You have searched for highway-department in Awarded Tender Result. Click on any tender to view further details.

761 Widening, Improvements and Improvements to Riding Quality to Government Roads including Reconstruction of Box Culvert, Widening of Pipe Culvert and Construction of Drain and Upkeeping for a period of 60 months in Tiruchengodu (H) C&M Sub Division (Package50) The Following works are involved in this package 1. Widening from Two lane to Three Lane and Improvements of Komarapalayam-Pallipalayam-Jedarpalayam-Pandamangalam-Velur Road at km 18/7- 19/4. Including Reconstruction of Box culvert in lieu of Cutstone at km 19/4 and widening pipe culvert at km 18/8, 19/2(i), (ii) (SH 198). including upkeeping for a period of 60 months (01-CRIDP-19-20-S-0414) 2. Widening from Two lane to Three Lane and Improvements of Komarapalayam-Pallipalayam-Jedarpalayam-Pandamangalam-Velur Road at km 19/4- 20/0. (SH 198). including upkeeping for a period of 60 months ( 01-CRIDP-19-20-S-0415 ) 3. Widening from Two lane to Three Lane and Improvements of Komarapalayam-Pallipalayam-Jedarpalayam-Pandamangalam-Velur Road at km 20/0- 21/0 Including Widening of pipe culvert at km 20/2 (SH 198). including upkeeping for a period of 60 months (01-CRIDP-19-20-S-0412) 4. Improvements to Riding Quality at km 14/8-16/4 and 16/8-18/0 of Komarapalayam-Pallipalayam-Jedar palayam-Pandamangalam-Velur Road (SH 198) including upkeeping for a period of 60 months (01-CRIDP-19-20-I-4559 ) 5. Reconstruction of Boxculvert at km 16/2 of Komarapalayam - Pallipalayam - Jedarpalayam-Pandamangalam-Velur Road (SH 198) (01-CRIDP-19-20-S-0426) 6. Construction of Drain at km 12/0-12/750 (L/S & R/S) of Sankari- Pallipalayam Road (SH 79A) (01-CRIDP-19-20-S-0440)
TRN : 744101 |  Namakkal - Tamil Nadu
Contract Value : 5.49 Crore | Agency Name : Highway Department
Tender award for widening, improvements and improvements to riding quality to government roads including reconstruction of box culvert, widening of pipe culvert and construction of drain and upkeeping for a period of 60 months in tiruchengodu (h) c&m sub division (package50) the following works are involved in this package 1. widening from two lane to three lane and improvements of komarapalayam-pallipalayam-jedarpalayam-pandamangalam-velur road at km 18/7- 19/4. including reconstruction of box culvert in lieu of cutstone at km 19/4 and widening pipe culvert at km 18/8, 19/2(i), (ii) (sh 198). including upkeeping for a period of 60 months (01-cridp-19-20-s-0414) 2. widening from two lane to three lane and improvements of komarapalayam-pallipalayam-jedarpalayam-pandamangalam-velur road at km 19/4- 20/0. (sh 198). including upkeeping for a period of 60 months ( 01-cridp-19-20-s-0415 ) 3. widening from two lane to three lane and improvements of komarapalayam-pallipalayam-jedarpalayam-pandamangalam-velur road at km 20/0- 21/0 including widening of pipe culvert at km 20/2 (sh 198). including upkeeping for a period of 60 months (01-cridp-19-20-s-0412) 4. improvements to riding quality at km 14/8-16/4 and 16/8-18/0 of komarapalayam-pallipalayam-jedar palayam-pandamangalam-velur road (sh 198) including upkeeping for a period of 60 months (01-cridp-19-20-i-4559 ) 5. reconstruction of boxculvert at km 16/2 of komarapalayam - pallipalayam - jedarpalayam-pandamangalam-velur road (sh 198) (01-cridp-19-20-s-0426) 6. construction of drain at km 12/0-12/750 (l/s & r/s) of sankari- pallipalayam road (sh 79a) (01-cridp-19-20-s-0440)
762 Widening, Improvements, Improvements to Riding Quality, Reconstruction of Slab Culvert, Construction of Retaining wall including up keeping for a period of 60 months in Govt. Roads in respect of Peravurani & Pattukottai (H), C&M Subdivision. Road A, 01-CRIDP-19-20-O-2431, Improvements of Kattaiankadu - Ukkadai - Kollukkadu road at km 0/0 - 0/8 and 5/0 - 6/0 Widening from 3.00m lane to 3.75m lane, including reconstruction of slab Culvert 0/8, Retaining wall at km 0/6 including upkeeping for a period of 60 months Road B, 01-CRIDP-19-20-O-2432, Improvements of Kattaiankadu - Ukkadai - Kollukkadu road at km 6/0 - 7/6 Widening from 3.00m lane to 3.75m lane, including reconstruction of slab Culvert 6/6, Retaining wall at km 6/6 including upkeeping for a period of 60 months Road C, 01-CRIDP-19-20-I-4398, Improvements to Riding Quality at km 4/4 - 6/6 of Palayam - Palamunthi road including upkeeping for a period of 60 months Road D, 01-CRIDP-19-20-I-4400, Improvements to Riding Quality at km 0/0 - 1/8 of Vettikkadu - Santhankadu road including upkeeping for a period of 60 months Road E, 01-CRIDP-19-20-I-4401, Improvements to Riding Quality at km 5/096 - 5/470, 5/870 - 6/468, 7/268 - 7/489 and 14/555 - 14/862 of Muthupettai - Mimisal Road including upkeeping for a period of 60 months Road F, 01-CRIDP-19-20-O-2448, Reconstruction of RCC slab culvert across CMP canal at km 1/6 of Kalagam - Karambakkadu road including upkeeping for a period of 60 months Road G, 01-CRIDP-19-20-O-2449, Reconstruction of RCC slab culvert across CMP canal at km 12/2 of Kattaiankadu - Ukkadai - Kollukkadu road including upkeeping for a period of 60 months Road H, 01-CRIDP-19-20-O-2489-, Construction of Retaining wall at km 2/8 of Peravurani - Marungappallam road "
TRN : 704962 |  Trichy - Tamil Nadu
Contract Value : 5.52 Crore | Agency Name : Highway Department
Tender award for widening, improvements, improvements to riding quality, reconstruction of slab culvert, construction of retaining wall including up keeping for a period of 60 months in govt. roads in respect of peravurani & pattukottai (h), c&m subdivision. road a, 01-cridp-19-20-o-2431, improvements of kattaiankadu - ukkadai - kollukkadu road at km 0/0 - 0/8 and 5/0 - 6/0 widening from 3.00m lane to 3.75m lane, including reconstruction of slab culvert 0/8, retaining wall at km 0/6 including upkeeping for a period of 60 months road b, 01-cridp-19-20-o-2432, improvements of kattaiankadu - ukkadai - kollukkadu road at km 6/0 - 7/6 widening from 3.00m lane to 3.75m lane, including reconstruction of slab culvert 6/6, retaining wall at km 6/6 including upkeeping for a period of 60 months road c, 01-cridp-19-20-i-4398, improvements to riding quality at km 4/4 - 6/6 of palayam - palamunthi road including upkeeping for a period of 60 months road d, 01-cridp-19-20-i-4400, improvements to riding quality at km 0/0 - 1/8 of vettikkadu - santhankadu road including upkeeping for a period of 60 months road e, 01-cridp-19-20-i-4401, improvements to riding quality at km 5/096 - 5/470, 5/870 - 6/468, 7/268 - 7/489 and 14/555 - 14/862 of muthupettai - mimisal road including upkeeping for a period of 60 months road f, 01-cridp-19-20-o-2448, reconstruction of rcc slab culvert across cmp canal at km 1/6 of kalagam - karambakkadu road including upkeeping for a period of 60 months road g, 01-cridp-19-20-o-2449, reconstruction of rcc slab culvert across cmp canal at km 12/2 of kattaiankadu - ukkadai - kollukkadu road including upkeeping for a period of 60 months road h, 01-cridp-19-20-o-2489-, construction of retaining wall at km 2/8 of peravurani - marungappallam road "
763 Improvements to Government Roads, including Construction of Drain and up keeping for a period of 60 months in Tiruchengode (H) C&M Sub Division (Package-49) The Following works are involved in this package 1. Improvements of Komarapalayam-Bhavani Road (Abonded NH 47) at km 0/0-1/2 (SH 22) including upkeeping for a period of 60 months. (01-CRIDP-19-20-S-0418) 2. Improvements of Komarapalayam-Bhavani Road (Abonded NH 47) at km 1/2-2/4 (SH 22) including upkeeping for a period of 60 months. (01-CRIDP-19-20-S-0419) 3. Construction of Drain at km 12/750-13/5 (L/S & R/S) of Sankari- Pallipalayam Road (SH 79A) (01-CRIDP-19-20-S-0441) 4. Construction of Drain at km 13/5-14/250 (L/S & R/S) of Sankari- Pallipalayam Road (SH 79A) (01-CRIDP-19-20-S-0442)
764 Widening, Improvements and Improvements to Riding Quality to Government Roads including Curve widening, widening of slab culvert, construction of Drain and Retaining wall and Upkeeping for a period of 60 months in Rasipuram (H) C&M Sub Division (Package-46) The Following works are involved in this package 1) Widening from Two lane to Three lane and Improvements of Rasipuram - Attur road at km 0/0 - 1/0 including Widening Slab Culvert at Km 0/6 (MD402) including upkeeping for a period of 60 months (01-CRIDP-19-20-M-1326) 2) Improvements of Attaiyampatti - Masakkalipatti road at km 9/2 - 11/6 including Widening the curve at 10/10, 11/2, Construction of Retaining wall (MD46) and including upkeeping for a period of 60 months (01-CRIDP-19-20-M-1336) 3) Construction of Drain at km 0/2 of Alavaipatti road (01-CRIDP-19-20-O-2679) 4) Improvements of V C C road to Singalantha puram road (via) Patchal. at km 0/0 - 4/0 including Construction of Retaining Wall including upkeeping for a period of 60 months (01-CRIDP-19-20-P-3672) 5) Improvements to Riding Quality at km 9/6 - 10/8 of Mettala-Mullukurichi-Periyakombai road (MD853) including upkeeping for a period of 60 months (01-CRIDP-19-20-I-4570)"
765 Widening, Strengthening, Improvements, Construction of Retaining wall including up keeping for a period of 60 months in Govt. Roads in respect of Pattukkottai (H), C&M Subdivision. Road A, 01-CRIDP-19-20-O-2425-, Widening from Single lane to Intermediate lane and Improvements of Nattusalai-Thuvaranguruchi road at km 4/0-6/0 including upkeeping for a period of 60 months Road B, 01-CRIDP-19-20-O-2426-, Widening from Single lane to Intermediate lane and Improvements of Nattusalai-Thuvaranguruchi road at km 6/0-7/0 including construction of Retaining wall at Km 6/2,6/4 including upkeeping for a period of 60 months Road C, 01-CRIDP-19-20-O-2397-,Widening from Single lane to Intermediate lane and Strengthening of Nattusalai-Thuvaranguruchi road at km 0/0-2/0 including upkeeping for a period of 60 months Road D, 01-CRIDP-19-20-O-2440-, Improvements of Vadiyakkadu-Kalyanaodai road at km 4/0-7/4 including upkeeping for a period of 60 months Road E, 01-CRIDP-19-20-O-2441-, Improvements of Kumbakonam - Mannarkudy - Adirampattinam road KM 50/4 to Thirumakkottai road at km0/0 -2/0 including upkeeping for a period of 60 months "
766 Widening, Improvements and Improvements to Riding Quality to Government Roads including Dip Raising, Construction of Retaining wall, Widening of Slab Culvert and Upkeeping for a period of 60 months in Rasipuram (H) C&M Sub Division (Package-45) The Following works are involved in this package 1) Widening from Two lane to Three lane and Improvements of Rasipuram - Attur road at km 1/0 - 2/0 including widening slab culvert at Km 1/4 and Construction of Retaining Wall (MD402) including upkeeping for a period of 60 months (01-CRIDP-19-20-M-1328) 2) Improvements of Attaiyampatti - Masakkalipatti road at km 6/6 - 9/2 including dip raising at Km 6/10, 7/2, 7/4, 7/6 (MD46) and including upkeeping for a period of 60 months (01-CRIDP-19-20-M-1332) 3) Construction of Retaining wall at km 2/2 of Rasipuram - Attur road (MD402) (01-CRIDP-19-20-M-1356) 4) Improvements to Riding Quality at km 48/500 - 50/0 of Mohanur - Namakkal - Sendamangalam - Rasipuram road (SH95) including upkeeping for a period of 60 months (01-CRIDP-19-20-I-4554) 5) Improvements to Riding Quality at km 2/8 - 5/4 of Rasipuram Byepass road (MD) including upkeeping for a period of 60 months (01-CRIDP-19-20-I-4562) 6) Improvements to Riding Quality at km 2/0 - 3/0 of Rasipuram - Attur road (MD402) including upkeeping for a period of 60 months (01-CRIDP-19-20-I-4563)"
767 Widening, Improvements and Improvements to Riding Quality to Government Roads including Construction of Drain, Retaining wall and widening of Pipe Culverts and Up keeping for a period of 60 months in Sankari (H) C&M Sub Division (Package-27) The Following works are involved in this package 1.Construction Drain at km 6/8 - 7/2 of Magudanchavadi - Komarapalayam road (via) Edappady (SH 221) 01-CRIDP-19-20-S-0407 2.Improvements to Riding Quality at Km 2/2 - 4/0 of Kakapalayam - Attayampatty Road (MD133) including upkeeping for a period of 60 months 01-CRIDP-19-20-I-4533 3.Improvements to Riding Quality at Km.5/6 - 6/0, 6/2 - 7/0 and 8/0-9/6 of Kakapalayam -Chinnappampatty road (MD-134) including upkeeping for a period of 60 months 01-CRIDP-19-20-I-4536 4.Widening from Single lane to Intermediate lane and Improvements of Siddarkovil - Mattaiyampatty Road at km 0/0 - 2/0 including Construction of Retaining wall at km 0/10 including upkeeping for a period of 60 months 01-CRIDP-19-20-O-2618 5.Widening from Single lane to Intermediate lane and Improvements of Siddarkovil - Mattaiyampatty Road at km 2/0 - 4/0 Including widening of pipe culvert at km 2/8 including upkeeping for a period of 60 months 01-CRIDP-19-20-O-2619 6.Widening from Single lane to Intermediate lane and Improvements of Siddarkovil - Mattaiyampatty Road at km 4/0 - 6/4 Including widening of pipe culverts at km 4/8 & 5/10 and Construction of Retaining wall at km 4/8, 4/10 & 5/4 including upkeeping for a period of 60 months 01-CRIDP-19-20-O-2620 7.Improvements to Riding Quality at km 4/6 - 6/6 of Katchupalli - Alagappampalayam - Elampillai road including upkeeping for a period of 60 months 01-CRIDP-19-20-I-4544 8.Construction of Retaining wall at Km 2/4 of Elampillai - Kadayampatti Road 01-CRIDP-19-20-O-2633"
TRN : 719190 |  Salem - Tamil Nadu
Contract Value : 6.42 Crore | Agency Name : Highway Department
Tender award for widening, improvements and improvements to riding quality to government roads including construction of drain, retaining wall and widening of pipe culverts and up keeping for a period of 60 months in sankari (h) c&m sub division (package-27) the following works are involved in this package 1.construction drain at km 6/8 - 7/2 of magudanchavadi - komarapalayam road (via) edappady (sh 221) 01-cridp-19-20-s-0407 2.improvements to riding quality at km 2/2 - 4/0 of kakapalayam - attayampatty road (md133) including upkeeping for a period of 60 months 01-cridp-19-20-i-4533 3.improvements to riding quality at km.5/6 - 6/0, 6/2 - 7/0 and 8/0-9/6 of kakapalayam -chinnappampatty road (md-134) including upkeeping for a period of 60 months 01-cridp-19-20-i-4536 4.widening from single lane to intermediate lane and improvements of siddarkovil - mattaiyampatty road at km 0/0 - 2/0 including construction of retaining wall at km 0/10 including upkeeping for a period of 60 months 01-cridp-19-20-o-2618 5.widening from single lane to intermediate lane and improvements of siddarkovil - mattaiyampatty road at km 2/0 - 4/0 including widening of pipe culvert at km 2/8 including upkeeping for a period of 60 months 01-cridp-19-20-o-2619 6.widening from single lane to intermediate lane and improvements of siddarkovil - mattaiyampatty road at km 4/0 - 6/4 including widening of pipe culverts at km 4/8 & 5/10 and construction of retaining wall at km 4/8, 4/10 & 5/4 including upkeeping for a period of 60 months 01-cridp-19-20-o-2620 7.improvements to riding quality at km 4/6 - 6/6 of katchupalli - alagappampalayam - elampillai road including upkeeping for a period of 60 months 01-cridp-19-20-i-4544 8.construction of retaining wall at km 2/4 of elampillai - kadayampatti road 01-cridp-19-20-o-2633"
768 Widening and Improvements to Government Roads including Construction of CD works, Retaining wall and Providing RCC centre median and Up keeping for a period of 60 months in Mettur (H) C&M Sub Division (Package-34) The Following works are involved in this package 1) Widening from Three lane to Four lane and Improvements of Thermal Power Plant road at Km.2/0-2/4, including Construction of Retaining Wall at Km.2/2 and Providing RCC Centre Median (SH-158) including upkeeping for a period of 60 months (01-CRIDP-19-20-S-0366) 2) Widening from Three lane to Four lane and Improvements of Thermal Power Plant road at Km.2/4-2/8, including Construction of Retaining Wall at Km.2/6 & 2/8, Widening of Pipe Culvert at Km.2/8 and Providing RCC Centre Median (SH-158) including upkeeping for a period of 60 months (01-CRIDP-19-20-S-0367) 3) Widening from Three lane to Four lane and Improvements of Thermal Power Plant road at Km.2/8-3/2, including Construction of Retaining Wall and Widening of Slab culvert at Km.2/10 and Providing RCC Centre Median (SH-158) including upkeeping for a period of 60 months (01-CRIDP-19-20-S-0370) 4) Widening from Three lane to Four lane and Improvements of Thermal Power Plant road at Km.3/2-3/8, including Widening of Slab culvert at Km.3/6 and Providing RCC Centre Median (SH-158) including upkeeping for a period of 60 months (01-CRIDP-19-20-S-0368) 5) Widening from Three lane to Four lane and Improvements of Thermal Power Plant road at Km.3/8-4/2, including Construction of Retaining Wall Km.4/2, Reconstruction of Box culvert at Km.3/10 and Providing RCC Centre Median (SH-158) including upkeeping for a period of 60 months (01-CRIDP-19-20-S-0369)"
TRN : 719203 |  Salem - Tamil Nadu
Contract Value : 7.49 Crore | Agency Name : Highway Department
Tender award for widening and improvements to government roads including construction of cd works, retaining wall and providing rcc centre median and up keeping for a period of 60 months in mettur (h) c&m sub division (package-34) the following works are involved in this package 1) widening from three lane to four lane and improvements of thermal power plant road at km.2/0-2/4, including construction of retaining wall at km.2/2 and providing rcc centre median (sh-158) including upkeeping for a period of 60 months (01-cridp-19-20-s-0366) 2) widening from three lane to four lane and improvements of thermal power plant road at km.2/4-2/8, including construction of retaining wall at km.2/6 & 2/8, widening of pipe culvert at km.2/8 and providing rcc centre median (sh-158) including upkeeping for a period of 60 months (01-cridp-19-20-s-0367) 3) widening from three lane to four lane and improvements of thermal power plant road at km.2/8-3/2, including construction of retaining wall and widening of slab culvert at km.2/10 and providing rcc centre median (sh-158) including upkeeping for a period of 60 months (01-cridp-19-20-s-0370) 4) widening from three lane to four lane and improvements of thermal power plant road at km.3/2-3/8, including widening of slab culvert at km.3/6 and providing rcc centre median (sh-158) including upkeeping for a period of 60 months (01-cridp-19-20-s-0368) 5) widening from three lane to four lane and improvements of thermal power plant road at km.3/8-4/2, including construction of retaining wall km.4/2, reconstruction of box culvert at km.3/10 and providing rcc centre median (sh-158) including upkeeping for a period of 60 months (01-cridp-19-20-s-0369)"
769 Widening, Improvements and Improvements to Riding Quality to Government Roads including Reconstruction of Culverts, Construction of Storm Water Drain, Retaining wall and providing Paver Blocks and Up keeping for a period of 60 months in Mettur (H) C&M Sub Division (Package-36) The Following works are involved in this package 1) Improvements of Tholasampatty - Mallappanur road at Km.10/2-13/0 including Curve Widening at Km.12/2 and Construction of Retaining Wall at Km.11/2, 11/6 & 12/4 (MD1174A) including upkeeping for a period of 60 months 01-CRIDP-19-20-M-1320 2) Improvements to Riding Quality at Km.13/0-15/8 of Tholasampatty - Mallappanur road (MD1174A) including upkeeping for a period of 60 months 01-CRIDP-19-20-I-4534 3) Improvements to Riding Quality at Km.0/2-1/8 and 2/6-5/0 of Gonur - Mallikundam road (using Plastic Waste) including upkeeping for a period of 60 months 01-CRIDP-19-20-I-4538 4) Widening from Single lane to Two lane and Improvements of Approach road to Travellers Bungalow at Mettur at Km.0/150-0/300 including Storm water Drain and Providing Paver Block including upkeeping for a period of 60 months 01-CRIDP-19-20-O-2616 5) Improvements of Kolathur - Alamarthupatty road (via) Kurumbanur at Km.3/4-4/6 and 6/0-7/4 including Dip Raising at Km.5/10 & 6/2, Construction of Retaining Wall Km.5/10, 6/2 & 7/4 and Reconstruction of Box Culvert at Km.5/10, 6/2 & 6/4 including upkeeping for a period of 60 months 01-CRDIP-19-20-P-3669 6) Improvements of Kolathur - Thinnapatty road at Km.5/4-7/0 including upkeeping for a period of 60 months 01-CRDIP-19-20-O-2627"
TRN : 719199 |  Salem - Tamil Nadu
Contract Value : 6.04 Crore | Agency Name : Highway Department
Tender award for widening, improvements and improvements to riding quality to government roads including reconstruction of culverts, construction of storm water drain, retaining wall and providing paver blocks and up keeping for a period of 60 months in mettur (h) c&m sub division (package-36) the following works are involved in this package 1) improvements of tholasampatty - mallappanur road at km.10/2-13/0 including curve widening at km.12/2 and construction of retaining wall at km.11/2, 11/6 & 12/4 (md1174a) including upkeeping for a period of 60 months 01-cridp-19-20-m-1320 2) improvements to riding quality at km.13/0-15/8 of tholasampatty - mallappanur road (md1174a) including upkeeping for a period of 60 months 01-cridp-19-20-i-4534 3) improvements to riding quality at km.0/2-1/8 and 2/6-5/0 of gonur - mallikundam road (using plastic waste) including upkeeping for a period of 60 months 01-cridp-19-20-i-4538 4) widening from single lane to two lane and improvements of approach road to travellers bungalow at mettur at km.0/150-0/300 including storm water drain and providing paver block including upkeeping for a period of 60 months 01-cridp-19-20-o-2616 5) improvements of kolathur - alamarthupatty road (via) kurumbanur at km.3/4-4/6 and 6/0-7/4 including dip raising at km.5/10 & 6/2, construction of retaining wall km.5/10, 6/2 & 7/4 and reconstruction of box culvert at km.5/10, 6/2 & 6/4 including upkeeping for a period of 60 months 01-crdip-19-20-p-3669 6) improvements of kolathur - thinnapatty road at km.5/4-7/0 including upkeeping for a period of 60 months 01-crdip-19-20-o-2627"
770 Widening, Improvements and Improvements to Riding Quality to Government Roads including Reconstruction of Culverts, Construction of Storm Water Drain, Retaining wall and providing Paver Blocks and Up keeping for a period of 60 months in Mettur (H) C&M Sub Division (Package-36) The Following works are involved in this package 1) Improvements of Tholasampatty - Mallappanur road at Km.10/2-13/0 including Curve Widening at Km.12/2 and Construction of Retaining Wall at Km.11/2, 11/6 & 12/4 (MD1174A) including upkeeping for a period of 60 months 01-CRIDP-19-20-M-1320 2) Improvements to Riding Quality at Km.13/0-15/8 of Tholasampatty - Mallappanur road (MD1174A) including upkeeping for a period of 60 months 01-CRIDP-19-20-I-4534 3) Improvements to Riding Quality at Km.0/2-1/8 and 2/6-5/0 of Gonur - Mallikundam road (using Plastic Waste) including upkeeping for a period of 60 months 01-CRIDP-19-20-I-4538 4) Widening from Single lane to Two lane and Improvements of Approach road to Travellers Bungalow at Mettur at Km.0/150-0/300 including Storm water Drain and Providing Paver Block including upkeeping for a period of 60 months 01-CRIDP-19-20-O-2616 5) Improvements of Kolathur - Alamarthupatty road (via) Kurumbanur at Km.3/4-4/6 and 6/0-7/4 including Dip Raising at Km.5/10 & 6/2, Construction of Retaining Wall Km.5/10, 6/2 & 7/4 and Reconstruction of Box Culvert at Km.5/10, 6/2 & 6/4 including upkeeping for a period of 60 months 01-CRDIP-19-20-P-3669 6) Improvements of Kolathur - Thinnapatty road at Km.5/4-7/0 including upkeeping for a period of 60 months 01-CRDIP-19-20-O-2627"
TRN : 719200 |  Salem - Tamil Nadu
Contract Value : 6.04 Crore | Agency Name : Highway Department
Tender award for widening, improvements and improvements to riding quality to government roads including reconstruction of culverts, construction of storm water drain, retaining wall and providing paver blocks and up keeping for a period of 60 months in mettur (h) c&m sub division (package-36) the following works are involved in this package 1) improvements of tholasampatty - mallappanur road at km.10/2-13/0 including curve widening at km.12/2 and construction of retaining wall at km.11/2, 11/6 & 12/4 (md1174a) including upkeeping for a period of 60 months 01-cridp-19-20-m-1320 2) improvements to riding quality at km.13/0-15/8 of tholasampatty - mallappanur road (md1174a) including upkeeping for a period of 60 months 01-cridp-19-20-i-4534 3) improvements to riding quality at km.0/2-1/8 and 2/6-5/0 of gonur - mallikundam road (using plastic waste) including upkeeping for a period of 60 months 01-cridp-19-20-i-4538 4) widening from single lane to two lane and improvements of approach road to travellers bungalow at mettur at km.0/150-0/300 including storm water drain and providing paver block including upkeeping for a period of 60 months 01-cridp-19-20-o-2616 5) improvements of kolathur - alamarthupatty road (via) kurumbanur at km.3/4-4/6 and 6/0-7/4 including dip raising at km.5/10 & 6/2, construction of retaining wall km.5/10, 6/2 & 7/4 and reconstruction of box culvert at km.5/10, 6/2 & 6/4 including upkeeping for a period of 60 months 01-crdip-19-20-p-3669 6) improvements of kolathur - thinnapatty road at km.5/4-7/0 including upkeeping for a period of 60 months 01-crdip-19-20-o-2627"