construction of storm water drain (md402) including upkeeping for a period of 60 months (01-cridp-19-20-m-1329) 2) improvements of attaiyampatti - masakkalipatti road at km 3/2 - 5/4 (md46) including upkeeping for a period of 60 months (01-cridp-19-20-m-1331) 3) improvements of attaiyampatti - masakkalipatti road at km 11/6 - 12/8 (md46) including upkeeping for a period of 60 months (01-cridp-19-20-m-1337) 4) construction of retaining wall at km 0/4, 0/6 and 1/10 of km 9/4 of attayampatti - masakalipatti road to olaipatti road (via) palanthinnipatti (01-cridp-19-20-o-2680) 5) improvements to riding quality at km 5/4-7/300 of rasipuram byepass road (md) including upkeeping for a period of 60 months (01-cridp-19-20-i-4565) 6) improvements to riding quality at km 4/0-7/6 of seerapalli - singalantha puram road (using plastic waste) including upkeeping for a period of 60 months (01-cridp-19-20-i-4578) 7) improvements to riding quality at km 0/0 - 1/2 of rasipuram - attur road to oilpatti road including upkeeping for a period of 60 months (01-cridp-19-20-i-4592) "
302 Strengthening and Improvements to Government Roads including providing CC pavements and Construction of Retaining wall and Upkeeping for a period of 60 months in Senthamangalam (H) C&M Sub Division (Package-40) The Following works are involved in this package 1. Improvements of Mohanur - Namakkal - Sendamangalam - Rasipuram road at km 35/900 - 37/6 (SH 95) including upkeeping for a period of 60 months (01-CRIDP-19-20-S-0421) 2. Strengthening of Namakkal - Kananur road at km 23/0 - 24/8 (SH 161) including upkeeping for a period of 60 months (01-CRIDP-19-20-S-0423) 3. Improvements of Kolli Hills ghat road at km 20/0 - 22/0 including Providing CC Pavements and Construction of Parapets in Km 15/0 - 16/0 and 21/0-22/0(MD 181) including upkeeping for a period of 60 months (01-CRIDP-19-20-M-1333) 4. Construction of Retaining wall at km 24/0-24/4 of Namakkal - Kananur road (SH 161) (01-CRIDP-19-20-S-0446) 5. Construction of Retaining wall at km 13/4, 13/6, 13/10, 14/2, 19/6 and 19/8 of Valapurpirivu - Kulivalavu road (01-CRIDP-19-20- O-2688) 6. Construction of Retaining wall at km 0/10, 1/6, 1/8, 1/10, 2/10 and 3/2 of Solakadu - Kulivalavu road (01-CRIDP-19-20-P-3676) 7. Construction of Retaining wall at km 5/10, 6/2, 6/4, 6/8 and 6/10 of Solakadu - Kulivalavu road (01-CRIDP-19-20-P-3677)
303 Improvements and Improvements to Riding Quality to Government Roads including Widening of RCC slab culvert, Reconstruction of Pipe Culvert, Construction of Drain and Well Protective wall and Upkeeping for a period of 60 months in Namakkal (H) C&M Sub Division (Package-39) The Following works are involved in this package 1. Improvements to Riding Quality at km 4/100 - 6/0 of Valayapatti - Andapuram road (MD 531) including upkeeping for a period of 60 months (01-CRIDP-19-20-I-4561) 2. Improvements to Riding Quality at km 0/0 - 1/6 of Gajendranagar - Puliampatty road (Using plastic waste) including upkeeping for a period of 60 months (01-CRIDP-19-20-I-4577) 3. Improvements of Manappalli-Valavanthi road (via) Iyyer thottam road. at km 0/0 - 3/2 including upkeeping for a period of 60 months (01-CRIDP-19-20-O-2647) 4. Improvements of Palapatti (OHT) to Erumanaic kanpalayam road at km 0/0 - 2/8 including upkeeping for a period of 60 months (01-CRIDP-19-20-O-2649) 5. Improvements of Olugurpatty road at km 0/0 - 2/4 including upkeeping for a period of 60 months (01-CRIDP-19-20-P-3671) 6. Reconstruction Culverts at km 5/2 of Valayapatti - Andapuram road as Box Culvert including construction of Retaining wall (MD 531) (01-CRIDP-19-20-M-1348) 7. Widening RCC slab culvert at km 3/10 of Valayapatti - Andapuram road (MD 531) (01-CRIDP-19-20-M-1340) 8. Reconstruction of Narrow Pipe Culvert at km 3/6 and 5/10 of Kolakkattupudur - Annanagar road (01-CRIDP-19-20-O-2658) 9. Construction of Drain at km 50/550-50/600 & 61/8-62/2 of Komarapalayam - Pallipalayam - Jedarpalayam - Pandamangalam - Velur road and including construction of well protective wall at km 59/4(SH 198) (01-CRIDP-19-20-S-0439) 10. Construction of Drain at km 0/6-1/0 of Velur- Mohanur road (MD 547) (01-CRIDP-19-20-M-1349) 11. Construction of Well protecting wall at km 0/6 of Kolakkattupudur - Annanagar road (01-CRIDP-19-20-O-2659)"
TRN : 718806 |  Salem - Tamil Nadu
Contract Value : 5.41 Crore | Agency Name : Highway Department
Tender award for improvements and improvements to riding quality to government roads including widening of rcc slab culvert, reconstruction of pipe culvert, construction of drain and well protective wall and upkeeping for a period of 60 months in namakkal (h) c&m sub division (package-39) the following works are involved in this package 1. improvements to riding quality at km 4/100 - 6/0 of valayapatti - andapuram road (md 531) including upkeeping for a period of 60 months (01-cridp-19-20-i-4561) 2. improvements to riding quality at km 0/0 - 1/6 of gajendranagar - puliampatty road (using plastic waste) including upkeeping for a period of 60 months (01-cridp-19-20-i-4577) 3. improvements of manappalli-valavanthi road (via) iyyer thottam road. at km 0/0 - 3/2 including upkeeping for a period of 60 months (01-cridp-19-20-o-2647) 4. improvements of palapatti (oht) to erumanaic kanpalayam road at km 0/0 - 2/8 including upkeeping for a period of 60 months (01-cridp-19-20-o-2649) 5. improvements of olugurpatty road at km 0/0 - 2/4 including upkeeping for a period of 60 months (01-cridp-19-20-p-3671) 6. reconstruction culverts at km 5/2 of valayapatti - andapuram road as box culvert including construction of retaining wall (md 531) (01-cridp-19-20-m-1348) 7. widening rcc slab culvert at km 3/10 of valayapatti - andapuram road (md 531) (01-cridp-19-20-m-1340) 8. reconstruction of narrow pipe culvert at km 3/6 and 5/10 of kolakkattupudur - annanagar road (01-cridp-19-20-o-2658) 9. construction of drain at km 50/550-50/600 & 61/8-62/2 of komarapalayam - pallipalayam - jedarpalayam - pandamangalam - velur road and including construction of well protective wall at km 59/4(sh 198) (01-cridp-19-20-s-0439) 10. construction of drain at km 0/6-1/0 of velur- mohanur road (md 547) (01-cridp-19-20-m-1349) 11. construction of well protecting wall at km 0/6 of kolakkattupudur - annanagar road (01-cridp-19-20-o-2659)"
304 Improvements and Improvements to Riding Quality to Government Roads including Construction of Retaining wall and Upkeeping for a period of 60 months in Senthamangalam (H) C&M Sub Division (Package-41) The Following works are involved in this package 1. Improvements of Mohanur - Namakkal - Sendamangalam - Rasipuram road at km 30/2 - 32/4 (SH 95) including upkeeping for a period of 60 months (01-CRIDP-19-20-S-0422) 2. Construction of RCC Retaining wall at km 3/4 of Nanjundapuram - Naducombai road (MD 293) (01-CRIDP-19-20-M-1354) 3. Improvements to Riding Quality at km 3/850 - 8/0 of Nanjundapuram - Naducombai road (MD 293) including upkeeping for a period of 60 months (01-CRIDP-19-20-I-4566) 4. Construction of RCC Retaining wall at km 3/2 of Nanjundapuram - Naducombai road (MD 293) (01-CRIDP-19-20-M-1351) 5. Construction of Retaining wall at km 3/6 & 3/8 of Nanjundapuram - Naducombai road (MD 293) (01-CRIDP-19-20-M-1352) 6. Construction of Retaining wall at km 5/8 and 5/10 of Nanjundapuram - Naducombai road (MD 293) (01-CRIDP-19-20-M-1353) 7. Improvements to Riding Quality at km 1/8 - 2/8 of Kulivalavu - Othakadai road including upkeeping for a period of 60 months. (01-CRIDP-19-20-I-4594) 8. Improvements to Riding Quality at km 1/0 - 3/6 of Thirumalaipatti - Eadayapatti - Veerampatti road including upkeeping for a period of 60 months (01-CRIDP-19-20-I-4588)
TRN : 721326 |  Salem - Tamil Nadu
Contract Value : 6.84 Crore | Agency Name : Highway Department
Tender award for improvements and improvements to riding quality to government roads including construction of retaining wall and upkeeping for a period of 60 months in senthamangalam (h) c&m sub division (package-41) the following works are involved in this package 1. improvements of mohanur - namakkal - sendamangalam - rasipuram road at km 30/2 - 32/4 (sh 95) including upkeeping for a period of 60 months (01-cridp-19-20-s-0422) 2. construction of rcc retaining wall at km 3/4 of nanjundapuram - naducombai road (md 293) (01-cridp-19-20-m-1354) 3. improvements to riding quality at km 3/850 - 8/0 of nanjundapuram - naducombai road (md 293) including upkeeping for a period of 60 months (01-cridp-19-20-i-4566) 4. construction of rcc retaining wall at km 3/2 of nanjundapuram - naducombai road (md 293) (01-cridp-19-20-m-1351) 5. construction of retaining wall at km 3/6 & 3/8 of nanjundapuram - naducombai road (md 293) (01-cridp-19-20-m-1352) 6. construction of retaining wall at km 5/8 and 5/10 of nanjundapuram - naducombai road (md 293) (01-cridp-19-20-m-1353) 7. improvements to riding quality at km 1/8 - 2/8 of kulivalavu - othakadai road including upkeeping for a period of 60 months. (01-cridp-19-20-i-4594) 8. improvements to riding quality at km 1/0 - 3/6 of thirumalaipatti - eadayapatti - veerampatti road including upkeeping for a period of 60 months (01-cridp-19-20-i-4588)
305 Improvements and Improvements to Riding Quality to Government Roads including Junction Improvement, Construction of Drain and Centre Median and Upkeeping for a period of 60 months in Namakkal (H) C&M Sub Division (Package-38) The Following works are involved in this package 1.Improvements of Komarapalayam - Pallipalayam - Jedarpalayam - Pandamangalam - Velur road at km 53/6 - 56/0 (SH198) including upkeeping for a period of 60 months CRIDP 19-20-S-0417 2.Construction of Center Median at km 276/420-277/226 and 277/320-277/710 of Varanasi - Kanyakumari Road (Abandoned NH7) Velur Town (SH122) CRIDP 19-20-S-0427 3.Construction of Drain at km 38/620-39/050, 40/200-40/700 and 42/300-42/800 of Komarapalayam - Pallipalayam - Jedarpalayam - Pandamangalam - Velur road (SH198) CRIDP 19-20-S-0438 4.Improvements of Komarapalayam - Pallipalayam - Jedarpalayam - Pandamangalam - Velur road at km 36/2 - 38/2 (SH198) including upkeeping for a period of 60 months CRIDP 19-20-S-0425 5.Providing Junction improvement at km 36/2 of Komarapalayam - Pallipalayam - Jedarpalayam - Pandamangalam - Velur road (SH198) CRIDP 19-20-S-0450 6.Improvements to Riding Quality at km 38/2 - 40/0 of Komarapalayam - Pallipalayam - Jedarpalayam - Pandamangalam - Velur road (SH198) including upkeeping for a period of 60 months CRIDP 19-20-I-4553 "
306 Widening, Improvements and Improvements to Riding Quality to Government Roads including Curve Improvements, Construction and Widening of Pipe Culverts, Construction of Drain and Well Protective wall and Upkeeping for a period of 60 months in Namakkal (H) C&M Sub Division (Package-37) The Following works are involved in this package 1. Improvements of Namakkal-Kananur road at km 4/300-4/8 (SH161) including upkeeping for a period of 60 months (01-CRIDP-19-20-S-0416) 2. Widening from Twolane to Threelane and Improvements of Mohanur-Namakkal - Sendamangalam-Rasipuram road at km15/0-15/700 and including Widening of pipe culvert at km.15/6 Curve improvements with Strom water drain at Km18/8 (SH95) including upkeeping for aperiod of 60 months (01-CRIDP-19-20-S-0410) 3. Construction of Well protecting wall at km 22/2 of Mohanur - Namakkal - Sendamangalam - Rasipuram road (SH 95) (01-CRIDP-19-20-S-0428) 4.Construction of Well protecting wall at km 6/2 of Pullagoundam patti - Serukkalai road (01-CRIDP-19-20-O-2654) 5. Construction of Well protecting wall at km 2/6 of Oruvandur Pudur - Kidaram road (01-CRIDP-19-20-O-2655) 6. Construction of Well protecting wall at km 2/8 of Vagurampatti - Veppanatham road (01-CRIDP-19-20-O-2656) 7. Construction of Well protecting wall at km 7/2 of Rayarpalayam - Karuchipalayam -Kolaram road and Construction of Pipe Culvert at Km 6/4 (01-CRIDP-19-20-O-2657) 8. Improvements to Riding Quality at km 6/4 - 8/6 of Rayarpalayam - Karuchipalayam - Kolaram road including upkeeping for a period of 60 months (01-CRIDP-19-20-I-4571) 9. Improvements to Riding Quality at km 2/4 - 3/0 and 5/0 - 6/6 of Namakkal - Nainamalai road including upkeeping for a period of 60 months (01-CRIDP-19-20-I-4572) 10. Improvements to Riding Quality at km 0/0 - 1/0 of Pudupatti - Kurumbapatti road (Using plastic waste) including upkeeping for a period of 60 months (01-CRIDP-19-20-I-4573) 11. Improvements to Riding Quality at km 0/0 - 3/4 of Oruvandur Pudur - Kidaram road including upkeeping for a period of 60 months (01-CRIDP-19-20-I-4574) 12. Improvements to Riding Quality at km 0/0 - 0/6 and 1/6 - 2/8 of Vagurampatti - Veppanatham road including upkeeping for a period of 60 months (01-CRIDP-19-20-I-4575) 13. Improvements to Riding Quality at km 0/0 - 2/4 of Alampatti union road including upkeeping for a period of 60 months (01-CRIDP-19-20-I-4576) 14. Construction of Retaining wall at km 14/10 of Vallipuram - Palapatti road (01-CRIDP-19-20-O-2678) 15. Construction Well protecting wall at km 2/4 of Namakkal - Nainamalai road (01-CRIDP-19-20-O-2668) 16 Construction Well protecting wall at km 3/6 of Vettambadi - Lakkamanaic kenpatti road (01-CRIDP-19-20-O-2669) 17. Construction Well protecting wall at km 3/8 of Lathuvadi - N.Pudupatti road (01-CRIDP-19-20-O-2670) 18. Construction Well protecting wall at km 1/8 of Veesanam Vettambadi road (01-CRIDP-19-20-O-2671)
TRN : 721333 |  Salem - Tamil Nadu
Contract Value : 5.09 Crore | Agency Name : Highway Department
Tender award for widening, improvements and improvements to riding quality to government roads including curve improvements, construction and widening of pipe culverts, construction of drain and well protective wall and upkeeping for a period of 60 months in namakkal (h) c&m sub division (package-37) the following works are involved in this package 1. improvements of namakkal-kananur road at km 4/300-4/8 (sh161) including upkeeping for a period of 60 months (01-cridp-19-20-s-0416) 2. widening from twolane to threelane and improvements of mohanur-namakkal - sendamangalam-rasipuram road at km15/0-15/700 and including widening of pipe culvert at km.15/6 curve improvements with strom water drain at km18/8 (sh95) including upkeeping for aperiod of 60 months (01-cridp-19-20-s-0410) 3. construction of well protecting wall at km 22/2 of mohanur - namakkal - sendamangalam - rasipuram road (sh 95) (01-cridp-19-20-s-0428) 4.construction of well protecting wall at km 6/2 of pullagoundam patti - serukkalai road (01-cridp-19-20-o-2654) 5. construction of well protecting wall at km 2/6 of oruvandur pudur - kidaram road (01-cridp-19-20-o-2655) 6. construction of well protecting wall at km 2/8 of vagurampatti - veppanatham road (01-cridp-19-20-o-2656) 7. construction of well protecting wall at km 7/2 of rayarpalayam - karuchipalayam -kolaram road and construction of pipe culvert at km 6/4 (01-cridp-19-20-o-2657) 8. improvements to riding quality at km 6/4 - 8/6 of rayarpalayam - karuchipalayam - kolaram road including upkeeping for a period of 60 months (01-cridp-19-20-i-4571) 9. improvements to riding quality at km 2/4 - 3/0 and 5/0 - 6/6 of namakkal - nainamalai road including upkeeping for a period of 60 months (01-cridp-19-20-i-4572) 10. improvements to riding quality at km 0/0 - 1/0 of pudupatti - kurumbapatti road (using plastic waste) including upkeeping for a period of 60 months (01-cridp-19-20-i-4573) 11. improvements to riding quality at km 0/0 - 3/4 of oruvandur pudur - kidaram road including upkeeping for a period of 60 months (01-cridp-19-20-i-4574) 12. improvements to riding quality at km 0/0 - 0/6 and 1/6 - 2/8 of vagurampatti - veppanatham road including upkeeping for a period of 60 months (01-cridp-19-20-i-4575) 13. improvements to riding quality at km 0/0 - 2/4 of alampatti union road including upkeeping for a period of 60 months (01-cridp-19-20-i-4576) 14. construction of retaining wall at km 14/10 of vallipuram - palapatti road (01-cridp-19-20-o-2678) 15. construction well protecting wall at km 2/4 of namakkal - nainamalai road (01-cridp-19-20-o-2668) 16 construction well protecting wall at km 3/6 of vettambadi - lakkamanaic kenpatti road (01-cridp-19-20-o-2669) 17. construction well protecting wall at km 3/8 of lathuvadi - n.pudupatti road (01-cridp-19-20-o-2670) 18. construction well protecting wall at km 1/8 of veesanam vettambadi road (01-cridp-19-20-o-2671)
307 Strengthening, Improvements to Riding Quality, Construction of Retaining wall including up keeping for a period of 60 months in Govt. Roads in respect of Thiruthuraipoondi (H), C&M Subdivision Road A 01-CRIDP-19-20-S-0310 Strengthening of Thanjavur - Mannargudy - Thiruthuraipoondi - Vedaranyam - Kodiyakkari road at Km. 49/6 - 51/6 (SH63) including upkeeping for a period of 60 months Road B 01-CRIDP-19-20-S-0311 Strengthening of Thanjavur - Mannargudy - Thiruthuraipoondi - Vedaranyam - Kodiyakkari road at Km. 51/6 - 52/6 and 59/8 - 60/0 (SH63) including upkeeping for a period of 60 months Road C 01-CRIDP-19-20-S-0312 Strengthening of Mayiladuthurai - Thiruthuraipoondi Road at Km. 56/4 - 58/0 (SH23) including upkeeping for a period of 60 months Road D 01-CRIDP-19-20-I-4446 Improvements to Riding Quality at Km. 69/2 - 72/6 of Mayiladuthurai - Muthupet road (MD256) including upkeeping for a period of 60 months Road E 01-CRIDP-19-20-M-1286 Construction of Retaining wall at Km. 14/10 of Muthupet - Voimedu road (MD640) Road F 01-CRIDP-19-20-P-3666 Strengthening of Ovarur - Adithiravidar colony road at Km. 0/0 - 3/265 including upkeeping for a period of 60 months
308 Widening and Improvements, Strengthning, Improvements to Riding Quality, Reconstruction of culverts, Construction of Retaining wall including up keeping for a period of 60 months in Govt. Roads in respect of Keeranur (H), C&M Subdivision. Road A-01-CRIDP-19-20-S-0289-Strengthening of Thiruchirapalli - Ramanathapuram Road (Abandoned NH 210 Stretches) URBAN Stretches in keeranur at Km 27/2-28/6 including construction of retaining wall at km 28/2 (SH) including upkeeping for a period of 60 months Road B-01-CRIDP-19-20-I-4336- Improvements to Riding Quality at km 3/0-8/0 of Kunnandarkoil-Sengipatti road (MD 833) including upkeeping for a period of 60 months Road C-01-CRIDP-19-20-P-3641- Widening from Single Lane to Intermediate Lane and Improvements of Kulathur-Pakudy road at km 1/0-1/6 and 3/6-5/0,including reconstruction of culvert at km 4/8 (using plastic waste) including upkeeping for a period of 60 months Road D-01-CRIDP-19-20-I-4348- Improvements to Riding Quality at km 0/0-4/8 of Trichy-Madurai(Via)Melur road to Meenaveli road including upkeeping for a period of 60 months.
309 Improvement Works including upkeeping in Vandavasi (H) C&M Sub Division Jurisdiction A) Improvements of Thellar - Senal - Nergunam Road to Pennattagaram Road at Km 0/0 - 2/2 including Upkeeping for a period of 60 months B) Improvements of Marudadu - Vepankaranai Road to Eramalur Road to Moodur at Km 0/0 - 3/5 including Upkeeping for a period of 60 months C) Improvements to Riding Quality at Km 0/0 - 3/8 of Vedal Road to Vadakkupattu Road (via) Magamayi, Thirumani including Upkeeping for a period of 60 months D) Improvements of Kottai - Badur Road at Km 6/0 - 8/0 including Upkeeping for a period of 60 months E) Improvements of Kottai - Badur Road at Km 8/0 - 10/2 including Upkeeping for a period of 60 months
310 Strengthening, Improvements and Improvements to Riding Quality, Reconstruction of Culverts including up keeping for a period of 60 months in Govt. Roads in respect of Thirumayam (H), C&M Subdivision. Road A, 01-CRIDP-19-20-S-0285, Strengthening of Thanjavur - Pattukkottai - Aranthangi - Karaikudi - Kallal - Kalayarkovil - Maravamangalam - Ellangudi - Paramakudi - Muthukulathur - Sayalkudi road At km 110/6-111/6 (SH 29) including Upkeeping for a period of 60 months Road B, 01-CRIDP-19-20-I-4344, Improvements to Riding Qulaity at km 17/8-18/8,19/6-21/0,21/6-24/6 and 25/0-25/6 of Pudukkottai-Embal road (MD663) including Upkeeping for a period of 60 months Road C, 01-CRIDP-19-20-O-2377, Improvements of Sivapuram - Neivasalpatti road at Km 2/0-6/0 including Re-construction of culvert at Km 2/2 including Upkeeping for a period of 60 months Road D, 01-CRIDP-19-20-O-2353, Improvement of km 1/2 of Arimalam - Thirumayam road to Pudupatti - Nedungudi road (via) Melnilaipatti road at km 11/0-14/4 including Re-construction of culverts at km 11/2,11/10,12/4,13/2,13/6 and 13/8 including Upkeeping for a period of 60 months Road E, 01-CRIDP-19-20-I-4367, Improvements to Riding Quality at km 22/0-24/0 of Panyapatti - Rangiyem Road including Upkeeping for a period of 60 months.