691 Widening and Improvements, Improvements, Improvements to Riding Quality, widening of Pipe culverts Construction of Protective walls, Construction of Retaining Walls, Widening the curve and including Up Keeping for a period of 60 Months on Government Roads in Vellakovil (Highways), C&M, Sub Division. Package No.58 Road A :- Widening from Two lane to Three lane and Improvements of Erode - Mulanur road (via) Muthur, Vellakovil and Puthuppai at km 37/0 - 38/0 (SH 84 A) including upkeeping for a period of 60 months Road B :- Widening from Two lane to Three lane and Improvements of Erode - Mulanur road (via) Muthur, Vellakovil and Puthuppai at km 54/2 - 54/8 including Construction of Retaining wall at km 54/4 (SH 84 A) including upkeeping for a period of 60 months Road C :- Widening the Curve at km 54/8 - 55/6 of Erode - Mulanur road (via) Muthur, Vellakovil and Puthuppai including Construction of Protective wall at km 54/10, 55/2 and widening of pipe culvert at km 54/10, 55/4 (SH 84 A) Road D :- Improvements of Vellakovil - Veppampalayam - Noyyal road at km 2/4 - 3/0 and 4/2 - 7/0 including upkeeping for a period of 60 months Road E :- Construction Retaining wall at km 17/4 of Mullipuram - Bhagavathipalayam - Silambagoundanvalasu road Road F :- Improvements to Riding Quality at km 0/0 - 1/650 of Muthur - Vellakovil road to Periyakangayampalayam road including upkeeping for a period of 60 months Road G :- Improvements to Riding Quality at km 0/0 - 2/2 of Rangapayaankaadu - Salaithottampudur road including branch road up to pudhupalayam including upkeeping for a period of 60 months"
TRN : 716241 |  Tirupur - Tamil Nadu
Contract Value : 6.03 Crore | Agency Name : Highway Department
Tender award for widening and improvements, improvements, improvements to riding quality, widening of pipe culverts construction of protective walls, construction of retaining walls, widening the curve and including up keeping for a period of 60 months on government roads in vellakovil (highways), c&m, sub division. package no.58 road a :- widening from two lane to three lane and improvements of erode - mulanur road (via) muthur, vellakovil and puthuppai at km 37/0 - 38/0 (sh 84 a) including upkeeping for a period of 60 months road b :- widening from two lane to three lane and improvements of erode - mulanur road (via) muthur, vellakovil and puthuppai at km 54/2 - 54/8 including construction of retaining wall at km 54/4 (sh 84 a) including upkeeping for a period of 60 months road c :- widening the curve at km 54/8 - 55/6 of erode - mulanur road (via) muthur, vellakovil and puthuppai including construction of protective wall at km 54/10, 55/2 and widening of pipe culvert at km 54/10, 55/4 (sh 84 a) road d :- improvements of vellakovil - veppampalayam - noyyal road at km 2/4 - 3/0 and 4/2 - 7/0 including upkeeping for a period of 60 months road e :- construction retaining wall at km 17/4 of mullipuram - bhagavathipalayam - silambagoundanvalasu road road f :- improvements to riding quality at km 0/0 - 1/650 of muthur - vellakovil road to periyakangayampalayam road including upkeeping for a period of 60 months road g :- improvements to riding quality at km 0/0 - 2/2 of rangapayaankaadu - salaithottampudur road including branch road up to pudhupalayam including upkeeping for a period of 60 months"
692 Widening, Improvements and Improvements to Riding Quality to Government Roads including Construction and Reconstruction of CD works, Storm water Drain and Up keeping for a period of 60 months in Omalur (H) C&M Sub Division (Package-32) The Following works are involved in this package 1) Widening from Intermediate lane to Two lane and Improvements of Theevattipatty-Danispet- Boomidi Road at km 25/0- 26/450 (MD 851) including upkeeping for a period of 60 months 01-CRIDP -19-20-M-1319 2) Improvements to the Riding Quality at Km.12/2 -18/700 of Kamalapuram - Chinnathirupathi - Jodukuli road (MD1127) including upkeeping for a period of 60 months 01-CRIDP-19-20-I -4535 3) Construction of Drain at km 0/4- 0/8 & 1/6- 1/8 of Theevattipatty- Danispet- Boomidi Road (MD 851) 01-CRIDP-19-20-M-1321 4) Improvements to the Riding Quality at km 0/0-2/4 of Km.3/2 of Thinnapatty road to Koo.Kuttapatty road.including upkeeping for a period of 60 months 01-CRIDP-19-20-I-4545 5) Improvements to Riding Quality at km 5/0- 9/0 of Kamalapuram- Thinnapatty-Pannapatty road including upkeeping for a period of 60 months 01-CRIDP-19-20-I-4548 6) Construction of Drain at km. 14/0 - 14/6 of Kaligoundanur-Chinnathirupathy- Poosaripatty road including CD works 01-CRIDP-19-20-O-2636 7) Improvements of Poosaripatty road at km 0/0 - 0/6 including construction of storm water drain and CD Works including upkeeping for a period of 60 months 01-CRIDP-19-20-O-2623 8) Widening from single lane to Intermediate lane and Improvements of Nadupatty - Bommiampatty road at km.0/0- 3/0 including Widenig of Culverts including upkeeping for a period of 60 months 01-CRIDP-19-20-O-2613 9) Widening from single lane to intermediate lane and Improvements of Nadupatty - Bommiampatty road at km.5/0 - 5/8 including construction of storm water drain at km 0/2 and CD works including upkeeping for a period of 60 months 01-CRIDP-19-20-O-2612. 10) Improvements to Riding Quality at km 0/0 - 2/8 of K.N Pudhur - Sethapalayam road including upkeeping for a period of 60 months 01-CRIDP-19-20-I-4550"
TRN : 719191 |  Salem - Tamil Nadu
Contract Value : 8.98 Crore | Agency Name : Highway Department
Tender award for widening, improvements and improvements to riding quality to government roads including construction and reconstruction of cd works, storm water drain and up keeping for a period of 60 months in omalur (h) c&m sub division (package-32) the following works are involved in this package 1) widening from intermediate lane to two lane and improvements of theevattipatty-danispet- boomidi road at km 25/0- 26/450 (md 851) including upkeeping for a period of 60 months 01-cridp -19-20-m-1319 2) improvements to the riding quality at km.12/2 -18/700 of kamalapuram - chinnathirupathi - jodukuli road (md1127) including upkeeping for a period of 60 months 01-cridp-19-20-i -4535 3) construction of drain at km 0/4- 0/8 & 1/6- 1/8 of theevattipatty- danispet- boomidi road (md 851) 01-cridp-19-20-m-1321 4) improvements to the riding quality at km 0/0-2/4 of km.3/2 of thinnapatty road to koo.kuttapatty road.including upkeeping for a period of 60 months 01-cridp-19-20-i-4545 5) improvements to riding quality at km 5/0- 9/0 of kamalapuram- thinnapatty-pannapatty road including upkeeping for a period of 60 months 01-cridp-19-20-i-4548 6) construction of drain at km. 14/0 - 14/6 of kaligoundanur-chinnathirupathy- poosaripatty road including cd works 01-cridp-19-20-o-2636 7) improvements of poosaripatty road at km 0/0 - 0/6 including construction of storm water drain and cd works including upkeeping for a period of 60 months 01-cridp-19-20-o-2623 8) widening from single lane to intermediate lane and improvements of nadupatty - bommiampatty road at km.0/0- 3/0 including widenig of culverts including upkeeping for a period of 60 months 01-cridp-19-20-o-2613 9) widening from single lane to intermediate lane and improvements of nadupatty - bommiampatty road at km.5/0 - 5/8 including construction of storm water drain at km 0/2 and cd works including upkeeping for a period of 60 months 01-cridp-19-20-o-2612. 10) improvements to riding quality at km 0/0 - 2/8 of k.n pudhur - sethapalayam road including upkeeping for a period of 60 months 01-cridp-19-20-i-4550"
693 Widening and Improvements, Improvements, Improvements to Riding Quality, Widening of Pipe Culverts, Reconstruction of Slab Culverts and including Up Keeping for a period of 60 Months on Government Roads in Vellakovil (Highways), C&M, Sub Division. Package No.57 Road A :- Widening from Two lane to Three lane and Improvements of Erode - Mulanur road (via) Muthur, Vellakovil and Puthuppai at km 42/0 - 42/500 (SH 84 A) including upkeeping for a period of 60 months Road B :- Improvements of Erode - Mulanur road (via) Muthur, Vellakovil and Puthuppai at km 42/500 - 43/6 (SH 84 A) including upkeeping for a period of 60 months Road C :- Widening from Single lane to Intermediate lane and Improvements of Parakadai - Punjaithalayur road (via) Manalur road at km 0/0 - 1/0 including Reconstruction of slab culvert at km 0/8 and widening of pipe culvert at Km 0/10 including upkeeping for a period of 60 months Road D :- Improvements of Parakadai - Punjaithalayur road (via) Manalur road at km 14/2 - 16/2 and 16/6 - 21/450 including upkeeping for a period of 60 months Road E :- Improvements of Ponparapi - Kambaliampatty road at km 7/0 - 10/8 ( Using Plastic Waste ) including upkeeping for a period of 60 months Road F :- Improvements to Riding Quality at km 8/0 - 11/300 of Uthiyur - Dasanaickenpatty (MD 993) including upkeeping for a period of 60 months Road G :- Improvements to Riding Quality at km 11/700 - 14/0 of Uthiyur - Dasanaickenpatty (MD 993) including upkeeping for a period of 60 months Road H :- Improvements to Riding Quality at km 0/0 - 3/6 and 6/6 - 7/0 of Nagapattinam - Gudalur - Mysore road to Ganapathipalayam road including upkeeping for a period of 60 months"
TRN : 716242 |  Tirupur - Tamil Nadu
Contract Value : 6.46 Crore | Agency Name : Highway Department
Tender award for widening and improvements, improvements, improvements to riding quality, widening of pipe culverts, reconstruction of slab culverts and including up keeping for a period of 60 months on government roads in vellakovil (highways), c&m, sub division. package no.57 road a :- widening from two lane to three lane and improvements of erode - mulanur road (via) muthur, vellakovil and puthuppai at km 42/0 - 42/500 (sh 84 a) including upkeeping for a period of 60 months road b :- improvements of erode - mulanur road (via) muthur, vellakovil and puthuppai at km 42/500 - 43/6 (sh 84 a) including upkeeping for a period of 60 months road c :- widening from single lane to intermediate lane and improvements of parakadai - punjaithalayur road (via) manalur road at km 0/0 - 1/0 including reconstruction of slab culvert at km 0/8 and widening of pipe culvert at km 0/10 including upkeeping for a period of 60 months road d :- improvements of parakadai - punjaithalayur road (via) manalur road at km 14/2 - 16/2 and 16/6 - 21/450 including upkeeping for a period of 60 months road e :- improvements of ponparapi - kambaliampatty road at km 7/0 - 10/8 ( using plastic waste ) including upkeeping for a period of 60 months road f :- improvements to riding quality at km 8/0 - 11/300 of uthiyur - dasanaickenpatty (md 993) including upkeeping for a period of 60 months road g :- improvements to riding quality at km 11/700 - 14/0 of uthiyur - dasanaickenpatty (md 993) including upkeeping for a period of 60 months road h :- improvements to riding quality at km 0/0 - 3/6 and 6/6 - 7/0 of nagapattinam - gudalur - mysore road to ganapathipalayam road including upkeeping for a period of 60 months"
694 Widening, Improvements and Improvements to Riding Quality to Government Roads including CD works and Construction of Drain and Providing RCC centre median and Up keeping for a period of 60 months in Sankari (H) C&M Sub Division (Package-26) The Following works are involved in this package 1.Widening from Two lane to Four lane and Improvements of Salem - Cochin - Kanyakumari Road (Abandoned NH 47) Sankari at km 35/6 - 36/2 including CD works and Providing RCC centre median (SHU117) including upkeeping for a period of 60 months 01-CRIDP-19-20-S-0361 2.Widening from Two lane to Four lane and Improvements of Salem - Cochin - Kanyakumari Road (Abandoned NH 47) Sankari at km 36/2 - 36/8 including Providing RCC centre median (SHU117) including upkeeping for a period of 60 months 01-CRIDP-19-20-S-0362 3.Widening from Two lane to Four lane and Improvements of Salem - Cochin - Kanyakumari Road (Abandoned NH 47) Sankari at km 36/8 - 37/4 including Providing RCC centre median (SHU117) including upkeeping for a period of 60 months 01-CRIDP-19-20-S-0363 4.Widening from Two lane to Four lane and Improvements of Salem - Cochin - Kanyakumari Road (Abandoned NH 47) Sankari at km 37/4 - 37/8 including Providing RCC centre median (SHU117) including upkeeping for a period of 60 months 01-CRIDP-19-20-S-0364 5.Improvements to Riding Quality at km 0/0 - 0/8 of Sankari - Mecheri road (via) Edappady (SH 220) including upkeeping for a period of 60 months 01-CRIDP-19-20-I-4524 6.Construction of Drain at km 42/6 of Omalur - Sankari - Thiruchengode - Paramathi Road (SH 86) 01-CRIDP-19-20-S-0387"
TRN : 719204 |  Salem - Tamil Nadu
Contract Value : 5.87 Crore | Agency Name : Highway Department
Tender award for widening, improvements and improvements to riding quality to government roads including cd works and construction of drain and providing rcc centre median and up keeping for a period of 60 months in sankari (h) c&m sub division (package-26) the following works are involved in this package 1.widening from two lane to four lane and improvements of salem - cochin - kanyakumari road (abandoned nh 47) sankari at km 35/6 - 36/2 including cd works and providing rcc centre median (shu117) including upkeeping for a period of 60 months 01-cridp-19-20-s-0361 2.widening from two lane to four lane and improvements of salem - cochin - kanyakumari road (abandoned nh 47) sankari at km 36/2 - 36/8 including providing rcc centre median (shu117) including upkeeping for a period of 60 months 01-cridp-19-20-s-0362 3.widening from two lane to four lane and improvements of salem - cochin - kanyakumari road (abandoned nh 47) sankari at km 36/8 - 37/4 including providing rcc centre median (shu117) including upkeeping for a period of 60 months 01-cridp-19-20-s-0363 4.widening from two lane to four lane and improvements of salem - cochin - kanyakumari road (abandoned nh 47) sankari at km 37/4 - 37/8 including providing rcc centre median (shu117) including upkeeping for a period of 60 months 01-cridp-19-20-s-0364 5.improvements to riding quality at km 0/0 - 0/8 of sankari - mecheri road (via) edappady (sh 220) including upkeeping for a period of 60 months 01-cridp-19-20-i-4524 6.construction of drain at km 42/6 of omalur - sankari - thiruchengode - paramathi road (sh 86) 01-cridp-19-20-s-0387"
695 Widening and Improvements, Improvements to Riding Quality, Widening of Pipe culverts, Construction of Retaining Walls, Reconstruction of Slab culverts, and including Up Keeping for a period of 60 Months on Government Roads in Vellakovil (Highways), C&M, Sub Division. Package No.56 Road A :- Widening from Two lane to Three lane and Improvements of Vellakovil - Mulanur road (via) Akkaraipalayam road at km 0/0 - 0/8 including widening of pipe culvert at km 0/8 (SH -197) including upkeeping for a period of 60 months Road B :- Widening from Two lane to Three lane and Improvements of Vellakovil - Mulanur road (via) Akkaraipalayam road at km 0/8 - 1/300 including widening of pipe culvert at km 1/4 (SH -197) including upkeeping for a period of 60 months Road C :- Widening from Single lane to Intermediate lane and Improvements of Naatrayankovil - Chinnathipalayam - Moothampalayam road at km 3/6 - 5/100 , Improvements at km 5/100 - 7/250 including Reconstruction of slab culvert at km 4/2 & 4/8 and widening of pipe culvert at km 3/8,3/10 including upkeeping for a period of 60 months Road D :- Widening from Single lane to Intermediate lane and Improvements of Naal road - Moothampalayam road at km 0/0 - 1/0 including Construction of Retaining wall at km 0/8 & 0/10 and Reconstruction of slab culvert at km 0/10 including upkeeping for a period of 60 months Road E :- Improvements to Riding Quality at km 6/0 - 7/0 of Vellakovil - Mulanur road (via) Akkaraipalayam road (SH -197) including upkeeping for a period of 60 months Road F :- Improvements to Riding Quality at km 13/6 - 16/0 of Nathakadaiyur - Uthamapalayam road ( MD 886 ) including upkeeping for a period of 60 months Road G :- Improvements to Riding Quality at km 21/2 - 25/2 of Nathakadaiyur - Uthamapalayam road ( MD 886 ) including extra length of 180m at km 25/2 including upkeeping for a period of 60 months Road H :- Improvements to Riding Quality at km 0/0 - 2/0 of Muthur - Vellakovil road to Semalaigoundenvalasu road including upkeeping for a period of 60 months"
TRN : 716243 |  Tirupur - Tamil Nadu
Contract Value : 6.55 Crore | Agency Name : Highway Department
Tender award for widening and improvements, improvements to riding quality, widening of pipe culverts, construction of retaining walls, reconstruction of slab culverts, and including up keeping for a period of 60 months on government roads in vellakovil (highways), c&m, sub division. package no.56 road a :- widening from two lane to three lane and improvements of vellakovil - mulanur road (via) akkaraipalayam road at km 0/0 - 0/8 including widening of pipe culvert at km 0/8 (sh -197) including upkeeping for a period of 60 months road b :- widening from two lane to three lane and improvements of vellakovil - mulanur road (via) akkaraipalayam road at km 0/8 - 1/300 including widening of pipe culvert at km 1/4 (sh -197) including upkeeping for a period of 60 months road c :- widening from single lane to intermediate lane and improvements of naatrayankovil - chinnathipalayam - moothampalayam road at km 3/6 - 5/100 , improvements at km 5/100 - 7/250 including reconstruction of slab culvert at km 4/2 & 4/8 and widening of pipe culvert at km 3/8,3/10 including upkeeping for a period of 60 months road d :- widening from single lane to intermediate lane and improvements of naal road - moothampalayam road at km 0/0 - 1/0 including construction of retaining wall at km 0/8 & 0/10 and reconstruction of slab culvert at km 0/10 including upkeeping for a period of 60 months road e :- improvements to riding quality at km 6/0 - 7/0 of vellakovil - mulanur road (via) akkaraipalayam road (sh -197) including upkeeping for a period of 60 months road f :- improvements to riding quality at km 13/6 - 16/0 of nathakadaiyur - uthamapalayam road ( md 886 ) including upkeeping for a period of 60 months road g :- improvements to riding quality at km 21/2 - 25/2 of nathakadaiyur - uthamapalayam road ( md 886 ) including extra length of 180m at km 25/2 including upkeeping for a period of 60 months road h :- improvements to riding quality at km 0/0 - 2/0 of muthur - vellakovil road to semalaigoundenvalasu road including upkeeping for a period of 60 months"
696 Strengthening, Widening, Improvements and Improvements to Riding Quality to Government Roads including Construction of CD Works, Drain and up keeping the roads for a period of 60 months in Valappady C&M Sub Division (Package-12) The Following works are involved in this package 1. Widening from Intermediate lane to Two lane and Improvements of Puthiragoundampalayam - Edapatty Road (via) Panamadal at km 5/0 - 6/6 (M669) Including upkeeping for a period of 60 months (01-CRIDP-19-20-M-1287) 2. Widening from Intermediate lane to Two lane and Improvements of Puthiragoundampalayam - Edapatty Road (via) Panamadal at km 7/6 - 8/6 (M669) Including upkeeping for a period of 60 months (01-CRIDP-19-20-M-1288) 3. Improvements to Riding Quality at km 0/0 - 0/2, 0/6- 1/100 , 4/8 - 5/0 and 5/4 - 6/0 of Valapady- Thimmanaickenpatty Road including construction of pipe culvert at Km.0/2(MD 530) Including upkeeping for a period of 60 months (01-CRIDP-19-20-I-4469) 4. Improvements to Riding Quality at km 6/8 - 7/4, 7/6- 8/0 and 8/8 - 9/2 of Valapady- Thimmanaickenpatty Road including construction of pipe culvert at Km.0/10 (i) and (ii)(MD 530) Including upkeeping for a period of 60 months (01-CRIDP-19-20-I-4470) 5. Improvements to Riding Quality at km 0/0-1/0 of Pagadupattu-Moongilpattu Road Including upkeeping for a period of 60 months (01-CRIDP-19-20-I-4511) 6. Strengthening of Palaniapuri to Road from km 32/8 of Salem-Ulundurpet road (via) Thalavaipatty, Thennampillaiyur, Ariyapalayam, E.Karadipatty, West Rajapalayam and Thamaiyanur road at km 9/8 - 10/8, 11/4 - 12/4, 14/0 - 14/6 and 16/6 - 17/0 Including upkeeping for a period of 60 months (01-CRIDP-19-20-O-2587) 7. Widening from Intermediate lane to Two lane and Improvements of Ayothiyapattinam-Belur- Kilakkadu Road at km 51/0 - 52/4 Including Construction of Drain at km.51/0-51/8 (MD 1044) Including upkeeping for a period of 60 months (01-CRIDP-19-20-M-1291)"
TRN : 719198 |  Salem - Tamil Nadu
Contract Value : 7.00 Crore | Agency Name : Highway Department
Tender award for strengthening, widening, improvements and improvements to riding quality to government roads including construction of cd works, drain and up keeping the roads for a period of 60 months in valappady c&m sub division (package-12) the following works are involved in this package 1. widening from intermediate lane to two lane and improvements of puthiragoundampalayam - edapatty road (via) panamadal at km 5/0 - 6/6 (m669) including upkeeping for a period of 60 months (01-cridp-19-20-m-1287) 2. widening from intermediate lane to two lane and improvements of puthiragoundampalayam - edapatty road (via) panamadal at km 7/6 - 8/6 (m669) including upkeeping for a period of 60 months (01-cridp-19-20-m-1288) 3. improvements to riding quality at km 0/0 - 0/2, 0/6- 1/100 , 4/8 - 5/0 and 5/4 - 6/0 of valapady- thimmanaickenpatty road including construction of pipe culvert at km.0/2(md 530) including upkeeping for a period of 60 months (01-cridp-19-20-i-4469) 4. improvements to riding quality at km 6/8 - 7/4, 7/6- 8/0 and 8/8 - 9/2 of valapady- thimmanaickenpatty road including construction of pipe culvert at km.0/10 (i) and (ii)(md 530) including upkeeping for a period of 60 months (01-cridp-19-20-i-4470) 5. improvements to riding quality at km 0/0-1/0 of pagadupattu-moongilpattu road including upkeeping for a period of 60 months (01-cridp-19-20-i-4511) 6. strengthening of palaniapuri to road from km 32/8 of salem-ulundurpet road (via) thalavaipatty, thennampillaiyur, ariyapalayam, e.karadipatty, west rajapalayam and thamaiyanur road at km 9/8 - 10/8, 11/4 - 12/4, 14/0 - 14/6 and 16/6 - 17/0 including upkeeping for a period of 60 months (01-cridp-19-20-o-2587) 7. widening from intermediate lane to two lane and improvements of ayothiyapattinam-belur- kilakkadu road at km 51/0 - 52/4 including construction of drain at km.51/0-51/8 (md 1044) including upkeeping for a period of 60 months (01-cridp-19-20-m-1291)"
697 Widening and Improvements, Improvements, Improvements to Riding Quality, Construction of well protective walls, Construction of Retaining Walls, construction of box culverts, Reconstruction of Box culverts, Curve Widening and including Up Keeping for a period of 60 Months on Government Roads in Mulanur (Highways), C&M, Sub Division. Package No.55 Road A :- Widening from Two lane to Three lane and Improvements of Pollachi - Dharapuram - Karur road at Km 82/2-83/2 including Construction of Well protective wall at km 82/6 (SH 21) including upkeeping for a period of 60 months Road B :- Widening from Two lane to Three lane and Improvements of Pollachi - Dharapuram - Karur road at Km 83/2-84/2 including Reconstruction of Box culvert at Km 84/2, Construction of Well protective wall at Km 83/10 (SH 21) including upkeeping for a period of 60 months Road C :- Improvements of Pollachi - Dharapuram - Karur road at Km 56/4-57/2 including Construction of Retaining wall at Km 56/6 (SH 21) including upkeeping for a period of 60 months Road D :- Improvements of Muthur - Mulanur road to Vanjivalasu (via) Sunnampukattuvalasu at Km 0/0-4/150 including Construction of box culvert at Km 1/6, construction of Retaining Wall at Km 1/8 including upkeeping for a period of 60 months Road E :- Improvements of Pommipalayam pirivu - Nalukalkuttai road at Km 0/0-2/8 including Reconstruction of box culvert at Km 0/8 (Using plastic waste) including upkeeping for a period of 60 months Road F :- Widening from Single lane to Intermediate lane and Improvements of Muthugoundenvalasu pirivu - Muthur, Mulanur road (via) Thalakkarai at Km 0/0-1/0 including upkeeping for a period of 60 months Road G :- Improvements of Anuppapatti - Valaikarainvalasu road (via) Vadugapatti at Km 0/0-3/0 including Reconstruction of box culvert at Km 2/8, Curve Widening at Km 0/10, construction of Retaining Wall at Km 1/2 including upkeeping for a period of 60 months Road H :- Improvements to Riding Quality at Km 0/0-1/4 of Pattuthurai - Thulukkavalasu road including upkeeping for a period of 60 months"
TRN : 716245 |  Tirupur - Tamil Nadu
Contract Value : 6.08 Crore | Agency Name : Highway Department
Tender award for widening and improvements, improvements, improvements to riding quality, construction of well protective walls, construction of retaining walls, construction of box culverts, reconstruction of box culverts, curve widening and including up keeping for a period of 60 months on government roads in mulanur (highways), c&m, sub division. package no.55 road a :- widening from two lane to three lane and improvements of pollachi - dharapuram - karur road at km 82/2-83/2 including construction of well protective wall at km 82/6 (sh 21) including upkeeping for a period of 60 months road b :- widening from two lane to three lane and improvements of pollachi - dharapuram - karur road at km 83/2-84/2 including reconstruction of box culvert at km 84/2, construction of well protective wall at km 83/10 (sh 21) including upkeeping for a period of 60 months road c :- improvements of pollachi - dharapuram - karur road at km 56/4-57/2 including construction of retaining wall at km 56/6 (sh 21) including upkeeping for a period of 60 months road d :- improvements of muthur - mulanur road to vanjivalasu (via) sunnampukattuvalasu at km 0/0-4/150 including construction of box culvert at km 1/6, construction of retaining wall at km 1/8 including upkeeping for a period of 60 months road e :- improvements of pommipalayam pirivu - nalukalkuttai road at km 0/0-2/8 including reconstruction of box culvert at km 0/8 (using plastic waste) including upkeeping for a period of 60 months road f :- widening from single lane to intermediate lane and improvements of muthugoundenvalasu pirivu - muthur, mulanur road (via) thalakkarai at km 0/0-1/0 including upkeeping for a period of 60 months road g :- improvements of anuppapatti - valaikarainvalasu road (via) vadugapatti at km 0/0-3/0 including reconstruction of box culvert at km 2/8, curve widening at km 0/10, construction of retaining wall at km 1/2 including upkeeping for a period of 60 months road h :- improvements to riding quality at km 0/0-1/4 of pattuthurai - thulukkavalasu road including upkeeping for a period of 60 months"
698 Improvements to Roads and Improvements to Riding Quality to Government Roads in Salem (H) C &M,Sub Division (Package-5) The Following works are involved in this package 1.Improvements of Jagir Ammapalayam - Tharamangalam road at km 4/0 - 5/2 (SH 219) including upkeeping for a period of 60 months (01-CRIDP-19-20-S-0343) 2.Improvements of Jagir Ammapalayam - Tharamangalam road at km 5/2 - 6/0 and 8/0 - 8/4 (SH 219) including upkeeping for a period of 60 months (01-CRIDP-19-20-S-0344) 3.Improvements of Jagir Ammapalayam - Tharamangalam road at km 8/4 - 9/0 and 11/0 - 11/500 (SH 219) including upkeeping for a period of 60 months (01-CRIDP-19-20-S-0345) 4.Improvements to Riding Quality at km 0/0 - 1/2 of Ammapet - Kumaragiri road including upkeeping for a period of 60 months (01-CRIDP-19-20-I-4490) 5,Improvements to Riding Quality at km 0/0 - 0/345 of Service road to the ROB at Km.0/8 of Salem - Omalur Main road near Government Hospital on Kalpana Theater side. (01-CRIDP-19-20-I-4507) 6,Improvements to Riding Quality at km 0/0 - 0/690 of Service road to the ROB at Km.0/8 of Salem - Omalur Main road near Government Hospital on Gandhi Stadium side including upkeeping for a period of 60 months. (01-CRIDP-19-20-I-4506) 7,Improvements to Riding Quality at km 0/0 - 0/240 of Service road to the ROB at Km.0/8 of Salem - Omalur Main road near Government Hospital on Ponni Super Market side including upkeeping for a period of 60 months. (01-CRIDP-19-20-I-4508) 8,Improvements to Riding Quality at km 0/0 - 0/285 of Service road to the ROB at Km.0/8 of Salem - Omalur Main road near Government Hospital on Hospital side including upkeeping for a period of 60 months. (01-CRIDP-19-20-I-4510) "
TRN : 719187 |  Salem - Tamil Nadu
Contract Value : 6.46 Crore | Agency Name : Highway Department
Tender award for improvements to roads and improvements to riding quality to government roads in salem (h) c &m,sub division (package-5) the following works are involved in this package 1.improvements of jagir ammapalayam - tharamangalam road at km 4/0 - 5/2 (sh 219) including upkeeping for a period of 60 months (01-cridp-19-20-s-0343) 2.improvements of jagir ammapalayam - tharamangalam road at km 5/2 - 6/0 and 8/0 - 8/4 (sh 219) including upkeeping for a period of 60 months (01-cridp-19-20-s-0344) 3.improvements of jagir ammapalayam - tharamangalam road at km 8/4 - 9/0 and 11/0 - 11/500 (sh 219) including upkeeping for a period of 60 months (01-cridp-19-20-s-0345) 4.improvements to riding quality at km 0/0 - 1/2 of ammapet - kumaragiri road including upkeeping for a period of 60 months (01-cridp-19-20-i-4490) 5,improvements to riding quality at km 0/0 - 0/345 of service road to the rob at km.0/8 of salem - omalur main road near government hospital on kalpana theater side. (01-cridp-19-20-i-4507) 6,improvements to riding quality at km 0/0 - 0/690 of service road to the rob at km.0/8 of salem - omalur main road near government hospital on gandhi stadium side including upkeeping for a period of 60 months. (01-cridp-19-20-i-4506) 7,improvements to riding quality at km 0/0 - 0/240 of service road to the rob at km.0/8 of salem - omalur main road near government hospital on ponni super market side including upkeeping for a period of 60 months. (01-cridp-19-20-i-4508) 8,improvements to riding quality at km 0/0 - 0/285 of service road to the rob at km.0/8 of salem - omalur main road near government hospital on hospital side including upkeeping for a period of 60 months. (01-cridp-19-20-i-4510) "
699 Improvements to Riding Quality, Reconstruction of Box Culvert and including Up Keeping for a period of 60 Months on Government Roads in Dharapuram (Highways), C&M, Sub Division. Package No.54 Road A :- Improvements to Riding Quality at km 77/050 - 79/8 of Erode - Dharapuram road (SH83A) including upkeeping for a period of 60 months. Road B :- Improvements to Riding quality at km 7/8-14/6 of Kundadam - Sankarandampalayam road (via) Nochipalayam, Aalampalayam, Karaiputhur Arisana Colony (Using Plastic Waste) (including extra length of 140 m at km 14/6) including upkeeping for a period of 60 months. Road C :- Improvements to Riding quality at km 3/4 - 5/6 of Pettaikalipalayam - Eragampatty road(via) Ottapalayam including upkeeping for a period of 60 months. Road D :- Improvements to Riding quality at km 0/0-1/985 of Sellampalayam - Ranjithapuram road (via) Somanuthu, Kottamuthampalayam loop road (Road - B) (including extra length of 70 m at km 1/985) including upkeeping for a period of 60 months. Road E :- Improvements to Riding quality at km 13/4-16/4, 18/0-20/0 & 22/0-23/4 of Kundadam - Ponnapuram road including upkeeping for a period of 60 months. Road F :- Reconstruction of box culvert at km 1/6 of The road branching at Km 16/2 of Dharapuram - Tirupur road to Kundadam (via) Sedapalayam Road G :- Improvements to Riding quality at km 1/0 - 3/0, 5/0-6/0, 7/0-8/0 & 9/0-11/0 of Kundadam - Govindhapuram road including upkeeping for a period of 60 months. "
TRN : 716246 |  Tirupur - Tamil Nadu
Contract Value : 5.19 Crore | Agency Name : Highway Department
Tender award for improvements to riding quality, reconstruction of box culvert and including up keeping for a period of 60 months on government roads in dharapuram (highways), c&m, sub division. package no.54 road a :- improvements to riding quality at km 77/050 - 79/8 of erode - dharapuram road (sh83a) including upkeeping for a period of 60 months. road b :- improvements to riding quality at km 7/8-14/6 of kundadam - sankarandampalayam road (via) nochipalayam, aalampalayam, karaiputhur arisana colony (using plastic waste) (including extra length of 140 m at km 14/6) including upkeeping for a period of 60 months. road c :- improvements to riding quality at km 3/4 - 5/6 of pettaikalipalayam - eragampatty road(via) ottapalayam including upkeeping for a period of 60 months. road d :- improvements to riding quality at km 0/0-1/985 of sellampalayam - ranjithapuram road (via) somanuthu, kottamuthampalayam loop road (road - b) (including extra length of 70 m at km 1/985) including upkeeping for a period of 60 months. road e :- improvements to riding quality at km 13/4-16/4, 18/0-20/0 & 22/0-23/4 of kundadam - ponnapuram road including upkeeping for a period of 60 months. road f :- reconstruction of box culvert at km 1/6 of the road branching at km 16/2 of dharapuram - tirupur road to kundadam (via) sedapalayam road g :- improvements to riding quality at km 1/0 - 3/0, 5/0-6/0, 7/0-8/0 & 9/0-11/0 of kundadam - govindhapuram road including upkeeping for a period of 60 months. "
700 Improvements to Riding Quality to Government Roads including Construction and Reconstruction of Box Culvert,Drain and Up keeping for a period of 60 months in Edappady (H) C&M Sub Division (Package-23) The Following works are involved in this package 1.Construction of Drain at km 8/0-8/4 of Magudanchavadi - Komarapalayam road (via) Edappady including CD works(SH 221) (01-CRIDP-19-20-S-0389) 2. Improvements to Riding Quality at km 18/8 -19/2 and 19/4 - 20/0 of Magudanchavadi -Komarapalayam road (via) Edappady (SH 221)including Upkeeping for a period of 60 months (01-CRIDP-19-20-I-4521) 3. Improvements to Riding Quality at km 20/0 -22/2 of Magudanchavadi - Komarapalayam road(via) Edappady (SH 221) including Upkeeping for a period of 60 months (01-CRIDP-19-20-I-4522) 4. Raising the dip at km 19/4 of Magudanchavadi -Komarapalayam road (via) Edappady including Construction of Box culvert (SH 221) including Upkeeping for a period of 60 months (01-CRIDP-19-20-S-0386) 5. Improvements of Magudanchavadi - Komarapalayam road (via) Edappady at km 14/2- 15/2 & 16/4-16/6 including easing the approaches at Km 14/8 & 14/10 (SH 221) including Upkeeping for a period of 60 months (01-CRIDP-19-20-S-0380) 6. Improvements of Magudanchavadi - Komarapalayam road (via) Edappady at km 16/6 - 17/8 including easing the Edappady Bus stand approaches(SH 221) including Upkeeping for a period of 60 months (01-CRIDP-19-20-S-0381) 7. Improvements to Riding Quality at km 12/2 - 14/2 of Magudanchavadi - Komarapalayam road (via) Edappady (SH 221) including Upkeeping for a period of 60 months(01-CRIDP-19-20-I-4530) 8. Reconstruction of Box culvert at km 13/2 of Magudanchavadi - Komarapalayam road (via) Edappady (SH 221) including Upkeeping for a period of 60 months (01-CRIDP-19-20-S-0398)"
TRN : 719183 |  Salem - Tamil Nadu
Contract Value : 6.56 Crore | Agency Name : Highway Department
Tender award for improvements to riding quality to government roads including construction and reconstruction of box culvert,drain and up keeping for a period of 60 months in edappady (h) c&m sub division (package-23) the following works are involved in this package 1.construction of drain at km 8/0-8/4 of magudanchavadi - komarapalayam road (via) edappady including cd works(sh 221) (01-cridp-19-20-s-0389) 2. improvements to riding quality at km 18/8 -19/2 and 19/4 - 20/0 of magudanchavadi -komarapalayam road (via) edappady (sh 221)including upkeeping for a period of 60 months (01-cridp-19-20-i-4521) 3. improvements to riding quality at km 20/0 -22/2 of magudanchavadi - komarapalayam road(via) edappady (sh 221) including upkeeping for a period of 60 months (01-cridp-19-20-i-4522) 4. raising the dip at km 19/4 of magudanchavadi -komarapalayam road (via) edappady including construction of box culvert (sh 221) including upkeeping for a period of 60 months (01-cridp-19-20-s-0386) 5. improvements of magudanchavadi - komarapalayam road (via) edappady at km 14/2- 15/2 & 16/4-16/6 including easing the approaches at km 14/8 & 14/10 (sh 221) including upkeeping for a period of 60 months (01-cridp-19-20-s-0380) 6. improvements of magudanchavadi - komarapalayam road (via) edappady at km 16/6 - 17/8 including easing the edappady bus stand approaches(sh 221) including upkeeping for a period of 60 months (01-cridp-19-20-s-0381) 7. improvements to riding quality at km 12/2 - 14/2 of magudanchavadi - komarapalayam road (via) edappady (sh 221) including upkeeping for a period of 60 months(01-cridp-19-20-i-4530) 8. reconstruction of box culvert at km 13/2 of magudanchavadi - komarapalayam road (via) edappady (sh 221) including upkeeping for a period of 60 months (01-cridp-19-20-s-0398)"