671 Strengthening, Widening, Improvements and Improvements to Riding Quality to Government Roads including Construction of CD Works, Drain and up keeping the roads for a period of 60 months in Valappady C&M Sub Division (Package-12) The Following works are involved in this package 1. Widening from Intermediate lane to Two lane and Improvements of Puthiragoundampalayam - Edapatty Road (via) Panamadal at km 5/0 - 6/6 (M669) Including upkeeping for a period of 60 months (01-CRIDP-19-20-M-1287) 2. Widening from Intermediate lane to Two lane and Improvements of Puthiragoundampalayam - Edapatty Road (via) Panamadal at km 7/6 - 8/6 (M669) Including upkeeping for a period of 60 months (01-CRIDP-19-20-M-1288) 3. Improvements to Riding Quality at km 0/0 - 0/2, 0/6- 1/100 , 4/8 - 5/0 and 5/4 - 6/0 of Valapady- Thimmanaickenpatty Road including construction of pipe culvert at Km.0/2(MD 530) Including upkeeping for a period of 60 months (01-CRIDP-19-20-I-4469) 4. Improvements to Riding Quality at km 6/8 - 7/4, 7/6- 8/0 and 8/8 - 9/2 of Valapady- Thimmanaickenpatty Road including construction of pipe culvert at Km.0/10 (i) and (ii)(MD 530) Including upkeeping for a period of 60 months (01-CRIDP-19-20-I-4470) 5. Improvements to Riding Quality at km 0/0-1/0 of Pagadupattu-Moongilpattu Road Including upkeeping for a period of 60 months (01-CRIDP-19-20-I-4511) 6. Strengthening of Palaniapuri to Road from km 32/8 of Salem-Ulundurpet road (via) Thalavaipatty, Thennampillaiyur, Ariyapalayam, E.Karadipatty, West Rajapalayam and Thamaiyanur road at km 9/8 - 10/8, 11/4 - 12/4, 14/0 - 14/6 and 16/6 - 17/0 Including upkeeping for a period of 60 months (01-CRIDP-19-20-O-2587) 7. Widening from Intermediate lane to Two lane and Improvements of Ayothiyapattinam-Belur- Kilakkadu Road at km 51/0 - 52/4 Including Construction of Drain at km.51/0-51/8 (MD 1044) Including upkeeping for a period of 60 months (01-CRIDP-19-20-M-1291)"
TRN : 719198 |  Salem - Tamil Nadu
Contract Value : 7.00 Crore | Agency Name : Highway Department
Tender award for strengthening, widening, improvements and improvements to riding quality to government roads including construction of cd works, drain and up keeping the roads for a period of 60 months in valappady c&m sub division (package-12) the following works are involved in this package 1. widening from intermediate lane to two lane and improvements of puthiragoundampalayam - edapatty road (via) panamadal at km 5/0 - 6/6 (m669) including upkeeping for a period of 60 months (01-cridp-19-20-m-1287) 2. widening from intermediate lane to two lane and improvements of puthiragoundampalayam - edapatty road (via) panamadal at km 7/6 - 8/6 (m669) including upkeeping for a period of 60 months (01-cridp-19-20-m-1288) 3. improvements to riding quality at km 0/0 - 0/2, 0/6- 1/100 , 4/8 - 5/0 and 5/4 - 6/0 of valapady- thimmanaickenpatty road including construction of pipe culvert at km.0/2(md 530) including upkeeping for a period of 60 months (01-cridp-19-20-i-4469) 4. improvements to riding quality at km 6/8 - 7/4, 7/6- 8/0 and 8/8 - 9/2 of valapady- thimmanaickenpatty road including construction of pipe culvert at km.0/10 (i) and (ii)(md 530) including upkeeping for a period of 60 months (01-cridp-19-20-i-4470) 5. improvements to riding quality at km 0/0-1/0 of pagadupattu-moongilpattu road including upkeeping for a period of 60 months (01-cridp-19-20-i-4511) 6. strengthening of palaniapuri to road from km 32/8 of salem-ulundurpet road (via) thalavaipatty, thennampillaiyur, ariyapalayam, e.karadipatty, west rajapalayam and thamaiyanur road at km 9/8 - 10/8, 11/4 - 12/4, 14/0 - 14/6 and 16/6 - 17/0 including upkeeping for a period of 60 months (01-cridp-19-20-o-2587) 7. widening from intermediate lane to two lane and improvements of ayothiyapattinam-belur- kilakkadu road at km 51/0 - 52/4 including construction of drain at km.51/0-51/8 (md 1044) including upkeeping for a period of 60 months (01-cridp-19-20-m-1291)"
672 Widening and Improvements, Improvements, Improvements to Riding Quality, Widening of Pipe Culverts, Reconstruction of Slab Culverts and including Up Keeping for a period of 60 Months on Government Roads in Vellakovil (Highways), C&M, Sub Division. Package No.57 Road A :- Widening from Two lane to Three lane and Improvements of Erode - Mulanur road (via) Muthur, Vellakovil and Puthuppai at km 42/0 - 42/500 (SH 84 A) including upkeeping for a period of 60 months Road B :- Improvements of Erode - Mulanur road (via) Muthur, Vellakovil and Puthuppai at km 42/500 - 43/6 (SH 84 A) including upkeeping for a period of 60 months Road C :- Widening from Single lane to Intermediate lane and Improvements of Parakadai - Punjaithalayur road (via) Manalur road at km 0/0 - 1/0 including Reconstruction of slab culvert at km 0/8 and widening of pipe culvert at Km 0/10 including upkeeping for a period of 60 months Road D :- Improvements of Parakadai - Punjaithalayur road (via) Manalur road at km 14/2 - 16/2 and 16/6 - 21/450 including upkeeping for a period of 60 months Road E :- Improvements of Ponparapi - Kambaliampatty road at km 7/0 - 10/8 ( Using Plastic Waste ) including upkeeping for a period of 60 months Road F :- Improvements to Riding Quality at km 8/0 - 11/300 of Uthiyur - Dasanaickenpatty (MD 993) including upkeeping for a period of 60 months Road G :- Improvements to Riding Quality at km 11/700 - 14/0 of Uthiyur - Dasanaickenpatty (MD 993) including upkeeping for a period of 60 months Road H :- Improvements to Riding Quality at km 0/0 - 3/6 and 6/6 - 7/0 of Nagapattinam - Gudalur - Mysore road to Ganapathipalayam road including upkeeping for a period of 60 months"
TRN : 716242 |  Tirupur - Tamil Nadu
Contract Value : 6.46 Crore | Agency Name : Highway Department
Tender award for widening and improvements, improvements, improvements to riding quality, widening of pipe culverts, reconstruction of slab culverts and including up keeping for a period of 60 months on government roads in vellakovil (highways), c&m, sub division. package no.57 road a :- widening from two lane to three lane and improvements of erode - mulanur road (via) muthur, vellakovil and puthuppai at km 42/0 - 42/500 (sh 84 a) including upkeeping for a period of 60 months road b :- improvements of erode - mulanur road (via) muthur, vellakovil and puthuppai at km 42/500 - 43/6 (sh 84 a) including upkeeping for a period of 60 months road c :- widening from single lane to intermediate lane and improvements of parakadai - punjaithalayur road (via) manalur road at km 0/0 - 1/0 including reconstruction of slab culvert at km 0/8 and widening of pipe culvert at km 0/10 including upkeeping for a period of 60 months road d :- improvements of parakadai - punjaithalayur road (via) manalur road at km 14/2 - 16/2 and 16/6 - 21/450 including upkeeping for a period of 60 months road e :- improvements of ponparapi - kambaliampatty road at km 7/0 - 10/8 ( using plastic waste ) including upkeeping for a period of 60 months road f :- improvements to riding quality at km 8/0 - 11/300 of uthiyur - dasanaickenpatty (md 993) including upkeeping for a period of 60 months road g :- improvements to riding quality at km 11/700 - 14/0 of uthiyur - dasanaickenpatty (md 993) including upkeeping for a period of 60 months road h :- improvements to riding quality at km 0/0 - 3/6 and 6/6 - 7/0 of nagapattinam - gudalur - mysore road to ganapathipalayam road including upkeeping for a period of 60 months"
673 Strengthening, Widening, Improvements and Improvements to Riding Quality to Government Roads including Construction of CD Works, Drain and up keeping the roads for a period of 60 months in Valappady C&M Sub Division (Package-12) The Following works are involved in this package 1. Widening from Intermediate lane to Two lane and Improvements of Puthiragoundampalayam - Edapatty Road (via) Panamadal at km 5/0 - 6/6 (M669) Including upkeeping for a period of 60 months (01-CRIDP-19-20-M-1287) 2. Widening from Intermediate lane to Two lane and Improvements of Puthiragoundampalayam - Edapatty Road (via) Panamadal at km 7/6 - 8/6 (M669) Including upkeeping for a period of 60 months (01-CRIDP-19-20-M-1288) 3. Improvements to Riding Quality at km 0/0 - 0/2, 0/6- 1/100 , 4/8 - 5/0 and 5/4 - 6/0 of Valapady- Thimmanaickenpatty Road including construction of pipe culvert at Km.0/2(MD 530) Including upkeeping for a period of 60 months (01-CRIDP-19-20-I-4469) 4. Improvements to Riding Quality at km 6/8 - 7/4, 7/6- 8/0 and 8/8 - 9/2 of Valapady- Thimmanaickenpatty Road including construction of pipe culvert at Km.0/10 (i) and (ii)(MD 530) Including upkeeping for a period of 60 months (01-CRIDP-19-20-I-4470) 5. Improvements to Riding Quality at km 0/0-1/0 of Pagadupattu-Moongilpattu Road Including upkeeping for a period of 60 months (01-CRIDP-19-20-I-4511) 6. Strengthening of Palaniapuri to Road from km 32/8 of Salem-Ulundurpet road (via) Thalavaipatty, Thennampillaiyur, Ariyapalayam, E.Karadipatty, West Rajapalayam and Thamaiyanur road at km 9/8 - 10/8, 11/4 - 12/4, 14/0 - 14/6 and 16/6 - 17/0 Including upkeeping for a period of 60 months (01-CRIDP-19-20-O-2587) 7. Widening from Intermediate lane to Two lane and Improvements of Ayothiyapattinam-Belur- Kilakkadu Road at km 51/0 - 52/4 Including Construction of Drain at km.51/0-51/8 (MD 1044) Including upkeeping for a period of 60 months (01-CRIDP-19-20-M-1291)"
TRN : 720200 |  Salem - Tamil Nadu
Contract Value : 7.00 Crore | Agency Name : Highway Department
Tender award for strengthening, widening, improvements and improvements to riding quality to government roads including construction of cd works, drain and up keeping the roads for a period of 60 months in valappady c&m sub division (package-12) the following works are involved in this package 1. widening from intermediate lane to two lane and improvements of puthiragoundampalayam - edapatty road (via) panamadal at km 5/0 - 6/6 (m669) including upkeeping for a period of 60 months (01-cridp-19-20-m-1287) 2. widening from intermediate lane to two lane and improvements of puthiragoundampalayam - edapatty road (via) panamadal at km 7/6 - 8/6 (m669) including upkeeping for a period of 60 months (01-cridp-19-20-m-1288) 3. improvements to riding quality at km 0/0 - 0/2, 0/6- 1/100 , 4/8 - 5/0 and 5/4 - 6/0 of valapady- thimmanaickenpatty road including construction of pipe culvert at km.0/2(md 530) including upkeeping for a period of 60 months (01-cridp-19-20-i-4469) 4. improvements to riding quality at km 6/8 - 7/4, 7/6- 8/0 and 8/8 - 9/2 of valapady- thimmanaickenpatty road including construction of pipe culvert at km.0/10 (i) and (ii)(md 530) including upkeeping for a period of 60 months (01-cridp-19-20-i-4470) 5. improvements to riding quality at km 0/0-1/0 of pagadupattu-moongilpattu road including upkeeping for a period of 60 months (01-cridp-19-20-i-4511) 6. strengthening of palaniapuri to road from km 32/8 of salem-ulundurpet road (via) thalavaipatty, thennampillaiyur, ariyapalayam, e.karadipatty, west rajapalayam and thamaiyanur road at km 9/8 - 10/8, 11/4 - 12/4, 14/0 - 14/6 and 16/6 - 17/0 including upkeeping for a period of 60 months (01-cridp-19-20-o-2587) 7. widening from intermediate lane to two lane and improvements of ayothiyapattinam-belur- kilakkadu road at km 51/0 - 52/4 including construction of drain at km.51/0-51/8 (md 1044) including upkeeping for a period of 60 months (01-cridp-19-20-m-1291)"
674 TN No 14 2019 20 HDO Dated 13 09 2019 Package 84 Dharapuram H Division
TRN : 677677 |  Tirupur - Tamil Nadu
Contract Value : 1.87 Crore | Agency Name : Highway Department
Tender award for tn no 14 2019 20 hdo dated 13 09 2019 package 84 dharapuram h division
675 TN No 14 2019 20 HDO Dated 13 09 2019 Package 83 Dharapuram H Division
TRN : 677678 |  Dharampuram - Tamil Nadu
Contract Value : 1.50 Crore | Agency Name : Highway Department
Tender award for tn no 14 2019 20 hdo dated 13 09 2019 package 83 dharapuram h division
676 Widening, Improvements and Improvements to Riding Quality to Government Roads including Construction and Reconstruction of CD works, Storm water Drain and Up keeping for a period of 60 months in Omalur (H) C&M Sub Division (Package-32) The Following works are involved in this package 1) Widening from Intermediate lane to Two lane and Improvements of Theevattipatty-Danispet- Boomidi Road at km 25/0- 26/450 (MD 851) including upkeeping for a period of 60 months 01-CRIDP -19-20-M-1319 2) Improvements to the Riding Quality at Km.12/2 -18/700 of Kamalapuram - Chinnathirupathi - Jodukuli road (MD1127) including upkeeping for a period of 60 months 01-CRIDP-19-20-I -4535 3) Construction of Drain at km 0/4- 0/8 & 1/6- 1/8 of Theevattipatty- Danispet- Boomidi Road (MD 851) 01-CRIDP-19-20-M-1321 4) Improvements to the Riding Quality at km 0/0-2/4 of Km.3/2 of Thinnapatty road to Koo.Kuttapatty road.including upkeeping for a period of 60 months 01-CRIDP-19-20-I-4545 5) Improvements to Riding Quality at km 5/0- 9/0 of Kamalapuram- Thinnapatty-Pannapatty road including upkeeping for a period of 60 months 01-CRIDP-19-20-I-4548 6) Construction of Drain at km. 14/0 - 14/6 of Kaligoundanur-Chinnathirupathy- Poosaripatty road including CD works 01-CRIDP-19-20-O-2636 7) Improvements of Poosaripatty road at km 0/0 - 0/6 including construction of storm water drain and CD Works including upkeeping for a period of 60 months 01-CRIDP-19-20-O-2623 8) Widening from single lane to Intermediate lane and Improvements of Nadupatty - Bommiampatty road at km.0/0- 3/0 including Widenig of Culverts including upkeeping for a period of 60 months 01-CRIDP-19-20-O-2613 9) Widening from single lane to intermediate lane and Improvements of Nadupatty - Bommiampatty road at km.5/0 - 5/8 including construction of storm water drain at km 0/2 and CD works including upkeeping for a period of 60 months 01-CRIDP-19-20-O-2612. 10) Improvements to Riding Quality at km 0/0 - 2/8 of K.N Pudhur - Sethapalayam road including upkeeping for a period of 60 months 01-CRIDP-19-20-I-4550"
TRN : 719191 |  Salem - Tamil Nadu
Contract Value : 8.98 Crore | Agency Name : Highway Department
Tender award for widening, improvements and improvements to riding quality to government roads including construction and reconstruction of cd works, storm water drain and up keeping for a period of 60 months in omalur (h) c&m sub division (package-32) the following works are involved in this package 1) widening from intermediate lane to two lane and improvements of theevattipatty-danispet- boomidi road at km 25/0- 26/450 (md 851) including upkeeping for a period of 60 months 01-cridp -19-20-m-1319 2) improvements to the riding quality at km.12/2 -18/700 of kamalapuram - chinnathirupathi - jodukuli road (md1127) including upkeeping for a period of 60 months 01-cridp-19-20-i -4535 3) construction of drain at km 0/4- 0/8 & 1/6- 1/8 of theevattipatty- danispet- boomidi road (md 851) 01-cridp-19-20-m-1321 4) improvements to the riding quality at km 0/0-2/4 of km.3/2 of thinnapatty road to koo.kuttapatty road.including upkeeping for a period of 60 months 01-cridp-19-20-i-4545 5) improvements to riding quality at km 5/0- 9/0 of kamalapuram- thinnapatty-pannapatty road including upkeeping for a period of 60 months 01-cridp-19-20-i-4548 6) construction of drain at km. 14/0 - 14/6 of kaligoundanur-chinnathirupathy- poosaripatty road including cd works 01-cridp-19-20-o-2636 7) improvements of poosaripatty road at km 0/0 - 0/6 including construction of storm water drain and cd works including upkeeping for a period of 60 months 01-cridp-19-20-o-2623 8) widening from single lane to intermediate lane and improvements of nadupatty - bommiampatty road at km.0/0- 3/0 including widenig of culverts including upkeeping for a period of 60 months 01-cridp-19-20-o-2613 9) widening from single lane to intermediate lane and improvements of nadupatty - bommiampatty road at km.5/0 - 5/8 including construction of storm water drain at km 0/2 and cd works including upkeeping for a period of 60 months 01-cridp-19-20-o-2612. 10) improvements to riding quality at km 0/0 - 2/8 of k.n pudhur - sethapalayam road including upkeeping for a period of 60 months 01-cridp-19-20-i-4550"
677 Widening and Improvements, Improvements to Riding Quality, Widening of Pipe culverts, Construction of Retaining Walls, Reconstruction of Slab culverts, and including Up Keeping for a period of 60 Months on Government Roads in Vellakovil (Highways), C&M, Sub Division. Package No.56 Road A :- Widening from Two lane to Three lane and Improvements of Vellakovil - Mulanur road (via) Akkaraipalayam road at km 0/0 - 0/8 including widening of pipe culvert at km 0/8 (SH -197) including upkeeping for a period of 60 months Road B :- Widening from Two lane to Three lane and Improvements of Vellakovil - Mulanur road (via) Akkaraipalayam road at km 0/8 - 1/300 including widening of pipe culvert at km 1/4 (SH -197) including upkeeping for a period of 60 months Road C :- Widening from Single lane to Intermediate lane and Improvements of Naatrayankovil - Chinnathipalayam - Moothampalayam road at km 3/6 - 5/100 , Improvements at km 5/100 - 7/250 including Reconstruction of slab culvert at km 4/2 & 4/8 and widening of pipe culvert at km 3/8,3/10 including upkeeping for a period of 60 months Road D :- Widening from Single lane to Intermediate lane and Improvements of Naal road - Moothampalayam road at km 0/0 - 1/0 including Construction of Retaining wall at km 0/8 & 0/10 and Reconstruction of slab culvert at km 0/10 including upkeeping for a period of 60 months Road E :- Improvements to Riding Quality at km 6/0 - 7/0 of Vellakovil - Mulanur road (via) Akkaraipalayam road (SH -197) including upkeeping for a period of 60 months Road F :- Improvements to Riding Quality at km 13/6 - 16/0 of Nathakadaiyur - Uthamapalayam road ( MD 886 ) including upkeeping for a period of 60 months Road G :- Improvements to Riding Quality at km 21/2 - 25/2 of Nathakadaiyur - Uthamapalayam road ( MD 886 ) including extra length of 180m at km 25/2 including upkeeping for a period of 60 months Road H :- Improvements to Riding Quality at km 0/0 - 2/0 of Muthur - Vellakovil road to Semalaigoundenvalasu road including upkeeping for a period of 60 months"
TRN : 716243 |  Tirupur - Tamil Nadu
Contract Value : 6.55 Crore | Agency Name : Highway Department
Tender award for widening and improvements, improvements to riding quality, widening of pipe culverts, construction of retaining walls, reconstruction of slab culverts, and including up keeping for a period of 60 months on government roads in vellakovil (highways), c&m, sub division. package no.56 road a :- widening from two lane to three lane and improvements of vellakovil - mulanur road (via) akkaraipalayam road at km 0/0 - 0/8 including widening of pipe culvert at km 0/8 (sh -197) including upkeeping for a period of 60 months road b :- widening from two lane to three lane and improvements of vellakovil - mulanur road (via) akkaraipalayam road at km 0/8 - 1/300 including widening of pipe culvert at km 1/4 (sh -197) including upkeeping for a period of 60 months road c :- widening from single lane to intermediate lane and improvements of naatrayankovil - chinnathipalayam - moothampalayam road at km 3/6 - 5/100 , improvements at km 5/100 - 7/250 including reconstruction of slab culvert at km 4/2 & 4/8 and widening of pipe culvert at km 3/8,3/10 including upkeeping for a period of 60 months road d :- widening from single lane to intermediate lane and improvements of naal road - moothampalayam road at km 0/0 - 1/0 including construction of retaining wall at km 0/8 & 0/10 and reconstruction of slab culvert at km 0/10 including upkeeping for a period of 60 months road e :- improvements to riding quality at km 6/0 - 7/0 of vellakovil - mulanur road (via) akkaraipalayam road (sh -197) including upkeeping for a period of 60 months road f :- improvements to riding quality at km 13/6 - 16/0 of nathakadaiyur - uthamapalayam road ( md 886 ) including upkeeping for a period of 60 months road g :- improvements to riding quality at km 21/2 - 25/2 of nathakadaiyur - uthamapalayam road ( md 886 ) including extra length of 180m at km 25/2 including upkeeping for a period of 60 months road h :- improvements to riding quality at km 0/0 - 2/0 of muthur - vellakovil road to semalaigoundenvalasu road including upkeeping for a period of 60 months"
678 Widening and Improvements, Construction of Drains and Widening of culverts on Governement Roads in Tirupur North (Highways), C&M, Sub Division. (Package No - 33) Road A :- Widening from Two lane to Three lane and Improvements of Tirupur - Somanur road at km 5/8 - 6/100 and 6/550 - 7/0, Improvements at km 6/100 - 6/550 (SH 169) including upkeeping for a period of 60 months Road B :- Widening from Two lane to Three lane and Improvements of Tirupur - Somanur road at km 7/0 - 8/0 incuding Construction of Box Culvert at Km 7/2 (SH 169) including upkeeping for a period of 60 months Road C :- Widening from Two lane to Three lane and Improvements of Tirupur - Somanur road at km 8/0 - 8/6, Improvements at km 8/6 - 8/8 and 8/850 - 9/0 incuding Construction of Box Culvert at Km 8/2 (SH 169) including upkeeping for a period of 60 months Road D :- Widening from Two lane to Three lane and Improvements of Tirupur - Somanur road at km 4/2 - 4/700 (SH 169) including upkeeping for a period of 60 months Road E :- Widening from Single lane to Intermediate lane and Improvements of Tirupur - Vijayamangalam road at Km 4/8 of Parapalayam at km 0/0 - 1/0, Improvements at km 1/0 - 2/2 including construction of retaining wall at Km 1/6,1/8 & 1/10 and Construction of RCC Drain at Km 0/2 including upkeeping for a period of 60 months Road F :- Improvements to Riding Quality at km 5/2 - 6/0 of Tiruppur - Vijayamangalam road (SH 19 A) including upkeeping for a period of 60 months Road G :- Improvements to Riding Quality at km 6/0 - 6/300, 10/550 - 10/665 and 11/180 - 11/350 of Tiruppur - Vijayamangalam road (SH 19 A)including upkeeping for a period of 60 months"
TRN : 676793 |  Tirupur - Tamil Nadu
Contract Value : 6.98 Crore | Agency Name : Highway Department
Tender award for widening and improvements, construction of drains and widening of culverts on governement roads in tirupur north (highways), c&m, sub division. (package no - 33) road a :- widening from two lane to three lane and improvements of tirupur - somanur road at km 5/8 - 6/100 and 6/550 - 7/0, improvements at km 6/100 - 6/550 (sh 169) including upkeeping for a period of 60 months road b :- widening from two lane to three lane and improvements of tirupur - somanur road at km 7/0 - 8/0 incuding construction of box culvert at km 7/2 (sh 169) including upkeeping for a period of 60 months road c :- widening from two lane to three lane and improvements of tirupur - somanur road at km 8/0 - 8/6, improvements at km 8/6 - 8/8 and 8/850 - 9/0 incuding construction of box culvert at km 8/2 (sh 169) including upkeeping for a period of 60 months road d :- widening from two lane to three lane and improvements of tirupur - somanur road at km 4/2 - 4/700 (sh 169) including upkeeping for a period of 60 months road e :- widening from single lane to intermediate lane and improvements of tirupur - vijayamangalam road at km 4/8 of parapalayam at km 0/0 - 1/0, improvements at km 1/0 - 2/2 including construction of retaining wall at km 1/6,1/8 & 1/10 and construction of rcc drain at km 0/2 including upkeeping for a period of 60 months road f :- improvements to riding quality at km 5/2 - 6/0 of tiruppur - vijayamangalam road (sh 19 a) including upkeeping for a period of 60 months road g :- improvements to riding quality at km 6/0 - 6/300, 10/550 - 10/665 and 11/180 - 11/350 of tiruppur - vijayamangalam road (sh 19 a)including upkeeping for a period of 60 months"
679 Improvements to Roads and Improvements to Riding Quality to Government Roads in Salem (H) C &M,Sub Division (Package-5) The Following works are involved in this package 1.Improvements of Jagir Ammapalayam - Tharamangalam road at km 4/0 - 5/2 (SH 219) including upkeeping for a period of 60 months (01-CRIDP-19-20-S-0343) 2.Improvements of Jagir Ammapalayam - Tharamangalam road at km 5/2 - 6/0 and 8/0 - 8/4 (SH 219) including upkeeping for a period of 60 months (01-CRIDP-19-20-S-0344) 3.Improvements of Jagir Ammapalayam - Tharamangalam road at km 8/4 - 9/0 and 11/0 - 11/500 (SH 219) including upkeeping for a period of 60 months (01-CRIDP-19-20-S-0345) 4.Improvements to Riding Quality at km 0/0 - 1/2 of Ammapet - Kumaragiri road including upkeeping for a period of 60 months (01-CRIDP-19-20-I-4490) 5,Improvements to Riding Quality at km 0/0 - 0/345 of Service road to the ROB at Km.0/8 of Salem - Omalur Main road near Government Hospital on Kalpana Theater side. (01-CRIDP-19-20-I-4507) 6,Improvements to Riding Quality at km 0/0 - 0/690 of Service road to the ROB at Km.0/8 of Salem - Omalur Main road near Government Hospital on Gandhi Stadium side including upkeeping for a period of 60 months. (01-CRIDP-19-20-I-4506) 7,Improvements to Riding Quality at km 0/0 - 0/240 of Service road to the ROB at Km.0/8 of Salem - Omalur Main road near Government Hospital on Ponni Super Market side including upkeeping for a period of 60 months. (01-CRIDP-19-20-I-4508) 8,Improvements to Riding Quality at km 0/0 - 0/285 of Service road to the ROB at Km.0/8 of Salem - Omalur Main road near Government Hospital on Hospital side including upkeeping for a period of 60 months. (01-CRIDP-19-20-I-4510) "
TRN : 719187 |  Salem - Tamil Nadu
Contract Value : 6.46 Crore | Agency Name : Highway Department
Tender award for improvements to roads and improvements to riding quality to government roads in salem (h) c &m,sub division (package-5) the following works are involved in this package 1.improvements of jagir ammapalayam - tharamangalam road at km 4/0 - 5/2 (sh 219) including upkeeping for a period of 60 months (01-cridp-19-20-s-0343) 2.improvements of jagir ammapalayam - tharamangalam road at km 5/2 - 6/0 and 8/0 - 8/4 (sh 219) including upkeeping for a period of 60 months (01-cridp-19-20-s-0344) 3.improvements of jagir ammapalayam - tharamangalam road at km 8/4 - 9/0 and 11/0 - 11/500 (sh 219) including upkeeping for a period of 60 months (01-cridp-19-20-s-0345) 4.improvements to riding quality at km 0/0 - 1/2 of ammapet - kumaragiri road including upkeeping for a period of 60 months (01-cridp-19-20-i-4490) 5,improvements to riding quality at km 0/0 - 0/345 of service road to the rob at km.0/8 of salem - omalur main road near government hospital on kalpana theater side. (01-cridp-19-20-i-4507) 6,improvements to riding quality at km 0/0 - 0/690 of service road to the rob at km.0/8 of salem - omalur main road near government hospital on gandhi stadium side including upkeeping for a period of 60 months. (01-cridp-19-20-i-4506) 7,improvements to riding quality at km 0/0 - 0/240 of service road to the rob at km.0/8 of salem - omalur main road near government hospital on ponni super market side including upkeeping for a period of 60 months. (01-cridp-19-20-i-4508) 8,improvements to riding quality at km 0/0 - 0/285 of service road to the rob at km.0/8 of salem - omalur main road near government hospital on hospital side including upkeeping for a period of 60 months. (01-cridp-19-20-i-4510) "
680 Widening and Improvements, Improvements, Improvements to Riding Quality, Construction of well protective walls, Construction of Retaining Walls, construction of box culverts, Reconstruction of Box culverts, Curve Widening and including Up Keeping for a period of 60 Months on Government Roads in Mulanur (Highways), C&M, Sub Division. Package No.55 Road A :- Widening from Two lane to Three lane and Improvements of Pollachi - Dharapuram - Karur road at Km 82/2-83/2 including Construction of Well protective wall at km 82/6 (SH 21) including upkeeping for a period of 60 months Road B :- Widening from Two lane to Three lane and Improvements of Pollachi - Dharapuram - Karur road at Km 83/2-84/2 including Reconstruction of Box culvert at Km 84/2, Construction of Well protective wall at Km 83/10 (SH 21) including upkeeping for a period of 60 months Road C :- Improvements of Pollachi - Dharapuram - Karur road at Km 56/4-57/2 including Construction of Retaining wall at Km 56/6 (SH 21) including upkeeping for a period of 60 months Road D :- Improvements of Muthur - Mulanur road to Vanjivalasu (via) Sunnampukattuvalasu at Km 0/0-4/150 including Construction of box culvert at Km 1/6, construction of Retaining Wall at Km 1/8 including upkeeping for a period of 60 months Road E :- Improvements of Pommipalayam pirivu - Nalukalkuttai road at Km 0/0-2/8 including Reconstruction of box culvert at Km 0/8 (Using plastic waste) including upkeeping for a period of 60 months Road F :- Widening from Single lane to Intermediate lane and Improvements of Muthugoundenvalasu pirivu - Muthur, Mulanur road (via) Thalakkarai at Km 0/0-1/0 including upkeeping for a period of 60 months Road G :- Improvements of Anuppapatti - Valaikarainvalasu road (via) Vadugapatti at Km 0/0-3/0 including Reconstruction of box culvert at Km 2/8, Curve Widening at Km 0/10, construction of Retaining Wall at Km 1/2 including upkeeping for a period of 60 months Road H :- Improvements to Riding Quality at Km 0/0-1/4 of Pattuthurai - Thulukkavalasu road including upkeeping for a period of 60 months"
TRN : 716245 |  Tirupur - Tamil Nadu
Contract Value : 6.08 Crore | Agency Name : Highway Department
Tender award for widening and improvements, improvements, improvements to riding quality, construction of well protective walls, construction of retaining walls, construction of box culverts, reconstruction of box culverts, curve widening and including up keeping for a period of 60 months on government roads in mulanur (highways), c&m, sub division. package no.55 road a :- widening from two lane to three lane and improvements of pollachi - dharapuram - karur road at km 82/2-83/2 including construction of well protective wall at km 82/6 (sh 21) including upkeeping for a period of 60 months road b :- widening from two lane to three lane and improvements of pollachi - dharapuram - karur road at km 83/2-84/2 including reconstruction of box culvert at km 84/2, construction of well protective wall at km 83/10 (sh 21) including upkeeping for a period of 60 months road c :- improvements of pollachi - dharapuram - karur road at km 56/4-57/2 including construction of retaining wall at km 56/6 (sh 21) including upkeeping for a period of 60 months road d :- improvements of muthur - mulanur road to vanjivalasu (via) sunnampukattuvalasu at km 0/0-4/150 including construction of box culvert at km 1/6, construction of retaining wall at km 1/8 including upkeeping for a period of 60 months road e :- improvements of pommipalayam pirivu - nalukalkuttai road at km 0/0-2/8 including reconstruction of box culvert at km 0/8 (using plastic waste) including upkeeping for a period of 60 months road f :- widening from single lane to intermediate lane and improvements of muthugoundenvalasu pirivu - muthur, mulanur road (via) thalakkarai at km 0/0-1/0 including upkeeping for a period of 60 months road g :- improvements of anuppapatti - valaikarainvalasu road (via) vadugapatti at km 0/0-3/0 including reconstruction of box culvert at km 2/8, curve widening at km 0/10, construction of retaining wall at km 1/2 including upkeeping for a period of 60 months road h :- improvements to riding quality at km 0/0-1/4 of pattuthurai - thulukkavalasu road including upkeeping for a period of 60 months"