312Strengthening, Improvements to Riding Quality, Construction of Retaining wall including up keeping for a period of 60 months in Govt. Roads in respect of Thiruthuraipoondi (H), C&M Subdivision
Road A 01-CRIDP-19-20-S-0310 Strengthening of Thanjavur - Mannargudy - Thiruthuraipoondi - Vedaranyam - Kodiyakkari road at Km. 49/6 - 51/6 (SH63) including upkeeping for a period of 60 months
Road B 01-CRIDP-19-20-S-0311 Strengthening of Thanjavur - Mannargudy - Thiruthuraipoondi - Vedaranyam - Kodiyakkari road at Km. 51/6 - 52/6 and 59/8 - 60/0 (SH63) including upkeeping for a period of 60 months
Road C 01-CRIDP-19-20-S-0312 Strengthening of Mayiladuthurai - Thiruthuraipoondi Road at Km. 56/4 - 58/0 (SH23) including upkeeping for a period of 60 months
Road D 01-CRIDP-19-20-I-4446 Improvements to Riding Quality at Km. 69/2 - 72/6 of Mayiladuthurai - Muthupet road (MD256) including upkeeping for a period of 60 months
Road E 01-CRIDP-19-20-M-1286 Construction of Retaining wall at Km. 14/10 of Muthupet - Voimedu road (MD640)
Road F 01-CRIDP-19-20-P-3666 Strengthening of Ovarur - Adithiravidar colony road at Km. 0/0 - 3/265 including upkeeping for a period of 60 months
TRN :
775883
|
Trichy - Tamil Nadu
Contract Value :
6.17 Crore |Agency Name :
Highway Department
314Widening, Strengthening, Improvements to Riding Quality, including Reconstruction of Culverts, including up keeping for a period of 60 months in Govt. Roads in respect of Mannargudi (H), C&M Subdivision.
Road A, 01-CRIDP-19-20-M-1259-, Widening from Intermediate lane to Two lane and Strengthening of Mannargudi - Orathanadu - Thiruvonam road at km 10/8 - 12/8 (MD 248) including upkeeping for a period of 60 months
Road B, 01-CRIDP-19-20-M-1260-, Widening from Intermediate lane to Two lane and Strengthening of Mannargudi - Orathanadu - Thiruvonam road at km 8/8 - 10/8 (MD 248) including upkeeping for a period of 60 months
Road C,01-CRIDP-19-20-I-4440-,Improvements to Riding Quality at km 6/4 - 8/4 of Mannargudi - Thirumakkottai - Chockanavoor road (MD 840) including upkeeping for a period of 60 months Road D, 01-CRIDP-19-20-P-3664-, Strengthening of Senthangudy - Seruvamani road at km 0/0 - 3/320 including upkeeping for a period of 60 months
Road E,01-CRIDP-19-20-O-2575-, Reconstruction of Box culvert at km 0/8, 2/6 of Senthangudy - Seruvamani road including Pipe culvert at Km.1/2
Road F,01-CRIDP-19-20-I-4462-, Improvements to Riding Quality at km 0/0 - 3/2 of Thulasenthirapuram - Painganadu road including upkeeping for a period of 60 months.
TRN :
744715
|
Trichy - Tamil Nadu
Contract Value :
6.16 Crore |Agency Name :
Highway Department
315Strengthening, Reconstruction of Box culverts, Construction of Retaining wall including up keeping for a period of 60 months in Govt. Roads in respect of Thiruvarur (H), C&M Subdivision
Road A 01-CRIDP-19-20-S-0313 Strengthening of Nagapattinam - Gudalore - Mysore Road (Old abandoned NH:67) - Tiruvarur Town Limit(SHU89) at Km. 24/050 - 24/650 including upkeeping for a period of 60 months
Road B 01-CRIDP-19-20-O-2547 Strenghthening of Kangalanchery - Vadakandam Road at Km. 0/0-2/0 including upkeeping for a period of 60 months
Road C 01-CRIDP-19-20-O-2548 Strenghthening of Kangalanchery - Vadakandam Road at Km.2/0-4/0 including upkeeping for a period of 60 months
Road D 01-CRIDP-19-20-O-2549 Strenghthening of Kangalanchery - Vadakandam Road at Km.4/0-6/0 including upkeeping for a period of 60 months
Road E 01-CRIDP-19-20-O-2550 Strenghthening of Kangalanchery - Vadakandam Road at Km. 6/0-7/2 including upkeeping for a period of 60 months
Road F 01-CRIDP-19-20-O-2578 Construction of Retaining Wall at Km.0/4 of Kangalanchery -Vadakandam Road
Road G 01-CRIDP-19-20-O-2576 Reconstruction of Box Culvert at Km.4/6, 6/2 of Mangudi - Kamalapuram - Koradachery Road.
TRN :
744716
|
Trichy - Tamil Nadu
Contract Value :
6.16 Crore |Agency Name :
Highway Department
316Restoration work of road flank by Dressing and Chilchalling, Earth work, painting guard post of KRCC Road, Lagdhi Keshargarh Road, Napara Koira Road, Tamna Hesla Arsha Road and DCDKM Road from 12.00kmp to 24.00 kmp under Purulia Highway Sub-Division of Purulia Highway Division during the year 2019-20.
TRN :
709199
|
Purulia - West Bengal
Contract Value :
4.20 Lacs |Agency Name :
Highway Department
317Post monsoon restoration work in urgent basis by Clearing and Grubbing road land, Earth work, Painting of guard post, of Balarampur-Barabazar-Sindri road from 0.00 to 18.00 kmp,Jhalda-Bagmundi road from 0.00 to 9.00kmp and Balarampur-Bagmundi road from 0.00 to 26.00 kmp under Balarampur Highway Sub-Division of Purulia Highway Division during the year 2019-20.
TRN :
709200
|
Purulia - West Bengal
Contract Value :
3.57 Lacs |Agency Name :
Highway Department
318Construction of Metal Crash Barrier at bridge, culvert approach and sharp bend alongwith allied work at Jalpaiguri to Choulhati Road from 0.00 kmp to 18.60 km and Talmahat to Jahurihat Road from 0.00 kmp to 10.00 kmp under Jalpaiguri Highway Division in the district
TRN :
709201
|
Jalpaiguri - West Bengal
Contract Value :
43.66 Lacs |Agency Name :
Highway Department
320Upgradation of Four Panchayat Union Roads / Panchayat Roads as Other District Roads in Paramakudi (H) NABARD and Rural Roads Sub Division (Package 24)
TRN :
713039
|
Tirunelvelli - Tamil Nadu
Contract Value :
6.15 Crore |Agency Name :
Highway Department