You have searched for highway-department in Awarded Tender Result. Click on any tender to view further details.

751 Improvements to Government Roads, including Construction of Drain and up keeping for a period of 60 months in Tiruchengode (H) C&M Sub Division (Package-49) The Following works are involved in this package 1. Improvements of Komarapalayam-Bhavani Road (Abonded NH 47) at km 0/0-1/2 (SH 22) including upkeeping for a period of 60 months. (01-CRIDP-19-20-S-0418) 2. Improvements of Komarapalayam-Bhavani Road (Abonded NH 47) at km 1/2-2/4 (SH 22) including upkeeping for a period of 60 months. (01-CRIDP-19-20-S-0419) 3. Construction of Drain at km 12/750-13/5 (L/S & R/S) of Sankari- Pallipalayam Road (SH 79A) (01-CRIDP-19-20-S-0441) 4. Construction of Drain at km 13/5-14/250 (L/S & R/S) of Sankari- Pallipalayam Road (SH 79A) (01-CRIDP-19-20-S-0442)
752 Widening, Improvements, Curve Widening, Constructuion of Minor Bridge, Drain, Footpath, Junction Improvement works including Upkeeping for a period of 60 months in Chennai City Roads & Tambaram (H) C&M Sub Division Jurisdiction A)Construction Minor Bridge at Km 1 / 8 of Pallavaram -- Thiruneermalai -- Thirumudivakkam Road (MD 1163) ( 01 -- CRIDP -- 19 -- 20 -- O -- 0939) B) Widening from Two lane to Four lane and Improvements of Tambaram - Somangalam - Nandambakkam Road at km 0/6 - 0/900 including Construction of Drain Cum Footpath (MD1164) including upkeeping for a period of 60 months ( 01 -- CRIDP -- 19 -- 20 -- M -- 0934) C) Improvements of Curve at Km 4 / 8 -- 5 / 2 Tambaram - Mudichur - Sriperumbudur Road (SH110) including Widening, junction Improvements and upkeeping for a period of 60 months ( 01 -- CRIDP -- 19 -- 20 -- S -- 0004)"
753 Widening and Improvements to Government Roads including Construction of CD works, Retaining wall and Providing RCC centre median and Up keeping for a period of 60 months in Mettur (H) C&M Sub Division (Package-34) The Following works are involved in this package 1) Widening from Three lane to Four lane and Improvements of Thermal Power Plant road at Km.2/0-2/4, including Construction of Retaining Wall at Km.2/2 and Providing RCC Centre Median (SH-158) including upkeeping for a period of 60 months (01-CRIDP-19-20-S-0366) 2) Widening from Three lane to Four lane and Improvements of Thermal Power Plant road at Km.2/4-2/8, including Construction of Retaining Wall at Km.2/6 & 2/8, Widening of Pipe Culvert at Km.2/8 and Providing RCC Centre Median (SH-158) including upkeeping for a period of 60 months (01-CRIDP-19-20-S-0367) 3) Widening from Three lane to Four lane and Improvements of Thermal Power Plant road at Km.2/8-3/2, including Construction of Retaining Wall and Widening of Slab culvert at Km.2/10 and Providing RCC Centre Median (SH-158) including upkeeping for a period of 60 months (01-CRIDP-19-20-S-0370) 4) Widening from Three lane to Four lane and Improvements of Thermal Power Plant road at Km.3/2-3/8, including Widening of Slab culvert at Km.3/6 and Providing RCC Centre Median (SH-158) including upkeeping for a period of 60 months (01-CRIDP-19-20-S-0368) 5) Widening from Three lane to Four lane and Improvements of Thermal Power Plant road at Km.3/8-4/2, including Construction of Retaining Wall Km.4/2, Reconstruction of Box culvert at Km.3/10 and Providing RCC Centre Median (SH-158) including upkeeping for a period of 60 months (01-CRIDP-19-20-S-0369)"
TRN : 719203 |  Salem - Tamil Nadu
Contract Value : 7.49 Crore | Agency Name : Highway Department
Tender award for widening and improvements to government roads including construction of cd works, retaining wall and providing rcc centre median and up keeping for a period of 60 months in mettur (h) c&m sub division (package-34) the following works are involved in this package 1) widening from three lane to four lane and improvements of thermal power plant road at km.2/0-2/4, including construction of retaining wall at km.2/2 and providing rcc centre median (sh-158) including upkeeping for a period of 60 months (01-cridp-19-20-s-0366) 2) widening from three lane to four lane and improvements of thermal power plant road at km.2/4-2/8, including construction of retaining wall at km.2/6 & 2/8, widening of pipe culvert at km.2/8 and providing rcc centre median (sh-158) including upkeeping for a period of 60 months (01-cridp-19-20-s-0367) 3) widening from three lane to four lane and improvements of thermal power plant road at km.2/8-3/2, including construction of retaining wall and widening of slab culvert at km.2/10 and providing rcc centre median (sh-158) including upkeeping for a period of 60 months (01-cridp-19-20-s-0370) 4) widening from three lane to four lane and improvements of thermal power plant road at km.3/2-3/8, including widening of slab culvert at km.3/6 and providing rcc centre median (sh-158) including upkeeping for a period of 60 months (01-cridp-19-20-s-0368) 5) widening from three lane to four lane and improvements of thermal power plant road at km.3/8-4/2, including construction of retaining wall km.4/2, reconstruction of box culvert at km.3/10 and providing rcc centre median (sh-158) including upkeeping for a period of 60 months (01-cridp-19-20-s-0369)"
754 Special Repairs to Government Roads in Namakkal (H) C&M Sub Division (Package 91) The Following works are involved in this package 1.Special Repairs to Km 0/0-1/8 of Chittalandur - Jedarpalayam Road. 2.Special Repairs to Km0/0-2/0 of Koodacheri-Vasanthapuram-Nadanthai road 3.Special Repairs to Km 0/0-4/0 of Pandamangalam-Vengarai road 4.Special Repairs to Km 2/0-4/0 of Idumpankulam-Panangkadu road"
755 Improvements, Construction of drain including footpath in Chennai City Roads (H) C&M Sub Division Jurisdiction A) Improvements to Riding Quality at km 3/2 - 3/8 (LS&RS) & service road at km 3/8 - 4/2 of GNT Road (SHU87) (01-CRIDP-19-20-I-3778) B) Construction of Drain at km 8/0 - 8/3 (RS) of GST Road including footpath (01-CRIDP-19-20-S-0042) C) Construction of Drain at km 8/6 -8/9 of GST Road including footpath (SHU88) (01-CRIDP-19-20-S-0065) D) Construction of Drain at km 8/3 -8/6 of GST Road including footpath (SHU88) (01-CRIDP-19-20-S-0066) E) Construction of Protective wall & Providing paver block to the Vyasarapadi under pass at Km.4/4 of GNT Road (SHU87) (01-CRIDP-19-20-S-0049)"
756 Special Repairs to Government Roads in Tiruchengodu (H) C&M Sub Division (Package 90) The Following works are involved in this package 1. Special Repairs to Km 0/2-0/4, 7/5-7/8 of Tiruchengode - Ariyanur Road (SH 86A) 2. Special Repairs to Km 6/4-7/2 of Marungapuri-Beemarapatti-Suriya goundampalayam Road 3. Special Repairs to Km2/0-3/4 of Kailasampalayam-Kanakkampatti-Appiapatti Road 4. Special Repairs to Km1/6-2/0, 4/0-6/0 of Km 14/4 of Tiruchengode-Namakkal road to Velagoundampatti-Maniyanur road (via) Koothampoondi Road 5. Special Repairs to Km6/6-7/6 of Suriyagoundampalayam-Paruthipalli-Ramapuram Road 6. Special Repairs to Km1/2-1/6 of Km 19/10 of Rasipuram-Tiruchengode Road to Agaram Road"
757 Improvements and Improvements to Riding Quality to Government Roads including Construction of Box Culvert, Retaining wall, Drain and Providing Centere Medain and Upkeeping for a period of 60 months in Tiruchengodu (H) C&M Sub Division (Package52) The Following works are involved in this package 1. Improvements of Komarapalayam-Bhavani Road (Abonded NH 47) at km 2/4-3/460 (SH22) including upkeeping for a period of 60 months (01-CRIDP-19-20-S-0420) 2. Construction of Box culvert at km 22/10 of Tiruchengode- Komarapalayam road (MD 726) (01-CRIDP-19-20-M-1338) 3. Improvements to Riding Quality at km 33/0-34/700 of Komarapalayam-Pallipalayam-Jedarpalayam-Pandamangalam-Velur Road (SH 198). Including upkeeping for a period of 60 months (01-CRIDP-19-20-I-4560) 4. Providing Center median at km 52/6-53/0 of Omalur-Sankari-Tiruchengode-Paramathy Road (SH 86) (01-CRIDP-19-20-S-0431) 5. Improvements to Riding Quality at km 77/4-77/8 of Malliakarai-Rasipuram-Tiruchengode-Erode Road (SH 79). Including upkeeping for a period of 60 months (01-CRIDP-19-20-I-4558) 6. Improvements to Riding Quality at Km 4/2-6/965 of Kailasampalayam-Appanaickanpalayam- Pappampalayam road. Including upkeeping for a period of 60 months (01-CRIDP-19-20-I-4590) 7. Improvements to Riding Quality at Km 15/6-19/6 of Tiruchengode-Komarapalayam road (MD 726). Including upkeeping for a period of 60 months (01-CRIDP-19-20-I-4568) 8. Improvements to Riding Quality at Km 2/8-3/2 and 6/4-7/2, of Molasi road Including upkeeping for a period of 60 months ( 01-CRIDP-19-20-I-4589) 9. Construction of Drain at km 78/0-78/4 (L/S) of Malliakarai - Rasipuram-Tiruchengode -Erode Road (SH 79) (01-CRIDP-19-20-S-0447) 10. Construction of Drain at km 4/4-4/8 (R/S) of Tiruchengode-Komarapalayam road (MD 726) (01-CRIDP-19-20-M-1355) 11. Construction of Box culvert at km 2/4 of km 7/4 of Sankari - Thiruchengode road to Vellalapatti road (via) Athurampalayam Mathakovil Adhithiravidar street (01-CRIDP-19-20-O-2653) 12. Construction of Retaining wall at Km 2/4 (L/S & R/S) of km 7/4 of Sankari - Thiruchengode road to Vellalapatti road (via) Athurampalayam Mathakovil Adhithiravidar street (01-CRIDP-19-20-O-2686) 13. Providing Center Median at km 48/8-49/2 & km 50/4 of Omalur-Sankari-Tiruchengode-Paramathy Road (SH 86) (01-CRIDP-19-20-S-0437)"
TRN : 718805 |  Salem - Tamil Nadu
Contract Value : 5.17 Crore | Agency Name : Highway Department
Tender award for improvements and improvements to riding quality to government roads including construction of box culvert, retaining wall, drain and providing centere medain and upkeeping for a period of 60 months in tiruchengodu (h) c&m sub division (package52) the following works are involved in this package 1. improvements of komarapalayam-bhavani road (abonded nh 47) at km 2/4-3/460 (sh22) including upkeeping for a period of 60 months (01-cridp-19-20-s-0420) 2. construction of box culvert at km 22/10 of tiruchengode- komarapalayam road (md 726) (01-cridp-19-20-m-1338) 3. improvements to riding quality at km 33/0-34/700 of komarapalayam-pallipalayam-jedarpalayam-pandamangalam-velur road (sh 198). including upkeeping for a period of 60 months (01-cridp-19-20-i-4560) 4. providing center median at km 52/6-53/0 of omalur-sankari-tiruchengode-paramathy road (sh 86) (01-cridp-19-20-s-0431) 5. improvements to riding quality at km 77/4-77/8 of malliakarai-rasipuram-tiruchengode-erode road (sh 79). including upkeeping for a period of 60 months (01-cridp-19-20-i-4558) 6. improvements to riding quality at km 4/2-6/965 of kailasampalayam-appanaickanpalayam- pappampalayam road. including upkeeping for a period of 60 months (01-cridp-19-20-i-4590) 7. improvements to riding quality at km 15/6-19/6 of tiruchengode-komarapalayam road (md 726). including upkeeping for a period of 60 months (01-cridp-19-20-i-4568) 8. improvements to riding quality at km 2/8-3/2 and 6/4-7/2, of molasi road including upkeeping for a period of 60 months ( 01-cridp-19-20-i-4589) 9. construction of drain at km 78/0-78/4 (l/s) of malliakarai - rasipuram-tiruchengode -erode road (sh 79) (01-cridp-19-20-s-0447) 10. construction of drain at km 4/4-4/8 (r/s) of tiruchengode-komarapalayam road (md 726) (01-cridp-19-20-m-1355) 11. construction of box culvert at km 2/4 of km 7/4 of sankari - thiruchengode road to vellalapatti road (via) athurampalayam mathakovil adhithiravidar street (01-cridp-19-20-o-2653) 12. construction of retaining wall at km 2/4 (l/s & r/s) of km 7/4 of sankari - thiruchengode road to vellalapatti road (via) athurampalayam mathakovil adhithiravidar street (01-cridp-19-20-o-2686) 13. providing center median at km 48/8-49/2 & km 50/4 of omalur-sankari-tiruchengode-paramathy road (sh 86) (01-cridp-19-20-s-0437)"
758 Special Repairs to Government Roads in Sendamangalam (H) C&M Sub Division (Package 88) The Following works are involved in this package 1. Special Repairs to Km 26/0-27/0 of Mohanur - Namakkal - Sendamangalam - Rasipuram road 2. Special Repairs to Km 234/845 - 236/135 of VCC Road 3. Special Repairs to Km 6/585 - 7/250 of Namagiripettai - Ariyagoundampatti - Kalkurichipirivu road 4. Special Repairs to Km 8/0 - 9/0 of Velegoundampatty - Elur - Puduchatiram road 5. Special Repairs to Km 9/4 - 10/4 and 11/4 - 12/0 of Velegoundampatty - Elur -Puduchatiram road 6.Special Repairs to Km 0/0 - 1/8 of Kulivalavu - Othakadai road
759 Widening, Improvements, Improvements to Riding Quality, Reconstruction of Slab Culvert, Construction of Retaining wall including up keeping for a period of 60 months in Govt. Roads in respect of Peravurani & Pattukottai (H), C&M Subdivision. Road A, 01-CRIDP-19-20-O-2431, Improvements of Kattaiankadu - Ukkadai - Kollukkadu road at km 0/0 - 0/8 and 5/0 - 6/0 Widening from 3.00m lane to 3.75m lane, including reconstruction of slab Culvert 0/8, Retaining wall at km 0/6 including upkeeping for a period of 60 months Road B, 01-CRIDP-19-20-O-2432, Improvements of Kattaiankadu - Ukkadai - Kollukkadu road at km 6/0 - 7/6 Widening from 3.00m lane to 3.75m lane, including reconstruction of slab Culvert 6/6, Retaining wall at km 6/6 including upkeeping for a period of 60 months Road C, 01-CRIDP-19-20-I-4398, Improvements to Riding Quality at km 4/4 - 6/6 of Palayam - Palamunthi road including upkeeping for a period of 60 months Road D, 01-CRIDP-19-20-I-4400, Improvements to Riding Quality at km 0/0 - 1/8 of Vettikkadu - Santhankadu road including upkeeping for a period of 60 months Road E, 01-CRIDP-19-20-I-4401, Improvements to Riding Quality at km 5/096 - 5/470, 5/870 - 6/468, 7/268 - 7/489 and 14/555 - 14/862 of Muthupettai - Mimisal Road including upkeeping for a period of 60 months Road F, 01-CRIDP-19-20-O-2448, Reconstruction of RCC slab culvert across CMP canal at km 1/6 of Kalagam - Karambakkadu road including upkeeping for a period of 60 months Road G, 01-CRIDP-19-20-O-2449, Reconstruction of RCC slab culvert across CMP canal at km 12/2 of Kattaiankadu - Ukkadai - Kollukkadu road including upkeeping for a period of 60 months Road H, 01-CRIDP-19-20-O-2489-, Construction of Retaining wall at km 2/8 of Peravurani - Marungappallam road "
TRN : 704962 |  Trichy - Tamil Nadu
Contract Value : 5.52 Crore | Agency Name : Highway Department
Tender award for widening, improvements, improvements to riding quality, reconstruction of slab culvert, construction of retaining wall including up keeping for a period of 60 months in govt. roads in respect of peravurani & pattukottai (h), c&m subdivision. road a, 01-cridp-19-20-o-2431, improvements of kattaiankadu - ukkadai - kollukkadu road at km 0/0 - 0/8 and 5/0 - 6/0 widening from 3.00m lane to 3.75m lane, including reconstruction of slab culvert 0/8, retaining wall at km 0/6 including upkeeping for a period of 60 months road b, 01-cridp-19-20-o-2432, improvements of kattaiankadu - ukkadai - kollukkadu road at km 6/0 - 7/6 widening from 3.00m lane to 3.75m lane, including reconstruction of slab culvert 6/6, retaining wall at km 6/6 including upkeeping for a period of 60 months road c, 01-cridp-19-20-i-4398, improvements to riding quality at km 4/4 - 6/6 of palayam - palamunthi road including upkeeping for a period of 60 months road d, 01-cridp-19-20-i-4400, improvements to riding quality at km 0/0 - 1/8 of vettikkadu - santhankadu road including upkeeping for a period of 60 months road e, 01-cridp-19-20-i-4401, improvements to riding quality at km 5/096 - 5/470, 5/870 - 6/468, 7/268 - 7/489 and 14/555 - 14/862 of muthupettai - mimisal road including upkeeping for a period of 60 months road f, 01-cridp-19-20-o-2448, reconstruction of rcc slab culvert across cmp canal at km 1/6 of kalagam - karambakkadu road including upkeeping for a period of 60 months road g, 01-cridp-19-20-o-2449, reconstruction of rcc slab culvert across cmp canal at km 12/2 of kattaiankadu - ukkadai - kollukkadu road including upkeeping for a period of 60 months road h, 01-cridp-19-20-o-2489-, construction of retaining wall at km 2/8 of peravurani - marungappallam road "
760 Special Repairs to Government Roads in Namakkal (H) C&M Sub Division (Package 87) The Following works are involved in this package 1. Special Repairs to Km 63/4-65/2 & 70/0-71/2 of Trichy Namakkal Road 2.Special Repairs to Km 4/0-5/0 of Namakkal Thindamangalam Keerambur Road. 3. Special Repairs to Km 0/0-1/4 of Serukkalai Cross Road to Vaiyarampalayam Road 4. Special Repairs to Km 6/0-6/6 of Pulagoundampatti-Serukkalai Road "