You have searched for highway-department in Awarded Tender Result. Click on any tender to view further details.
691Widening, Improvements and Improvements to Riding Quality to Government Roads including Construction and Reconstruction of CD works, Storm water Drain and Up keeping for a period of 60 months in Omalur (H) C&M Sub Division (Package-32)
The Following works are involved in this package
1) Widening from Intermediate lane to Two lane and Improvements of Theevattipatty-Danispet- Boomidi Road at km 25/0- 26/450 (MD 851) including upkeeping for a period of 60 months 01-CRIDP -19-20-M-1319
2) Improvements to the Riding Quality at Km.12/2 -18/700 of Kamalapuram - Chinnathirupathi - Jodukuli road (MD1127) including upkeeping for a period of 60 months 01-CRIDP-19-20-I -4535
3) Construction of Drain at km 0/4- 0/8 & 1/6- 1/8 of Theevattipatty- Danispet- Boomidi Road (MD 851) 01-CRIDP-19-20-M-1321
4) Improvements to the Riding Quality at km 0/0-2/4 of Km.3/2 of Thinnapatty road to Koo.Kuttapatty road.including upkeeping for a period of 60 months 01-CRIDP-19-20-I-4545
5) Improvements to Riding Quality at km 5/0- 9/0 of Kamalapuram- Thinnapatty-Pannapatty road including upkeeping for a period of 60 months 01-CRIDP-19-20-I-4548
6) Construction of Drain at km. 14/0 - 14/6 of Kaligoundanur-Chinnathirupathy- Poosaripatty road including CD works 01-CRIDP-19-20-O-2636 7) Improvements of Poosaripatty road at km 0/0 - 0/6 including construction of storm water drain and CD Works including upkeeping for a period of 60 months 01-CRIDP-19-20-O-2623 8) Widening from single lane to Intermediate lane and Improvements of Nadupatty - Bommiampatty road at km.0/0- 3/0 including Widenig of Culverts including upkeeping for a period of 60 months 01-CRIDP-19-20-O-2613 9) Widening from single lane to intermediate lane and Improvements of Nadupatty - Bommiampatty road at km.5/0 - 5/8 including construction of storm water drain at km 0/2 and CD works including upkeeping for a period of 60 months 01-CRIDP-19-20-O-2612. 10) Improvements to Riding Quality at km 0/0 - 2/8 of K.N Pudhur - Sethapalayam road including upkeeping for a period of 60 months 01-CRIDP-19-20-I-4550"
TRN :
720189
|
Salem - Tamil Nadu
Contract Value :
8.98 Crore |Agency Name :
Highway Department
692Widening and Improvements, Improvements to Riding Quality, Rebuilding, Providing Centre median, Construction of Protective walls, Widening of culverts and including Up Keeping for a period of 60 Months on Government Roads in Madathukulam (Highways), C&M, Sub Division. Package No.63 Road A :- Improvements to Riding Quality at km 10/6 - 12/2 of Karatholuvu - Komaralingam road (MD - 149) including upkeeping for a period of 60 months
Road B :- Widening the curve at km 18/4 - 18/8 of Udumalaipet - Komaralingam road includingwidening of culvert at km 18/8,Providing center median at km 18/450 - 18/750, Construction of protective wall at km 18/6 & 18/8 including extra length of 35m at km 18/8 (MD 510)
Road C :- Improvements to riding quality at km 0/0 - 1/8 of Elayamuthur - Myvadi road including upkeeping for a period of 60 months
Road D :- Improvements to Riding Quality at km 0/6 - 1/4, 8/0 - 9/0 & 9/6 - 11/775 of Kolumam - Kallapuram road including upkeeping for a period of 60 months
Road E :- Rebuilding of Amaravathi sugar mill to Kongalakurichi road at km 5/6 - 6/0 including upkeeping for a period of 60 months
Road F :- Widening from Single lane to Intermediate lane and improvements of Udumalpet - Elayamuthur road at km 1/0 - 2/2 including upkeeping for a period of 60 months
Road G :- Improvements to Riding Quality at km 3/0 - 4/007 of The road branching at Km 16/4 of N.G.Pudur - Vayalur road (via) Mylapuram road including upkeeping for a period of 60 months
Road H :- Improvements to Riding Quality at km 3/0 - 5/6 of Amaravathi sugar mill to Kongalakurichi road including upkeeping for a period of 60 months
Road I :- Improvements to Riding Quality at km 0/0 -1/660 of The road branching at Km 83/2 of Dindugal - Bangalore road to Myvadi including upkeeping for a period of 60 months
Road J :- Improvements to Riding Quality at 0/0 - 1/2 Perisanampatti - Kiluvankattur road including upkeeping for a period of 60 months
Road K :- Improvements to Riding Quality at 0/0 - 1/6 Neelambur - Amaravathi sugarmill road including upkeeping for a period of 60 months"
TRN :
716233
|
Tirupur - Tamil Nadu
Contract Value :
6.20 Crore |Agency Name :
Highway Department
693Improvements to Roads and Improvements to Riding Quality to Government Roads in Salem (H) C &M,Sub Division (Package-5)
The Following works are involved in this package
1.Improvements of Jagir Ammapalayam - Tharamangalam road at km 4/0 - 5/2 (SH 219) including upkeeping for a period of 60 months (01-CRIDP-19-20-S-0343)
2.Improvements of Jagir Ammapalayam - Tharamangalam road at km 5/2 - 6/0 and 8/0 - 8/4 (SH 219) including upkeeping for a period of 60 months (01-CRIDP-19-20-S-0344)
3.Improvements of Jagir Ammapalayam - Tharamangalam road at km 8/4 - 9/0 and 11/0 - 11/500 (SH 219) including upkeeping for a period of 60 months (01-CRIDP-19-20-S-0345)
4.Improvements to Riding Quality at km 0/0 - 1/2 of Ammapet - Kumaragiri road including upkeeping for a period of 60 months (01-CRIDP-19-20-I-4490)
5,Improvements to Riding Quality at km 0/0 - 0/345 of Service road to the ROB at Km.0/8 of Salem - Omalur Main road near Government Hospital on Kalpana Theater side. (01-CRIDP-19-20-I-4507) 6,Improvements to Riding Quality at km 0/0 - 0/690 of Service road to the ROB at Km.0/8 of Salem - Omalur Main road near Government Hospital on Gandhi Stadium side including upkeeping for a period of 60 months. (01-CRIDP-19-20-I-4506) 7,Improvements to Riding Quality at km 0/0 - 0/240 of Service road to the ROB at Km.0/8 of Salem - Omalur Main road near Government Hospital on Ponni Super Market side including upkeeping for a period of 60 months. (01-CRIDP-19-20-I-4508) 8,Improvements to Riding Quality at km 0/0 - 0/285 of Service road to the ROB at Km.0/8 of Salem - Omalur Main road near Government Hospital on Hospital side including upkeeping for a period of 60 months. (01-CRIDP-19-20-I-4510) "
TRN :
720180
|
Salem - Tamil Nadu
Contract Value :
6.46 Crore |Agency Name :
Highway Department
694Widening and Improvements, Improvements, Rebuilding, Widening of culverts, Construction of Drain, Construction of load bearing drain and including Up Keeping for a period of 60 Months on Government Roads in Madathukulam (Highways), C&M, Sub Division. Package No.62 Road A :- Widening from three lane to four lane and rebuilding of Udumalpet - Dharapuram road at km 0/0 - 0/373 & 0/414 - 0/500 (SH 97) including upkeeping for a period of 60 months
Road B :- Widening from three lane to four lane and rebuilding of Udumalpet - Dharapuram road at km 0/500-1/0 (SH 97) including widening of culvert at km 0/6 including upkeeping for a period of 60 months
Road C :- Widening from three lane to four lane and improvements of Udumalpet - Dharapuram road at km 1/2 - 2/0 (SH 97) including upkeeping for a period of 60 months
Road D :- Construction of Drain at km 0/0 - 0/248 (LS) & 1/080 - 1/580 (RS) of Udumalpet - Dharapuram road including construction of load bearing drain at km 0/2 (LS) , Km 1/2 (RS) & 1/6 (RS) (SH 97)
Road E :- Improvements to km 0/0 - 1/0 of Udumalpet - Elayamuthur road including upkeeping for a period of 60 months"
TRN :
716234
|
Tirupur - Tamil Nadu
Contract Value :
6.09 Crore |Agency Name :
Highway Department
695Improvements and Improvements to Riding Quality to Government Roads including Construction of Drain, Retaining Wall, Box Culvert and up keeping the roads for a period of 60 months in Salem C&M Sub Division (Package-3)
The Following works are involved in this package
1.Improvements of Omalur Main road in Salem at km 0/0 - 1/2 (SH 218) including upkeeping for a period of 60 months (01-CRIDP-19-20-S-0340). 2,Improvements of Varanasi - Kanyakumari Road (Abandoned NH7) at km 204/0 - 204/8 (SH 80) including upkeeping for a period of 60 months.
(01-CRIDP-19-20-S-0341).
3,Improvements of Varanasi - Kanyakumari Road (Abandoned NH7) at km 203/4 - 204/0 including Construction of Drain at Km.203/4-203/10 of Varanasi Kanyakumari road (Abandoned NH-7)(SH 80) including upkeeping for a period of 60 months (01-CRIDP-19-20-S-0342). 4,Improvements to Riding Quality at km 2/0 - 3/4 and 5/6 - 6/0 of Shevapet-Elampillai Road (MD 421) including upkeeping for a period of 60 months (01-CRIDP-19-20-I-4468).
5,Improvements to Riding Quality at km 0/0 - 0/8, 1/6 - 2/4, 3/6 - 5/2 and 7/8 - 8/279 of Suramangalam - Sivathapuram - Neikarapatty road including upkeeping for a period of 60 months (01-CRIDP-19-20-I-4505). 6,Improvements of Pension line road at km 0/0 - 0/930 including construction of Box culvert , Drain and Retaining wall(MD 655) including upkeeping for a period of 60 months (01-CRIDP-19-20-M-1305)."
TRN :
720165
|
Salem - Tamil Nadu
Contract Value :
7.48 Crore |Agency Name :
Highway Department
696Improvements to Riding Quality, and including Up Keeping for a period of 60 Months on Government Roads in Dharapuram & Mulanur (Highways), C&M, Sub Division. Package No.66 Road A :- Improvements to Riding quality at km 1/0 -3/4 & 4/4 -4/8 of Dharapuram - Poolavadi road (MD 884) including upkeeping for a period of 60 months
Road B :- Improvements to Riding quality at km 1/0 -3/8 of Suriyanallur - Velappampalayam road including upkeeping for a period of 60 months.
Road C :- Improvements to Riding quality at km 4/8 - 8/2 of The road from Kallipalayam to join at km 20/8 of Dharapuram - Pollachi, including upkeeping for a period of 60 months
Road D :- Improvements to Riding quality at km2/4 - 4/0 & 5/0 - 6/2 of Kundadam - Ponnapuram road including upkeeping for a period of 60 months
Road E :- Improvements to Riding Quality at Km 0/0-2/0 of Malamedu - Velampoondi road including upkeeping for a period of 60 months
Road F :- Improvements to Riding Quality at Km 7/0-11/0 of Akkaraipalayam - Karaiyur road (MD 989) including upkeeping for a period of 60 months
Road G :- Improvements to Riding Quality at Km 0/0-2/6 of Karur - Dharapuram road to Salaripatty road including upkeeping for a period of 60 months
Road H :- Improvements to Riding Quality at Km 0/0-5/4 of Salakkadai - Eulugamvalasu road including upkeeping for a period of 60 months
Road I :- Improvements to Riding Quality at Km 9/0-12/6 of The road branching at Km 53/8 of Udumalpet - Chinnadharapuram road to District limit road (via) Chinnakkampatty, Ponnivady including upkeeping for a period of 60 months
TRN :
716235
|
Tirupur - Tamil Nadu
Contract Value :
5.53 Crore |Agency Name :
Highway Department
697Improvements and Improvements to Riding Quality to Government Roads including Construction and Reconstruction of Box Culvert,Drain and Up keeping for a period of 60 months in Edappady (H) C&M Sub Division (Package-23)
The Following works are involved in this package
1.Construction of Drain at km 8/0-8/4 of Magudanchavadi - Komarapalayam road (via) Edappady including CD works(SH 221) (01-CRIDP-19-20-S-0389)
2. Improvements to Riding Quality at km 18/8 -19/2 and 19/4 - 20/0 of Magudanchavadi -Komarapalayam road (via) Edappady (SH 221)including Upkeeping for a period of 60 months (01-CRIDP-19-20-I-4521)
3. Improvements to Riding Quality at km 20/0 -22/2 of Magudanchavadi - Komarapalayam road(via) Edappady (SH 221) including Upkeeping for a period of 60 months (01-CRIDP-19-20-I-4522)
4. Raising the dip at km 19/4 of Magudanchavadi -Komarapalayam road (via) Edappady including Construction of Box culvert (SH 221) including Upkeeping for a period of 60 months (01-CRIDP-19-20-S-0386)
5. Improvements of Magudanchavadi - Komarapalayam road (via) Edappady at km 14/2- 15/2 & 16/4-16/6 including easing the approaches at Km 14/8 & 14/10 (SH 221) including Upkeeping for a period of 60 months (01-CRIDP-19-20-S-0380)
6. Improvements of Magudanchavadi - Komarapalayam road (via) Edappady at km 16/6 - 17/8 including easing the Edappady Bus stand approaches(SH 221) including Upkeeping for a period of 60 months (01-CRIDP-19-20-S-0381)
7. Improvements to Riding Quality at km 12/2 - 14/2 of Magudanchavadi - Komarapalayam road (via) Edappady (SH 221) including Upkeeping for a period of 60 months(01-CRIDP-19-20-I-4530)
8. Reconstruction of Box culvert at km 13/2 of Magudanchavadi - Komarapalayam road (via) Edappady (SH 221) including Upkeeping for a period of 60 months (01-CRIDP-19-20-S-0398)"
TRN :
720172
|
Salem - Tamil Nadu
Contract Value :
6.56 Crore |Agency Name :
Highway Department
698Widening and Improvements, Improvements to Riding Quality, Widening the Curve, Construction of Box Culverts, Construction of Retaining Walls, Reconstruction of culverts, Widening of RCC slab culverts, and including Up Keeping for a period of 60 Months on Government Roads in Udumalpet (Highways), C&M, Sub Division. Package No.61 Road A :- Widening from Intermediate lane to Two lane and Improvements of km 15/6 of Udumalpet-Chinnar road - Amaravathi nagar road km 15/6 at km 2/4 - 4/0 (MD 167) including up keeping for a period of 60 months.
Road B :- Improvements of Riding Quality at km 5/0 - 5/2 and 7/8 - 12/0 of Udumalpet - Chinnar road (MD 509) including up keeping for a period of 60 months.
Road C :- Widening the curve at km 10/2 of Udumalpet - Chinnar road and including Construction of Retaining wall at km 10/2 (MD 509)
Road D :- Widening from Single lane to Intermediate lane and Improvements of Periyapatti - Negamam road (via) Ammapatti at km 12/0 - 13/6 and including Reconstruction of culvert at km 12/2 &12/6 including up keeping for a period of 60 months.
Road E :- Widening from Single lane to Intermediate lane and Improvements of Periyapatti - Negamam road (via) Amanthakadavu at km 8/3 - 9/0 including up keeping for a period of 60 months.
Road F :- Improvements to Riding Quality at km 0/0 - 3/0 of The road branching at km 5/6 of Udumalpet-Senjerihills road to Pottayampalayam including up keeping for a period of 60 months.
Road G :- Construction of box culvert at km 0/8 & 2/2 of Negamam-Erisanampatti road branching at Km 26/8 of Anaimalai - Poolankinar road (Via) Vilamarathupatti.
Road H :- Widening RCC Slab Culvert across PAP canal at km 0/10 of The road branching at km 5/6 of Udumalpet-Senjerihills road to Pottayampalayam and Construction of retaining wall at km 2/6 & 2/8"
TRN :
716236
|
Tirupur - Tamil Nadu
Contract Value :
5.92 Crore |Agency Name :
Highway Department
699Widening, Improvements to Government Roads including Junction Improvements, Construction of CD works, Drain and Retaining wall and Up keeping for a period of 60 months in Edappady (H) C&M Sub Division (Package-22)
The Following works are involved in this package
1. Improvements of Edappady - Poolampatty - Mettur road at km 10/8-12/0 including widening of curves with junction improvements in the Town and Providing hard shoulders (SH 220A) Including Upkeeping for a period of 60 months (01-CRIDP-19-20-S-0375)
2.Widening from Intermediate lane to Two lane and Improvements of Edappady - Poolampatty - Mettur road at km 12/0-12/935 including construction of CD works and storm water drain (SH 220A) Including Upkeeping for a period of 60 months (01-CRIDP-19-20-S-0359)
3.Construction of drain at km 10/8-11/430 & 11/6-12/0 of Edappady - Poolampatty - Mettur road including Retaining wall and CD works (SH 220A) Including Upkeeping for a period of 60 months (01-CRIDP-19-20-S-0392)
4.Construction of Retaining wall at km 12/0-12/935 of Edappady - Poolampatty - Mettur road (SH 220A) Including Upkeeping for a period of 60 months (01-CRIDP-19-20-S-0393)
5.Junction Improvements at km 6/8 including construction of drain from km 6/6-6/8 of Chittur - Poolampatti Road Including Upkeeping for a period of 60 months (01-CRIDP-19-20-O-2629) "
TRN :
720174
|
Salem - Tamil Nadu
Contract Value :
6.80 Crore |Agency Name :
Highway Department
700Widening and Improvements, Improvements to Riding Quality, Widening of Box Culverts, Construction of Retaining Walls and including Up Keeping for a period of 60 Months on Government Roads in Udumalpet (Highways), C&M, Sub Division. Package No.60 Road A :- Widening from Intermediate lane to Two lane and Improvements of Udumalpet - Thirumoorthy salai at km 7/0 - 8/2 Construction of retainingwall at km 7/6 ,7/8 & 8/2 (MD 512) including up keeping for a period of 60 months.
Road B :- Widening from Intermediate lane to Two lane and Improvements of Udumalpet - Thirumoorthy salai at km 8/2 - 8/8 Construction of retainingwall at km 8/4 (MD 512) including up keeping for a period of 60 months.
Road C :- Widening from Intermediate lane to Two lane and Improvements of Udumalpet - Thirumoorthy salai at km 14/4 - 15/8 Construction of retainingwall at km 15/8 (MD 512) including up keeping for a period of 60 months.
Road D :- Improvements to Riding Quality at km 0/0 - 1/0 and 6/2 - 6/6 of Sungaramudakku - Ammapatti road including up keeping for a period of 60 months.
Road E :- Improvements to Riding Quality at km 3/0 - 4/4 of The road branching at Km 5/6 of Udumalpet-Senjerihills road to Pottayampalayam including up keeping for a period of 60 months.
Road F :- Improvements to Riding Quality at km 3/4 - 4/8 of Ragalbavi Village road including up keeping for a period of 60 months.
Road G :- Improvements to Riding Quality at km 1/0 - 2/0 of Ravanapuram Village road including up keeping for a period of 60 months.
Road H :- Improvements to Riding Quality at km 1/0 - 1/8 of The road branching at Km 13/4 of Udumalpet-Senjerihills road to Alamarathur including up keeping for a period of 60 months.
Road I :- Improvements to Riding Quality at km 0/0 - 1/0 and 2/0 - 5/6 of km 8/8 of Udumalpet-Senjeri hills road to Kottamangalam road (Using Plastic Waste) including up keeping for a period of 60 months.
Road J :- Widening of Box Culvert at km 29/10 of Erisanampatti - Dhali road and Construction of Retaining wall
Road K :- Construction of Retaining Wall at Km 5/0-5/5 of Modakkupatti - Thirumoorthi Nagar road (Palar River Bed)"
TRN :
716238
|
Tirupur - Tamil Nadu
Contract Value :
6.01 Crore |Agency Name :
Highway Department